Professional Documents
Culture Documents
03 - Andianto - Bayu PERTAMINA BIOGAS FORUM
03 - Andianto - Bayu PERTAMINA BIOGAS FORUM
Development in Pertamina
Pertamina Research & Technology Innovation
November 2021
Palm OIL Mill Effluent (POME) Production
0.437
recovery
✓ Can be transferred beyond
physical boundary and
ton-CO2e/m3 POME time boundary
TOTAL
93,845
Key Assumptions:
In case of a conversion plant built in one Palm 1. COD 70.000 mg/l
oil mill with 35 tph FFB processing capacity, the 2. POME/FFB 0.7 m3/ton
total GHG Reduction will be : 3. Methane GWP is 25 CO2e
ton-CO2e/year 3
Pg. 3
Pertamina in Natural Gas Business
The Subholding Gas Co.
4
Pertamina in Natural Gas Business
Biomethane
Demand Infrastructure Techno Economic
Production Project Execution
Screening Analysis Analysis
Potential Analysis
6
Project Development of POME Biomethane Utilization
Biomethane
Demand Infrastructure Techno Economic
Production Project Execution
Screening Analysis Analysis
Potential Analysis
Biomethane
Demand Infrastructure Techno Economic
Production Project Execution
Screening Analysis Analysis
Potential Analysis
8
Project Development of POME Biomethane Utilization
Biomethane
Demand Infrastructure Techno Economic
Production Project Execution
Screening Analysis Analysis
Potential Analysis
9
Project Development of POME Biomethane Utilization
Biomethane
Demand Infrastructure Techno Economic
Production Project Execution
Screening Analysis Analysis
Potential Analysis
10
R&D of Methane to Building Block Chemicals
• C1 Chemical is least favorable
pathway of chemical building
block compared with
conventional naphtha cracking
pathway or syngas pathway.
11
Terima Kasih
12