Professional Home Builders, Inc d/b/a:

PHB Construction PROPOSAL


1701 N 74th street DATE
Omaha, Ne. 68114 9/28/2021
402-880-7075
Project description
Proposal Submitted To: and location:
All prospective general contractors

Attn: Estimating
PHB const. Proposes to provide installation for work stated below: Pricing Exclusions

Davis Bacon Wages


Unloading and stocking is included unless stated otherwise. P & P Bond
All labor will be performed in accordance with the plans and
specifications for the sum of:                                                                                                              $0.00
With payment as follows:
Monthly Progress billings with the
Payment due within 45 days of the closing date of the invoice.

Respectfully Submitted By PHB, Inc.


The proposal may be withdrawn if not used in 30 days Per Prints dated: 9/3/2021
Addendums:
Notes:
Any alterations or deviations to plans or specifications involving Cal Peacock, Estimator
additional costs will be executed only upon accepted change order Phone: 402-505-7308
All agreements are contingent upon strikes, accidents, or delays Cell: 402-909-2916
beyond PHB Inc. control. 
Extra mobilizations to "go back" caused by material delays will be an extra cost. Acceptance of Proposal
No field alterations to product that is normally factory prepped will be done without extra cost. The above prices, specifications, and conditions are sat-
All fastener holes/joints in millwork that is to receive jobsite finish will be filled by others. isfactory are hereby accepted. You are authorized to do the
work as specified. Payment is due in 10 days.