Professional Documents
Culture Documents
A. Requires Add-On Cost, Refer To Matrix
A. Requires Add-On Cost, Refer To Matrix
SITE NAME
Item Mat Code SERVICES
no
WORK ORDER
Unit of Measure
1 Setting of poles
P2005843 1.1 Pole installation (First 2 poles) Per pole
P2005850 1.2 succeeding cost per pole instln
2 Recover of Poles Per pole
P2005868 2.1 Recovery of poles ( first 1-2 poles)
P2005876 2.2 Succeeding cost per pole recovery
3 Installation of Guy & Anchor
P2001529 3.1 Guy & Anchor Piece
P2001560 3.2 Sidewalk Guy Piece
P2001537 3.3 Pole to Pole Piece
4 Installation of UG Cable- Copper
P2001578AO 4.1 Installation,Ug Cable,Cu,10-200 Prs Span
P2001594AO 4.2 Installation,Ug Cable,Cu,300-900 Prs Span
P2001586AO 4.3 Installation,Ug Cable,Cu,1200-2400 Prs Span
P2001602AO 4.4 Installation,Ug Cable,Cu,Add-On Lot
5 Installation of UG Cable- FOC
P2001610AO 5.1 Installation,Ug Cable,Foc,4F-216F Span
P2001628AO 5.2 Installation,Ug Cable,Foc,4F-216F,Add-On Lot
6 Recovery of UG cable
P2002873AO 6.1 Recovery,Ug Cable,Cu,10-150 Prs Span
P2002881AO 6.2 Recovery,Ug Cables,Cu,200 Prs Span
P2002899AO 6.3 Recovery,Ug Cables,Cu,Add On Lot
7 Installation of Riser Cable-FOC/Copper
P2001545 7.1 Installation,Riser Cable,Copper/Foc Piece
8 Installation of Riser Pipes
P2001552 8.1 Installation,Riser Pipes,2in,3in,4in Dia Piece
Ins tallation of Entrance Cable-
9
FOC/Copper-Aerial
9.1 Install ation of wal l s trap, (eye type or loop type)
P2001495 Piece
& lag screw
P2001487 9.2 Variable per meter (regardless of number of pairs) Meter
10
Civil Works, OSP & ISP- c/o Contract-With
Add-On Cost
P2000034 10.1 Construction,Basepad Set
P2001065 10.2 Hauling,Ag Cabinet,From Whse To Site Lot
P2002345 10.3 Provision,Guard Post Pr
P2001099 10.4 Increase In Length,Conduits Meter
P2001081 10.5 Increase In Height,Pedestal,1M Std Ht Meter
P2003319 10.6 Inst,Panelboard,Stainless Steel/Nema 4R Piece
P2001073 10.7 Hauling,Decomisioned Cab,Recovery Lot
P2000737 10.8 Demolition,Basepad,Existing Set
P2003111 10.9 Row Permit,Legworks,Brgy Lot
P2003129 10.10 Row Permit,Legworks,Homeowners Lot
P2003137 10.11 Row Permit,Legworks,Municipal Lot
P2003103 10.12 Retrofitting,Basepad To 3M Cabinet Set
P2002923 10.13 Reinforced Conc. Protect,Riser Pole Piece
P2002170 10.14 Sealing,Manhole (Generic) Piece
P2002154 10.15 Filling & Marking,Manhole Piece
P2002162 10.16 Marking,Manhole Piece
P2000828 10.17 Repl/Repr,Dlc,Mis-Aligned Cab Door Piece
P2000893 10.18 Repl/Repair,Dlc,Cab Cage,Right Door Piece
P2000901 10.19 Repl/Repair,Dlc,Cab Cage,Left Door Piece
P2000877 10.20 Repl/Repair,Dlc,Cab Cage,Lock Set
P2000844 10.21 Repair,Dlc,Cabinet Cage Anchorage Set
P2000810 10.22 Repair,Partial,Dlc,Cab Cage,Short Side Piece
P2000802 10.23 Repair,Partial,Dlc,Cab Cage,Long Side Piece
P2000869 10.24 Repl/Repair,Dlc,Cab Cage Hinges Pr
P2000885 10.25 Repl/Repair,Dlc,Cab Cage Repainting Lot
P2000919 10.26 Repl/Repair,Dlc,Front Door/Panel Piece
P2000935 10.27 Repl/Repair,Dlc,Side Door/Panel Piece
P2000927 10.28 Repl/Repair,Dlc,Front Plate, Batt. Cover Piece
P2000851 10.29 Repl/Repair,Dlc,Back Board Panel Piece
P2003053 10.30 Repl/Repair,Xcc, Front Door Cover/Panel Piece
P2003301 10.31 Rein. Conc,Srvce Box,Hndhole,1M3 Piece
P2003293 10.32 Rein. Conc,Srvce Box,Hndhole,1.3M3 Piece
P2003442 10.39 Welding,Manhole Cover Piece
P2000836 10.40 Foc Testing,Dlc,Migration,8 Core Lot
P2001024 10.41 Groundsys Measure,Dlc/Earth Megger Pikes Piece
P2001016 10.42 Groundsys Measure,Dlc,Correction Piece
P2000984 10.43 Fault Isolation Test,Ug Copper Only Lot
P2002055 10.44 Layout Tie Cable,100Prs And Below Lot
P2003418 10.45 Verification,Lines,100Prs And Below Lot
P2003541 10.46 Opening Splice Closure,100Prs And Below Spt
P2001032 10.47 Half-Tapping Tie Cable,100Prs And Below Lot
P2000760 10.48 Disconect/Rmoval Jumper,100Prs And Below Lot
14 Rehabilitation of UG Conduit-Requires
Add-On Cost, refer to Matrix
P2003459 14.1 Chipping Conc. Encasement,Filled Duct Meter-Run
P2003467 14.2 Chipping Conc. Encasement,Vacant Duct Meter-Run
P2002246 14.3 Laying,Pipe,1-Run Meter
P2002279 14.4 Laying,Pipe,2-Runs Meter
P2002311 14.5 Laying,Pipe,4-Runs Meter
P2002329 14.6 Laying,Pipe,6-Runs Meter
P2002337 14.7 Laying,Pipe,8-Runs Meter
P2002212 14.8 Laying,Pipe,10-Runs Meter
P2002220 14.9 Laying,Pipe,12-Runs Meter
P2002238 14.10 Laying,Pipe,16-Runs Meter
P2002253 14.11 Laying,Pipe,20-Runs Meter
P2002261 14.12 Laying,Pipe,24-Runs Meter
P2002287 14.13 Laying,Pipe,30-Runs Meter
P2002295 14.14 Laying,Pipe,36-Runs Meter
P2002303 14.15 Laying,Pipe,40-Runs Meter
P2002352 14.16 Provision,Pvc Slit Duct,4Diax 1.50M Piece
P2000299 14.17 Conc. W/O Reinforcing Bars,1-Run Meter
P2000323 14.18 Conc. W/O Reinforcing Bars,2-Runs Meter
P2000364 14.19 Conc. W/O Reinforcing Bars,4-Runs Meter
P2000372 14.20 Conc. W/O Reinforcing Bars,6-Runs Meter
P2000380 14.21 Conc. W/O Reinforcing Bars,8-Runs Meter
P2000265 14.22 Conc. W/O Reinforcing Bars,10-Runs Meter
P2000273 14.23 Conc. W/O Reinforcing Bars,12-Runs Meter
P2000281 14.24 Conc. W/O Reinforcing Bars,16-Runs Meter
P2000307 14.25 Conc. W/O Reinforcing Bars,20-Runs Meter
P2000315 14.26 Conc. W/O Reinforcing Bars,24-Runs Meter
P2000331 14.27 Conc. W/O Reinforcing Bars,30-Runs Meter
P2000349 14.28 Conc. W/O Reinforcing Bars,36-Runs Meter
P2000356 14.29 Conc. W/O Reinforcing Bars,40-Runs Meter
P2000190 14.30 Conc. W/ Reinforcing Bars,2-Runs Meter
P2000232 14.31 Conc. W/ Reinforcing Bars,4-Runs Meter
P2000240 14.32 Conc. W/ Reinforcing Bars,6-Runs Meter
P2000257 14.33 Conc. W/ Reinforcing Bars,8-Runs Meter
P2000141 14.34 Conc. W/ Reinforcing Bars,10-Runs Meter
P2000158 14.35 Conc. W/ Reinforcing Bars,12-Runs Meter
P2000166 14.36 Conc. W/ Reinforcing Bars,16-Runs Meter
P2000174 14.37 Conc. W/ Reinforcing Bars,20-Runs Meter
P2000182 14.38 Conc. W/ Reinforcing Bars,24-Runs Meter
P2000208 14.39 Conc. W/ Reinforcing Bars,30-Runs Meter
P2000216 14.40 Conc. W/ Reinforcing Bars,36-Runs Meter
P2000224 14.41 Conc. W/ Reinforcing Bars,40-Runs Meter
P2001339 14.42 Inst,G.I.Pipe(Sch.40),4In Diax6M Piece
P2001305 14.43 Inst,G. I. Coupling,4In Dia Piece
P2001321 14.44 Inst,P. E. Pipe,4In Dia X 6M Piece
P2001313 14.45 Inst,P. E. Coupling,4In Dia Piece
P2003517 14.46 Pushrodding And Mandrelling,Main Duct Meter-Run
P2003525 14.47 Pushrodding And Mandrelling,Sub Duct Meter-Run
P2003491 14.48 Installation,Guidewires,Main Duct Meter-Run
P2003509 14.49 Installation,Guidewires,Sub Duct Meter-Run
Unified Cost Addendum-Requires Add-On
15
Cos t, refer to Matrix
P2000463 15.1 Const,Basepad,0.5M High,Siemens Piece
P2000448 15.2 Const,Basepad,0.5M High,Eci Aslmx Piece
P2000422 15.3 Const,Basepad,0.5M High,Alcatel Piece
P2000430 15.4 Const,Basepad,0.5M High,At&T Slc Piece
P2000455 15.5 Const,Basepad,0.5M High,Ericsson Rss Piece
P2000505 15.6 Const,Basepad,1M High,Siemens Piece
P2000497 15.7 Const,Basepad,1M High,Eci Aslmx Piece
P2000471 15.8 Const,Basepad,1M High,Alcatel Piece
P2000489 15.9 Const,Basepad,1M High,At&T Slc Piece
P2000414 15.10 Const,Basepad,1M High,Ericsson Rss Piece
P2001347 15.11 Inst,Ac Power Lot
P2003012 15.12 Reliable Ccc,0.5 M High,Basepad Piece
P2003020 15.13 Reliable Ccc,1.0 M High,Basepad Piece
P2002006 15.14 Installation,1 Guard Post,4In Dia. Piece
P2002022 15.15 Installation,2 Guard Post,4In Dia. Piece
P2002014 15.16 Installation,1 Guard Post,6In Dia. Piece
P2002030 15.17 Installation,2 Guard Post,6In Dia. Piece
P2003186 15.18 Shoring,Mh Meter
P2003178 15.19 Shoring,Conduit Meter
P2003152 15.20 Scaffolding,H-Frame,1.2 Meter Set