Saudi Aramco Typical Inspection Plan: Fire Detection and Alarm Systems SATIP-B-014-01 Electrical
Saudi Aramco Typical Inspection Plan: Fire Detection and Alarm Systems SATIP-B-014-01 Electrical
01 6-Sep-15
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Fire Detection and Alarm Systems SATIP-B-014-01 17-Mar-16 ELECTRICAL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
PE or CE stamped construction
documents or an approved independent,
See See Ref. SAES-M-100 section Section 101.4.5.2 Certification of
1.01 third-party review letter referencing these
Remarks Remarks Construction Documents
plans with a PE or CE stamp to LPD and
FrPD.
Storage, Handling and Preservation Visual See See SAIC-T-5001 General - Indoor Electronic Equipment
2.01
Inspection Remarks Remarks I S Weekly Inspection by Contractor QC
3.00 INSTALLATION
4.00 PRE-COMMISSIONING
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
1
Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H 100% Hold Point for QC Inspection or Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
ELECTRICAL
CONTRACTOR/SUBCONTRACTOR
REMARKS
GENERAL NOTES
pation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of
struction Organization
advance. However, the inspection or test shall be performed as scheduled if the QA/QC
advance. Inspection or test shall not be carried out without the QA/QC organization
the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
Review of Documents
Review and Approval of Documents
100% Contractor Inspection
###
###