Saudi Aramco Typical Inspection Plan: LEAK TESTING (Per SAES-A-004) 31-Dec-14
Saudi Aramco Typical Inspection Plan: LEAK TESTING (Per SAES-A-004) 31-Dec-14
Saudi Aramco Typical Inspection Plan: LEAK TESTING (Per SAES-A-004) 31-Dec-14
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
DOCUMENT
1.0 SPECIAL PROCESS (PRESSURE TESTING) REQUIRES BEST QUALITY PRACTICE, CPI & EFFICIENT METHODS IN PROCEDURES. PROPOSE BEST METHODS.
REVIEW
MATERIAL
2.0
RECEIVING
Verify Pneumatic Test Medium & Bubble Data sheets are available on bubble forming solution
2.1 SAIC-A-2004 SAIC-A-2004 RH R
Test Solution used in Leak Tests
3.0 APPLICATION
SAIC-A-2023, SAIC-A-2023,
3.2 Filling & Pressurization W W Ditto
SAIC-A-2020 SAIC-A-2020
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
1 the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3 organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection