Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

555
BOULEVARD
DRAWING NOTES
(THIS SHEET ONLY) MIXED-USE
1 (2) JUNCTION BOXES FOR 208 VOLT, 2 POLE DUAL ELECTRIC VEHICLE CHARGING STATION.
BUILDING
COORDINATE EXACT LOCATION AND ELECTRICAL REQUIREMENTS PRIOR TO ROUGH-IN.

N 2 120 VOLT, 20 AMP FEED TO MOTORIZED GATE, REFER TO MANUFACTURER'S WIRING DIAGRAMS AND N
SPECIFICATIONS PRIOR TO ROUGH-IN.

3 1" E.C. WITH PULL-WIRE TO MAIN ELECTRICAL ROOM FOR MOTORIZED GATE, REFER TO
MANUFACTURER'S SPECIFICATIONS PRIOR TO ROUGH-IN.
555 BOULEVARD NE
4 8' x 4' x 3/4" GRADE A/C PLYWOOD BACKBOARD PAINTED WITH (2) COATS OF FIRE RESISTANT GRAY
ATLANTA, GA 30308
PAINT. RUN #6 CU GROUND TO MAIN BUILDING GROUND.
1 2 3 4 5 6 7 5 PROVIDE SCALED DRAWINGS OF ELECTRICAL ROOM SHOWING THAT ALL CLEARANCES ARE MET
PER THE NATIONAL ELECTRICAL CODE PRIOR TO ORDERING EQUIPMENT. Goode
6 CONNECT TO ASSOCIATED EXTERIOR UNIT, REFER TO MANUFACTURER'S WIRING DIAGRAM PRIOR
TO ROUGH-IN. Van Slyke
M 7 INTERLOCK WITH EXHAUST FAN, REFER TO MECHANICAL DRAWINGS.
M
Architecture

2 4
E403 Architect
E403 16
Goode Van Slyke Architecture Inc
7 409 John Wesley Dobbs Avenue
A WL-P1-1 EH-P1-3
Atlanta, GA 30312
404.523.5525
PLUMBING J
EH-P1-2 HPP1- 16,18
018
L MAIN ELEC. L
017
H
H HPP1- 12,14 S
Civil Engineer
STAIR N Cresent View Engineering
100N S 211 Frasier Street
Marietta, GA 30060
678.324.8410
DSSO-P1-1
B HPP1- 28,30
HPP1- 3
Structural Engineer
Stability Engineering
1376 Church Street, Suite 200
K F K
Decatur, GA 30030
404.377.9316

Mechanical/Plumbing
AHA Consulting Engineers
3700 Mansell Road, Suite 200
Alpharetta, Ga 30022
C
770.992.8585
J J
Electrical
Bolden-Williams & Associates, Inc.
3066 Highway 29 South
Lawrenceville, GA 30044
HPP1- 15 HPP1- 17
770.279.0413
P1 2 J J 2
010 3 J J 3
Contractor
HPP1- 23 TBD
I PLUMBING I
018

HPP2- 23,25,27

DB-P1 (5 HP) HPP1- 8,10


H H

EV2- 12,14 EV2- 13,15 EV2- 16,18 EV2- 17,19

EH-P1-1

#8 J J #8 #8 J J #8
E
HPP1- 24,26
HPP1- 9 1 1
1 1 1

G F #8 #8 #8 #8 #8 #8 G COPYRIGHT © 2019 GVSA


VSTBL J J J J J J
016 EH-P1-5 Key Plan
S
EV2- 20,22 EV2- 21,23 EV2- 1,3 EV2- 5,7 EV2- 8,10 EV2- 9,11

ELECTRICAL ENLARGED POWER PLAN - PLUMBING 018


4 1/4" = 1'-0"
SRVC ELEV
003E
ELEV
F 004E F

F seal/signature

ORG
E EG
ISTERE D

IA
G
R
No. 5575
PROFESSIONAL

P1.5 E01/10/22

EN
NG I N E E R

RO
NA
L D L. B O L D
015

E E

rev date description

UNDERGROUND SERVICE UNDERGROUND SERVICE 7 02-16-21 MEP Parking


REFER TO RISER DIAGRAM REFER TO RISER DIAGRAM 16 01.10.2022 New Storage Room

MAIN SWITCHBOARD "MUB"


D G MAIN SWITCHBOARD "MHB" D

FUTURE TENANT METERS HOUSE METER


TRASH
HPP1- 41 MAIN ELEC. SPD
005 5
017
LOADING PANEL "EV1"
HPP1- 20,22 HPP1- 32,34,36
014 FIRE ALARM CONTROL PANEL
SPD
HPP1- 21 HPP1- 19
PANEL "EV2"
EF-P1-1 6
4
C H C
EH-P1-4 DSSI-P1-1
UNDERGROUND TELEPHONE HPP1- 1
SPD date
J
SERVICE, REFER TO SITE PLAN 08/28/19
7 PANEL "HPP1" phase
WL-P1-2 PANEL "HPP2" CONSTRUCTION
issued for
Issued for Construction
project number
18005.00

B B

ELECTRICAL FLOOR PLAN


1/10/2022 3:44:20 PM

ELECTRICAL FLOOR PLAN - PARKING LEVEL 1 - POWER ELECTRICAL ENLARGED POWER PLAN - MAIN ELEC 017 PARKING LEVEL 1 POWER
1 1/8" = 1'-0"
2 1/4" = 1'-0"
sheet number

A A
E403
4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

You might also like