Professional Documents
Culture Documents
Everything You Need To Know About Clinker - Cement Grinding - INFINITY FOR CEMENT EQUIPMENT
Everything You Need To Know About Clinker - Cement Grinding - INFINITY FOR CEMENT EQUIPMENT
1 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
2 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
3 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
4 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
if You read and understand this article , you will be ready to be a cement grinding area manager.
HGRS standard for a grate cooler is that clinker temperature should be 80°C above ambient
temperature. Reality is that it is a little bit igher (90°C-100°C).
Karl-Heinz has never measured more than 150°C clinker temperature at mill inlet. Depends on storage
time and whether stored inside / outside. Solution to satellite cooling is to pour water onto satellites
(Karl-Heinz saw this in Korea).
Example Chekka, clinker temperature > 150°C with coal, but then lower with petcoke (clinker made
from petcoke is finer à better heat exchange in cooler)
Feed size
Clinker density 1.4 (Dotternhausen).
Ball Mill
• Cement Lafarge max R5% >25mm, Holcim <50mm. Standard offer from mill manufacturer is
R5% >30mm
• Raw Meal max R1% > 30 mm (Lafarge). Holcim “<25 – 50mm”.
• For quartz, feed must be precrushed to <10mm. Note that 90mm are required to crush
quartz fed at <3mm. Quartz demands a high crushing energy AND a high grinding energy.
5 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
It is “accepted” that coarse clinker is in many cases easier to grind than fine clinker. Yet, when clinker
from the same kiln system is screened into coarse and fine fractions, lab testing is unable to determine
significant differences in terms of energy requirements at high fineness (see also clinker grindability).
On the other hand, some plants can tell when their clinker breaker has worn out. The oversized clinker
causes the mill to choke and lose production.
In general, a mill system is set up to accept clinker of a certain size (or PSD) and if it receives anything
different, then production rates are usually affected.
Clinker segregation is another well known situation which is a result of poor stockpiling practices (end
piles especially) and poor bin design and bin filling practices. If segregation is occurring, the mill feed
can swing from coarse to fine and back again. When the mill is receiving clinker that’s too coarse,
retention in the first compartment rises (and sometimes backspills) and the second empties and starts
to over grind. If the clinker becomes too fine then it flushes through immediately to the second
compartment and overwhelms it. Mill outlet fineness suddenly drops and the circulating load jumps
up rapidly.Some spectacular mill cycles have resulted from clinker segregation problems.
6 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Feed Moisture
Ball Mill
7 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Feed Chemistry
Limestone specific weight = 2.7 g/cm3
SO3 Effects
The clinker SO3 content has been recognized as having an impact on grindability. Higher SO3 in
clinker results in a reduction in grindability and increases specific power consumption per ton. Also,
increasing SO3 (above optimum) content in clinker results in a decline of the 28 day cube strengths at
a constant Blaine. It is important to watch for this as a lot of plants switch to higher sulfur (and
cheaper) fuels.
It has not been proven conclusively that the grindability of weathered or stored clinker is significantly
different than that of fresh clinker. The greater impact seems to be from the condition of the
weathered or stored clinker (i.e. wet or dry, fine or lumpy, warm or cold, etc.) and its effect on the mill
system.
For instance, if the clinker is wet, the production rate will drop if the mill system cannot accept
additional or replacement moisture. If the clinker is stored outdoors, it may be very fine as a result of it
being passed over many times with a bulldozer; or it may be chunky from hydration effects, or a
combination of the two. In this case, the first compartment ball charge may not be capable of
accepting a feed size which varies greatly from that of fresh clinker without a corresponding loss of
production. On the other hand, a comparatively large amount of fines have been known to result in a
production rate increase. As a rule with weathered clinker, it is necessary to increase blaine to maintain
8 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
strengths and this will cause a plant to lose production. This also depends on the addition rate.
In summary, the mill system limitations have more impact on production rates relating to weathered or
stored clinker versus fresh clinker than does the grindability of the clinker itself. A ball mill is
optimised for certain conditions – if these are changes, production will drop.
To date, research indicates that grinding energy for up to 3,000 blaine rises with:
Item [2] relates to raw mix chemistry. Items [1] & [3] relates to overburning. Large alites means over-
burnt clinker thus it’s harder to grind. Clinker with a lot of pores are easier to crush. Some (not all)
plants can monitor their grindability by watching the clinker literweights. As it rises, the clinker
becomes over-burnt; sometimes balls up into bigger pieces; and sometimes it gets very dense (no
pores). Good literweights are usually between 1250 and 1350. Watch out if gets above 1400. Note
that some plants make a very fine yet seemingly hard to grind clinker. The researchers have observed
that a high proportion of big alite crystals can be found in the fine sizes, in these cases.
On the other hand for fine grinding (> 3,000 blaine), the main factors become:
As the cement particle gets smaller the pores disappear and no longer become a factor. Increasing the
amount of grinding aid will make the cement easier to grind.
Hard burning = hard grinding. Hard burning may be necessary when the fuel burning is not optimal
9 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
FEED BINS
Typical problem: slag or other composite cements milled in systems designed only for OPC. Therefore
2 bins instead of 3 > often dosing problems since slag or other component is dosed with a front-end
loader.
Or, there are 3 bins, but they are designed for clinker or gypsum and not the mineral component.
Feed bins have sides at different angles in order for the material to flow at different speeds. This
imparts shearing forces on the material and thereby prevents accumulation of material in the bin
corners.
Expanded Flow
Expanded exit flow means that the exit box diverges in the direction of the flow. This allows material
from the part of the bin nearest the flow direction to fall.
This can also be achieved by having a straighter side in the direction of the flow.
10 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
WEIGHFEEDERS
11 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
12 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
FEED ARRANGEMENT
Step-chute is favoured arrangement.
Below: FLS feed chute (new generation into slide shoe mill)
13 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
DRYING
Drying Targets
Intermediate diaphragm 90-95°C. But Colonel = 65°C, without problems.
Drying Capacities
14 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
• End Discharge Mill max 4% drying with hot gases, 1.5% without
• Absolute drying capacity depends on the material size and if the moisture is surface or in the
pores. Take example of sticky clay which rolls down preblending pile making large clumps à This
is difficult to dry.
• 5-7% may be possible to dry without a drying chamber but accepting a lower production
(depends if moisture is surface water or in pores).
• 1% additional water = 10% less capacity, when no excess of drying capacity.
• Greater than 7-8% definitely requires a drying chamber
• Max hot gas temperature 450°C for roller and 350°C for ball mill trunnion bearing (but note that
Réunion is 550°C above trunnion), 250-300°C for roller press separator bearing.
• Center Discharge Mill: 1st compartment hot gases only, max 10-15% with kiln air + extra hot air.
• Air Swept Mill: no intermediate diaphragm (pressure drop too great). Therefore single
compartment, therefore small feed granulo / low hardness particles required.
• Raw Mill Exit Moisture approximately 0.4%.
• 4 stage preheater systems are generally able to dry raw meal up to 8% moisture. 5 stage 6.5%,
6 stage 5.5%.
• Max Gas Air Speed (tube) <2m/s WITH hot gas only (otherwise 1.5 m/s). Can go >2m/s though
if there is no excessive wear on the intermediate diaphragm and its centre screen.
15 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
• Hot gases from hot gas generator <1300°C. Standard temperature with a hot gas is 400°C, ideal
is 450°C. Need adequate cooling on the trunnion bearings. Max Bearing temperature typically
60-70°C (??).
• Introduce gases at <350°C if no drying compartment or drying compartment is integrated into
the mill, <700°C if an overhanging drying compartment. Drying efficiency:
• Create tubulence in drying chamber by installing impact plate but watch for influence on the
system pressure drop.
• Make sure that material is lifted to provide a full curtain of material. Watch for influence on the
system pressure drop.
• Maximise retention time of the material by installing a weir at the outlet. Verify impact on the
mill motor.
16 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Flash dryer. Desagglomeraator breaks up feed which is fed to horizontal(vertical?) pipe where it
meets hot gas coming from the bottom. The particles are carried upwards and dried at the same time.
High gas speed required to compensate for terminal velocity of the particles. Material limit is function
of pressure drop. Specific Load: <500 kg H20 / m³.h. feed size <20mm.
• KILN GAS is often used for the raw mill instead of the cement mill because the temperatures are
higher than cooler air (typically 300 –350°C) and the raw meal is generally more moist than
cement. Kiln gas has high CO2 / CO content, and is therefore an explosion and safety hazard in
the raw mill.
• COOLER GAS is used for cement mills because it is generally stable (more independent of kiln
performance than kiln gas). Note however that cooler gas goes preferentially to the kiln air
(high in O2), and only the excess supplies the cement mill.
????
Overhung cooler is located on the other side of the trunnion. Often the metal is thinner etc because
there is no ball charge. Dust Load at raw meal outlet.
17 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
18 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Rotary Dryer
19 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Performance :
Flash Dryer
20 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Performance :
Operating Costs
21 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Fuel Sources
HGG exit temp (combustion gases) 1869°C, O2 2%, CO2 10.5%, H20: 134 g/Nm3
8-9 litres of oil per tonne are required to dry a 10% blastfurnace slag in PL.
Pedro Leopoldo decreased from 11 litres to 7 litres per tonne of slag using oil.
22 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
If there is CO then there is a lack of Oxygen. There should be about 10% oversupply of O2 at least.
check O2 in return gas ahead of HGG if it is a inert system. The primary air fan should give a good
pressure to the burner, the head can be optimised to give a flame without any colour. No colour =
good burning. If using solids, then check momentum thru burner and density phases in the solids flow.
Pressure of gas at HGG outlet should be constant -3 to -5 mbar. any variations (caused by feed maybe)
will impact the burner and cause inefficient burning.Additionally, if you can measure at 90 degree
angles multiple places you can check temperatures and verify good mixing downstream of hot and
cold gases. (Remember my idea of using a drill and just boring holes in any place, that’s the idea here!)
It is critical if temp before mill is reading X and actually most of the gas has temp Y because of
separated flow.
Heat Balance
Heat Balance
23 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
• Calculate the fresh air required to cool the product to the specified temperature at the mill exit
• Calculate the quantity of hot gases required to achieve the product with the specified moisture
For the drying, the program first uses the kiln and cooler gases specified in the input section. If this is
too much, it will bypass the mill and go straight to the filter. If it is not enough it will use gases from a
supposed hot gas generator.
• The program calculates an estimation of the available KILN GAS based on kiln throughput.
• For the available COOLER GAS, need to ask TPT on a case-by-case basis.
• There is no direct to filter gas loop for cement and coal mills. The available amount of kiln and
cooler gases must be modified manually to reach 0 m3/h excess gas.
GRINDING
24 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Mill Speed
Critical Speed = 42.3/sqrt(diameter)
>75% – fast
70-75% – “normal
Kurt Breitschmid from ??? report: The mill with a L/D ratio of 2,9 [-] is rather short for grinding cement
with a fineness >3’500 [cm2/g] according to Blaine.
Lafarge:
25 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
HGRS:
Chamber Lengths
Lafarge:
FLS philosophy is of long 1st chamber and short 2nd chamber. In the second chamber there is a narrow
range of ball charge and so there is no possiblity for classifying the charge. Therefore non-
classifying (dragpeb) style liners are used. These liners should NOT be installed in a long second
chamber or where there is a wide range of ball sizes.
The maximum ball size that can be used with these liners is 50mm.
26 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
According to FLS, the corrugated 2nd chamber liner provides the necessary lifting and also prevents
slippage between liners and balls. Also maximises power uptake due to the thin profile (+2.7% kW
compared to traditional classifying liner for a 4.6m diameter mill)
FLS mills have large centre openings. They allow the ball charge to be higher than the centre screen
level when the mill is at stop because when the mill is running, the ball make a banana shape around
the centre screen, therefore the screen is not damaged.
Dear Mr Ortega,
For closed circuit mills grinding OPC as well as CEM II type products, the FLSmidth default CII media
charge is 40% 25 mm, 40% 20 mm and 20% 15mm (~38 m^2/t). This charge is combined with a
relatively low design circulation factor, reflecting that the rather fine media charge works with good
grinding efficiency up to ~2000-2200 Blaine at the mill exit. This also means that we would use the
same design charge for say 12% R45 µm and 5% R45 µm, as the design circulation factor would be
adjusted for maintainng an approximately unchanged fineness at the mill outlet.
A coarser CII charge wil have lower grinding efficiency and require a higher design circulation factor.
This will give a coarser product at the mill outlet and thus reduce dry coating. The balance between
lower grinding efficiency and reduced coating will depend both on the material and the
Length/Diameter ratio of the mill.
FLSmidth A/S
Process Design
Vigerslev alle 77
DK-2500 Valby
27 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
At Intermediate Diaphragm
• <5% R1.2mm at inlet to the second chamber is necessary for a ball charge of 30mm.
At Discharge Diaphragm
• <0.35% water in the mill exit product since values greater than this may lead to hydration à
reduction in strength. Keep dew point under 60°C and there will be no hydration ??
• Holderbank: 15-25% R90, max 5% R200
• Lafarge: <5% R0.5mm, <30% R0.2mm before the discharge diaphragm.
• Blaine at the end of C2 is usually half that of the final blaine, or 40-60% for typical circulating
loads.
28 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
1. Austin, Klimpel and Luckie – „Process Engineering of Size Reduction: Ball Milling“.
1. U = volume of material / empty volume between balls
2. X-axis Ballcharge filling level
3. Y-axis specific electrical energy consumption of mill kWh/t mill.
1. Energy Input for Cement Grinding, von H.-G. Ellerbrock and B. Schiller, Dusseldorf, ZKG – Nr.
2/1988)
2. Review of 11 mills showed the following results. They used kWh/t of mill throughput as a bench
mark given that they were grinding to a mill exit of 1800 cm2/g. All mills were running at 55% to
75% of critical speed.
29 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Practical results: Azergues. 100% > 72% of the charge (= 30% filling à 21.6%). Throughput
100% >80%. KWh/t mill 100% > 91%.
1. Austin, Klimpel and Luckie – „Process Engineering of Size Reduction: Ball Milling“.
Conclusions:
30 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
• 40% gives 3.8% more production than 30% if the material level is optimised.
Lafarge best practice: in a non-sold out market, it is typical to maintain the 1st level charge at 26-28%
filling in order to optimise kWh/t without penalising production too heavily. The second chamber is
usually 2% higher than the 1st chamber level i.e. 28-30%.
Loading can be reduced to 22% filling for OPTIMUM kWh/t if production really isn’t needed. This is a
STRICT MINIMUM due to increased likelihood of damage on shell liners in C2.
For high market demand, increase the filling level in the C1 to 32-34%, C2 34-26% according to:
Ball level in the inlet trunnion max 50-75 mm above the level.
When filling levels in C2 are >34%, the effect of classifying liners in often lost.
Optimimum filling level occurs between 0.6 and 1.1. This is independent of the amount of balls used.
BUT: SEE Austin, Klimpel and Luckie which suggest the opposite.
31 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Robert’s Experiences:
1. Joliette: 2 different liners used in a monochamber mill. At this point, the ball charge size
distribution is mixed
2. La Réunion. The plant used 2 very similar classifying liners of the same dimensions and wear
profile. Nonetheless, where the 2 liner types met, there was a strict line defining the loss of the
classifying action
3. ?? Can’t remember plant: The mounting of the classifying liners was slightly wrong – there was a
2 cm gap between liners in the middle of the chamber, which was filled with a ring of 20 mm
balls. At this point, as strict disruption of the classifying effect was observed
4. Many mills: where unground clinker particles get through to the 2nd chamber, they cause
localised swelling of the charge. Often, the smaller balls then migrate to the middle of the
chamber leading to swollen mounds in the middle of the chamber.
Others’ Experiences
Hanspeter example: Germany? During performance test material filling level was high and ball
charge reverse classified. Reduced feed and filling level and after 1 day the ball charge was
reclassified.
32 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
LAFARGE:
Reverse classification occurs when particles greater than 1/3 the diameter of the void space between
balls are NOT crushed immediately. The reasons are:
• An overall filling level more than 3% greater than the calculated filling level
• In C1 often the balls are visible but the overall level is more than 3% above the calculated
value.
• Alternatively the first part of the C1 might be swollen (especially with high returns load) and the
zones behind are empty because the retention is greater in the swollen area. In such cases there
may be an inverse classification of the charge (see next point)
• Reverse classification in 1st or 2nd In this case the material is carried by gravity down the “slope”
along the length of the compartment. In addition it is noticed that the balls in this area migrate
down the slope too and they may stop in the middle or the end of the compartment. Often it is
the BIGGER BALLS THAT MIGRATE à reverse classification in the C1 and C2.
• High variations in power draw at the mill motor
Residence Time
Open Circuit: >=12 minutes
Test using fluorosceine, mixed in a bag with some clinker, then added to the feed belt. Sample at mill
exit every 30 seconds for a period of ~25 minutes after adding the clinke+fluorosceine. Need
specialised measuring equipment in lab.
Ball Coating
33 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Ball and liner coating can occur in raw as well as finish grinding. Ball coating can be a result of the
following conditions:
Adequate ventilation will help alleviate persistent problems. Mill ventilation can serve two purposes to
reduce ball coating in mill temperature problem situations. It can take heat away from the mill as it is
created by the grinding, and it can take water vapor away from introduction with the material or from
water sprays which provide additional cooling.
The present theory concerning ball coating is that as the particles of feed shatter under the impact of
the ball charge, the surface equilibrium becomes unbalanced. This unbalanced condition causes an
attraction between the individual particles of feed and between the feed particles and balls resulting in
ball and liner coating, material agglomeration in the mill and “pack set”. Ball and liner coating cushions
the impact of balls, and in severe cases can affect lift. Material agglomeration affects grinding as well
as separation.
Pack set is that condition where bulk cement, after being compacted by vibration, requires
considerable mechanical effort to start initial flow. Actually, pack set bears much the same relationship
with cement flowability, as starting friction bears to moving friction. Pack set, like starting friction,
requires more force to start material flow than that required to keep the material flowing. Pack set has
become a serious problem in recent years because of the cement industry’s use of large diameter mills
which causes a higher material surface unbalance and the increased transportation of cement in bulk
quantities.
Grinding Aids
The addition of a grinding aid spreads the feed particles farther apart, thus exposing more surface area
to the grinding media, resulting in increased production. The grinding aid adheres to the individual
particles, thereby restoring the particles to a balanced state, thus reducing agglomeration, ball coating
34 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
The quantity of grinding aid used in a particular mill is dependent on the size of the mill, feed size,
product size, type of clinker being ground, etc. For instance, in large diameter ball mills, the impact
force of the grinding media is so great, that a high material surface unbalance prevails in the
mill when grinding all types of clinker, thus requiring a grinding aid at all times.
The higher the fineness, the more grinding aid that must be used to restore the feed particles to a
balanced state. Normally, grinding aids are added in a 15% concentrated solution (1:7 grinding aid to
water – helps the dispersal of grinding aid in mill), at approximately 2-2.5 Lb./Ton for medium fineness
and 3-4 Lb./Ton for high fineness cement. (Check with your supplier).
Price
35 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
GRINDING TOOLS
Ball Charge
The reasons for the optimum are as follows. If the balls are too small then they don’t have the inertia
to properly nip the material and break it. For example; grits (or spitzers) in the second compartment,
the cascading small balls don’t hit with enough force to fracture the grains so they are worn smooth at
a slow rate and retained in the mill, causing material transport problems.
If the balls are bigger than the optimum for the feed size then the lower number of contact (nip) points
reduces the specific breakage rate. Note that if a particle size is smaller than either the optimum for
both the smaller or larger ball the specific breakage rate of the smaller ball is superior, this is why finer
balls in the second compartment work well.
36 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
LAFARGE
HOLCIM
30-20mm 4.7
WARNING: Depending on the source foundry bulk density values have been known to vary
considerably.
There is a general contractual specification that <3% of charge breaks after being in the mill.
37 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Example of delivered ball charge in La Réunion from a South African foundry (license(?) Maggotteaux.):
D = 9.6e^(-0.13x)
38 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
WARNING: values may vary from supplier to supplier. The above table should be considered as
approximate values. Sampling is recommended for bulk density and porosity index calculations.
100mm balls
• The use of 100mm balls is possible, but should be avoided as wear and liner damages will
increase. In this case, the usage of 60mm balls should be reduced to a minimum.
• Big balls climb to the highest position à increased wear and breakage of liners and other balls.
• Bigger balls means less balls which means less contacts which means less crushing
90 mm 3 kg/ball
100mm 4 kg/ball
Raw mill
For the RM it is considered to have 40% – 45% of the total mill power consumption in the first
compartment.
For raw mills it is most common to use a ball charge with the coarse grading (up to 50% of 90 mm
39 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Cement Mill
The ball charge tendency in the 1st compartment is to use the coarser of the gradings available. When
producing high Blaine Cement it is the objective to use less tonnage. Achieve nearer 8-9 kWh/t at
the target mill output instead to go for a more fine ball charge (??)
Using a pre grinding circuit the maximum ball size could be as low as 60 mm. These cases are very
specific and can not be published as a common solution.
Some plants use on 90, 80, 70 mm balls in 1st chamber. E.e. San Sebastien.
40 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Discussion
IF THE SEPARATOR IS OVERLOADED, USE A FINER BALL CHARGE SO THAT THERE WILL BE LESS
CIRCULATING LOAD AND THEREFORE LESS SEPARATOR BYPASS.
The purpose of the transition zone is to grind the oversize that manages to get by the partition which
is too large for the main second compartment charge to grind. Usually it is composed of 2,
(sometimes 3 sizes). In metric, we usually pick 50 and 40 mm Ø’s. In U.S. units we pick 2″ and 1.5″ Ø’s.
The transition zone constitutes the first part of the second compartment.
In any case, for each size in the transition zone we extend the value (N) and the use the exact same
number of balls for each size. Back-calculating we can then determine the weight and the percentage
that represents.
Note that transition zone design can only be used effectively if there is a good classifying action from
the liners. Most people also get a little nervous with such a small tonnage in the transition. Thus in
practice they tend to be larger than what is recommended by the Slegten model.
Comparing the two curves we can observe that the 1989 design has a slightly coarser ball charge in the
first compartment than what the Polysius model would suggest using, (average ball weights were
calculated to be 1.65 kg/ball vs. 1.5 kg/ball respectively). However it’s the reverse in the second. In fact
Polysius model does not recommend any 0.75″Ø balls at all.
Comments:
In general the Polysius model is simplistic – one curve fits all mills. As a rule of thumb, it suits raw mills
and especially monochambers very well. Solutions will tend to have coarse second compartment ball
charges.
41 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
The Slegten model divides the mill ball charge into 3 parts: first compartment, transition zone and the
second compartment. The approach in designing the ball charge is different in each. However, a
recommendation from Slegten will vary from their own model since they take into consideration
field inspections, their own experience, and their own rules of thumb for mill idiosyncrasies. (They are
not all that different from the rules discussed in “Practical Fundamentals …. Volume 1”.) This is after all
how they make money on consulting. In general the Slegten model is compatible only with mills
with classifying linings in the second compartment.
Notes
Is based on assumptions:
1) Optimum ball sizes are related to particle sizes according to the following equation: d1/d2 =
(D1/D2)1.7
• Particle size distribution along the mill axis can be expressed as a function of % residue at
particle size di:
Raw Mill
It will be beneficial using a finer ball charge. The limit is given by the slot size of the partition wall.
42 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
SLEGTEN
The second chamber Slegten standard ball charge composition for an OPC cement varies with the
cement fineness as indicated in the table:
The repositions to keep the ball charge parameters constant are calculated according to Slegten
criteria.
As an indication the HMC standard ball charge for 3’000 [cm2/g] has 62 [g/u] and 29.4 [m2/t] as
average ball weight and charge specific surface respectively.
HOLCIM
43 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Here, the grinding efficiency and the manufacturing technology for the balls do not allow one to use a
large variety of ball sizes. Usually, the range in Ø, (from largest to smallest) should not exceed 0.75
inches (~20 mm). One must make a compromise then, between using very large Ø’s or very small Ø’s
in the second compartment. Your choice must take into account the effect of porosity will have on
throughput and the separator. If you work with too many sizes in such a compartment, then you’ll
experience reverse or double reverse classification and a drop in production. It is better to work
with a fairly flat gradation of ball sizes.
SLEGTEN
HOLCIM
44 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
When composite cements are ground the fineness according to Blaine is not anymore as reliable as
with OPC. A fineness correction must be introduced.
According to Slegten laboratory to calculate the equivalent OPC fineness of composite cement the
following values:
Ø Fly ash: Fly ash fineness [cm2/g] * actual fly ahs content in [%].
Ø The OPC equivalent fineness must be calculated for every cement type ground in
Ø The ball charge will be chosen from table 1 or 2 (closed or open circuit mill)
Ø If the OPC equivalent fineness is, for example, 3’700 [cm2/g] interpolation of the
Ø The [%] of balls ranging from 60 [mm] to 40 [mm] has to be adapted to the
45 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
operation condition of the first chamber (specific energy given to the material, state
© If the first chamber supplies no coarse material to the second chamber, a
smaller amount of these balls than reported on the tables will be required,
© On the contrary, when coarse material can be supplied to the second
increased.
Ø The calculated ball charge must always be compared to the actual ball charge
because:
© if the actual ball charge is finer than the calculated one the interpretation of
the process parameters of the grinding circuit will help to decide if a finer
Net wear rate = process wear rate (loss of tonnage inside the mill during grinding)
Gross wear rate = purchasing wear rate (takes into account the balls thrown away during sorting,
either too small for compartment or scrap), is therefore more than the net wear.
A rough estimation can be calculated considering a global net wear rate of 1.1 [g/kWh] (Stephane).
Gross wear rate 1.5 g/kWh (my estimate). Wear rate is the same for raw material and cement.
Different for slurry grinding (6 times more).
46 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
This value can change a lot depending on the cement composition and the abrasivity of these
components. For example, for pure slag grinding the value can be doubled.
Compartment 1
Compartment 2
Application:
In any other case the working conditions are “hard”. If more than one of the above-mentioned points
are given during a mill operation the working conditions are very hard.
47 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
If the operating conditions are much more favourable than the one above (speed far below 76 %
and/or filling degree >>28, the material level in the chamber is good) the working conditions are very
soft.
• To avoid changes in the steel structure and therefore damage of the liner, the indicated
operating temperatures (T operation) must not be exceded. Also heating up or cooling must be
done according to the indicated gradient temperature.
• For high alloyed steels a perfect support of the plates must be granted to avoid plates breakage.
• For medium and high alloyed steels the hardness can be modified through specific heat
treatment to reach a better compromise between wear and impact resistance.
Note: for identical liner design, alloy composition and heat treatment the lifetime
reached will be the same and independent from the liner manufacturer.
Estanda: In first chamber design for maximum 3% expansion of the ball charge. (Also Lafarge)
48 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Liners
Impact on Process
Process Design
Correct design is a function of the expansion of the charge which allows material to penetrate the
charge, and the lifting angle defined as the angle between the vertical and the line between the top
ball and the centre of the mill.
1st compartment – low hardness, high impact strength. Opposite for 2nd compartment (abrasion
resistant).
High Chromium alloyed cast steel – Most Used, impact strength 4-10 J/cm²
49 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Classifying: every row for small mills, every two rows for medium mills, every 3 for large mills.
Classifying angle increasing with mill size.
• Classifiying liners only work if ball filling level is <35% and chamber L/D is >1.5.
• The flat parts are corrugated, and the sloping parts are not. Therefore………
• Above volume load of 34-36%, the traditional classifying liner breaks down.
• NOTE: The X-Class classifying effect breaks down at critical speeds >80%.
• Typical production rate increase from non-classified to classified à 6%. This is because the
classifiying liner allows the efficient use of the existing fine ball charge, and further, allows a
further increase in the amount of fine ball charge.
Lifetimes:
Raw Meal: 35000 hours 1st chamber, 70000 hours 2nd chamber.
Rubber Liners – Wet grinding (steel corrosion, good abrasion resistance for balls<65mm)
Conversion from non-classifying to classifying liners in short mills can reduce filling capacity by up to
5% (check!)
Liner Bolting
50 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Diaphragms
Diaphragm Design
10-20 cm2/tph
Selecting Diaphragms
The type of diaphragm that suits a defined application can be found based on the following criteria:
Mill type: cement mill, dry process raw mill, wet process raw mill.
• Diaphragm location:
• Raw mill: transfer diaphragm at the drying chamber outlet, intermediate, peripheral
discharge for a double rotator mill and outlet diaphragm.
• For a cement mill: intermediate or outlet diaphragm. For the case of
• Moisture content of the mill fresh feed. Above or below 2 [%H2O] content.
• The diaphragm type: the name indicated refer to Magotteaux – Slegten denomination. For
details about each type of diaphragm, please, see B14.2 reg. 8 and B14.1 reg. 2.
• Diaphragm characteristics
• The diaphragm frame can be manufactured or cast. The second one is only use in special
applications where wear is very high.
51 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Machined plates have a greater lifetime than cast plates of the same slot width.
Intermediate:
Chekka > trunpet at the exit of diaphragm lets material flow out of diaphragm outside the air stream
BUT also accelerates the material in the gas stream > uses less of C2 charge.
Most important design criteria are the slot width and total slot area.
From Lafarge best practice papre, experience shows a 5% increase in mill throughput when installing a
flow control diaphragm after a non-flow controlling diaphragm.
Pfeiffer design makes the material flow out of 3 and 9 O’clock positions thereby not entraining the
material in the air-flow > increase in effective grinding length + reduced wear of balls near diaphragm.
Front plates
• Cement slot width: Slot width normally 6mm, but may be 8mm in the case of moisture content
> 2% in order to avoid clogging.
• Raw Meal slot width: 8mm intermediate
• Concentric slots lead to less blocking
• Thickness is 40-60mm when new, 15-30mm when worn out, Pfeiffer 8-10mm.
• Inside rings wear faster than outer rings.
Back Plates
• Thickness is 40-80mm when new, 15-30mm when worn out, Pfeiffer 8-10mm.
• Plates with slots provide less resistance to air flow, but impact negatively the material flow
52 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
control.
Central Opening
• Should be as large as possible for minimum air resistance, may be adaptable to the filling level.
• Grate is only a security measure against balls passing between chambers in the event of a
blockage.
End diaphragm
Centre discharge mill – single diaphragms, slots 2mm larger on fine compartment side.
Slot width:
OPC 7-10 mm
Mill Head
Tendency to use slide-shoe bearings on large mills. There are too many stresses on large mills which
have trunnions.
For trunnion mills, the end plate is either welded directly onto the shell or is bolted. The end plate is
usually bolted to the trunnion unless it is cast as one piece if small. For proper direct welding a steel
with low sulphur content is required.
Mill head plates which get damaged > plates circulate in the mill and damage the liners.
Mill Shell
• Mill Shell – thicker in the middle.
• Trunnions afford greater bending stress (12 – 18 N/mm²) compared to 9-10 for shoe bearings.
53 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Magotteaux Rules:
Liners
54 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
The graphic below gives the distribution of the gross and net wear rate in the Group for cement
grinding based on ATR 1’998.
The average net wear is 14.9 [g/t] while 28.7 [g/t] for the gross wear rate. This means that about 50 [%]
of the liner weight is not being used. Known cases show that within 15 – 20 [%] of the liner initial
weight can be worn before the liner looses its function.
P2 = P1.(V2/V1)^2
55 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Laminar Flow:
P2 = P1.(V2/V1)^1
In a vertical mill:
In a bag filter:
P2 = P1.(V2(v1)^1.4 (due to laminar flow through bags. Only turbulent at inlet and outlet)
Mill ventilation
Objectives:
Target 100°C at the intermediate diaphragm, and less than 90 at the mill outlet? Drying must be
completed by the intermediate diaphragm.
Air temperature is generally 5°C lower than clinker temperature. If even lower à false air.
56 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
To fine dust at the mill filter can lead to to quick bag penetration with fine dust resulting in shortened
bag lifetime and increased pressure drop
Bag wear is not only a function of dust load but also depending on ducting and filter inlet design as
well as air speed at the ilnlet of the filter.
Typically we target 1 m/s above the ball charge or greater. However this is very difficult to achieve.
When determining this value watch out for inleakage around the hood and back drafting through the
discharge airslide. They tend to inflate mill sweep velocity estimates. As a general rule old mills (pre
1980) tend to have small trunnions and are impossible to vent
57 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
above 1 m/s.
Discharge Trunnion
As a rule of thumb, the maximum vent velocity through the discharge trunnion is 23 to 25 m/s. To
achieve higher usually requires such a large pressure drop that most dust collectors and fans are not
designed to make this practical. To estimate the maximum venting volume flow, take the smallest
available cross sectional area; deduct 40% to allow for material in the trunnion; multiply by 25 m/s.
Discharge Hood
Normal maximum dust density to a filter is 200-300 g/m³. This equates to a gas speed at the exit of
the drop-out box of 4-5 m/s. Older mill systems of course may not respect this, however this is the
design value for new mills or for modifications. For higher velocities there is a tendency to entrain too
much dust. This usually leads to a variety of operational and maintenance problems in the ducting and
58 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
A gas speed of 4-5 m/s exit drop-out box and a mill speed of 1.5 m/s generally gives a blaine of the
aspirated dust of ~3000 cm²/g (Beat Stocker).
A gas speed of 2-2.5 m/s exit drop-out box (mill speed 0.5 m/s) gives a blaine of ~4000 (Beat).
Discharge Duct
Typically we find that the discharge vent duct is sized for about 10 to 15 m/s. We surmise that this is
only to prevent settling. If the plant wishes to install a drop out chamber, to create a poor man’s static
separator then design for 1.5 to 2 m/s for normal cement.
These units work just like the two separators in series in one respect and like two separators in parallel
in another. All of the feed that goes to the static separator (generated by mill sweep) is essentially
double-classified. First by the static and then again in the dynamic separator (static rejects go to the
elevator). The second nice thing is that the feed to the dynamic is reduced by the amount of product
pulled off by the static. Thirdly, the fineness of the feed to the dynamic is reduced, this appears to
improve its performance too. Fourthly, if your dynamic is a Sturtevant you will likely find the quality of
the product from the grit is better than your separator fines, Rosin-Rammler speaking.
The trick here is to get as much material as possible to the static. This means maximum mill sweep.
Demopolis gets half of their mill exit material to the grit first, but it takes 1.6 m/s above the balls ( and
a 400 HP fan) to do it.
If you have an H.E.S., the value of adding a static is questionable since the separator is so
efficient already – it won’t know the difference. Quality may suffer too. The static’s generally
produce cement superior to a Sturtevant, similar to a Raymond, and worse than an H.E.S. based
on Rosin-Rammler. In short follows these rules of thumb:
• Sturtevant or Raymond
59 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
• an H.E.S.
• an F.L.S. mill with little trunnions
• other mill sweep limits (D.C.?)
As an alternative consider also a large dropout box (poor man’s static) if you have the room, but not
the money. (Exshaw FM2)
Ventilation Limits
• (BCI) Benchmark fan kW is 15-25% mill kW for sufficient RAW MILL drying. WHAT!! Alesd =
320/5200 = 6%.
Auxilliary Dedusting
60 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Ducting
Bhatpara, ducting at the exit of the 51 Dorol is about 15mm thick. Delivered with spiders inside in
orderto maintain the shape of the parts.
Dedusting ductwork design. 16 m/s for slag and clinker, 18 m/s for the rest.
61 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
Example Stéphane cement course. Elevator dedusting located in wrong position + incorrect hooding à
extraction of large quantity of fines from elevator. Then discharged from auxillary filter onto VRM feed
belt à mill vibrations and mill stop.
Bag Filters
Respected Sir,
I would like to know about Clicker Size ( 0 to 5 mm ) while using Pet coke 100 %
62 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
in kiln
also tell me how much it will come and on what factors it depends means how could we decrease or
increase 0 to 5 mm size Clinker % age
waiting for your Answer
Ali Abidi
Loading...
Reply
DR ANJAN CHATTERJEE
AUGUST 24, 2020 AT 5:54 AM
It is a good compilation. Details of VRM and HPGR are not as much as of Ball mills.
Loading...
Reply
MOUSA HANAYA
JANUARY 27, 2021 AT 9:25 PM
Loading...
Reply
Leave a Reply
63 of 64 2/8/2022, 10:27 AM
Everything you need to know about clinker/cement Grinding - INFINIT... https://webcache.googleusercontent.com/search?q=cache:1JfefWRMndQ...
64 of 64 2/8/2022, 10:27 AM