1) The document provides precautions for installing, operating, and maintaining cooling towers including choosing an installation location away from dust and heat, ensuring proper foundation and fan installation, and inspecting equipment before use.
2) It outlines steps for commissioning the circulating water system and fan system like checking for leaks, monitoring pressure and distribution, and inspecting for vibration and temperatures.
3) Further precautions are given for normal operation like removing debris before use, starting the water pump before the fan, and periodically inspecting and maintaining the equipment.
1) The document provides precautions for installing, operating, and maintaining cooling towers including choosing an installation location away from dust and heat, ensuring proper foundation and fan installation, and inspecting equipment before use.
2) It outlines steps for commissioning the circulating water system and fan system like checking for leaks, monitoring pressure and distribution, and inspecting for vibration and temperatures.
3) Further precautions are given for normal operation like removing debris before use, starting the water pump before the fan, and periodically inspecting and maintaining the equipment.
1) The document provides precautions for installing, operating, and maintaining cooling towers including choosing an installation location away from dust and heat, ensuring proper foundation and fan installation, and inspecting equipment before use.
2) It outlines steps for commissioning the circulating water system and fan system like checking for leaks, monitoring pressure and distribution, and inspecting for vibration and temperatures.
3) Further precautions are given for normal operation like removing debris before use, starting the water pump before the fan, and periodically inspecting and maintaining the equipment.
Note : In order to fully understand the installation, use, operation and
maintenance of cooling towers, it is recommended that you read this manual and the instructions for cooling towers, motors and fans carefully before using them. A.Install the point 1. It should be installed on the top of the pool or on the roof or where the air is flowing smoothly. Otherwise, the performance and service life of the cooling tower will be affected. 2. Avoid installation in places with soot and dust。 3. Keep away from hot places such as kitchen and boiler room. 4. The foundation of the cooling tower shall be horizontal, firm and not inclined, and the center line of the cooling tower shall be perpendicular to the horizontal plane, otherwise the operation of the motor will be affected. 5. The cooling tower fan is located on the reducer, and the fan must be firmly fixed on the reducer. After fastening at any time during installation, rotate the fan by hand. The fan shall rotate flexibly without jamming, otherwise it cannot be started for trial operation. The fan blade shall be adjusted and balanced, and the angle difference is not allowed to be too large. If any problem is found, it shall be solved in time. B.Precautions for equipment pre use inspection and startup operation Note: As FRP and cooling tower packing are combustible goods, special attention should be paid to fire prevention in the process of use and maintenance, so as not to ignite the cooling tower and cause losses to you. 1. Preparation before operation of cooling tower 1.1 Clean the site to ensure that there are no sundries in and on the tower. 1.2 Recheck whether the installation position of each component meets the installation requirements, whether each fastener is loose, and all pull rods shall be tightened with adjustment allowance. 1.3 Check the insulation resistance of the motor to avoid burning the motor during operation. 1.4 Before the operation of the cooling tower, the sundries in the pipeline must be cleaned to avoid blocking the nozzle, resulting in the wall clearance controlled between 20-45mm. People are not allowed to walk on the blades. The cover plate of the distribution tank and each access door shall be opened flexibly. 1.5 When the cooling tower fan is driven by belt, check whether the bearing has been greased, whether the V-belt tightness is appropriate, whether the belt pulley is horizontal and whether the belt model is consistent, so as to prevent the belt from loosening and slipping and ensure the smooth operation of the fan. 1.6 When the cooling tower fan adopts gearbox, check whether the oil circuit is unblocked, whether the oil pipe is kept on the same plane and whether the oil level is at the specified position. The allowable deviation of motor output shaft and gear input axial shaft is 0.1mm, the allowable deviation of coupling parallel is 0.1-0.5mm, and the longitudinal and transverse direction and horizontal error of adjusting seat shall not be greater than 0.12/1000 (see the fan manufacturer's Manual for detailed data). 1.7 Check whether the stop fuse at the output end of the fan is installed correctly. Note:The above conditions shall be comprehensively inspected and handled as required. They can be put into operation only after there are no problems. 2. Commissioning of circulating water system 2.1 Gradually open the water inlet header valve and adjust the water volume to the rated value through the valve. 2.2 When the rotating water distributor is used for water distribution in the cooling tower, the rotation of the water distributor shall be observed. The water distributor shall operate stably and distribute water evenly. In case of any abnormality, it shall be eliminated according to the provisions of common faults and troubleshooting. Add molybdenum disulfide grease to the bearing and oil seal of the water distributor every 1-2 months. 2.3 The inlet pipe pressure of circular cooling tower is required to have 3.5m-5.0m water column at the inlet, and the inlet pipe pressure of square cooling tower is required to have 6.5m-8.0m water column at the inlet. The pressure should not be too high, otherwise the water floating phenomenon of the cooling tower is serious. 2.4 The cooling tower adopts pipeline water distribution. Check whether the water distribution is uniform. If there is any abnormality, eliminate it according to the provisions of common faults and troubleshooting. 2.5 Observe the ponding height of the sump, adjust the position of the make-up water float ball and the height of the overflow pipe, and control the ponding depth within the design range. 2.6 The water outlet of the cooling tower shall be unblocked, and the grid shall be set at the water outlet. 2.7 Check whether the cooling tower body leaks. If there is any leakage, it shall be sealed in time. Note:After the above items operate normally, close the header valve for the next step. 3. Commissioning of fan system 3.1 Clean up the site 3.2 Recheck whether the installation position of each component meets the installation requirements and whether the connectors of each fastener are loose. 3.3 When the fan adopts gearbox, recheck whether the oil circuit is unblocked and whether the oil level is at the specified position. When using belt transmission, recheck whether the belt tightness is appropriate and whether the bearing seat in the transmission device has been filled with grease. 3.4 Check whether the blade installation angle is correct and consistent, and whether the horizontal position error of each blade is within the allowable tolerance. Whether the impeller, blade and counterweight are installed according to the corresponding number. 3.5 Check whether the impeller and blade are firmly installed, whether the bolts are firm, whether the shaft end brake fuse is reliably installed, and whether the shaft end pressing plate is firmly connected. 3.6 Check whether the insulation resistance of the motor meets the standard, whether the cable is firmly laid and fixed, and whether the wiring is good. 3.7 Rotate the fan impeller by hand, and the fan shall operate smoothly and evenly. 3.8 Start the motor and check the rotation direction of the blades. 3.9 Run continuously for 1 hour, measure and record the current value and voltage value of the motor. Check whether the gearbox and motor have abnormal sound, abnormal heating and other abnormal phenomena. 3.10 When the fan is driven by belt, check whether the belt pulley operates stably and whether the belt slips. 3.11 Observe the vibration of the tower. 3.12 If the above 3.9 is abnormal, shut down the fan and adjust the blade installation angle until it meets the requirements. 3.13 After 4 hours of continuous operation (1)Recheck whether the position of each component is loose (2)Check whether all connectors and fasteners are loose (3)Check whether each sealing part leaks oil ( 4 ) Check whether the oil temperature of motor, bearing pedestal and gearbox meets the requirements. See the fan manufacturer's Manual for specific data of gearbox oil temperature. After the above steps are normal, enter the following operation. 4.Water steam combined commissioning steps 4.1 Start the fan first. After the fan operates normally, open the water inlet valve and gradually increase the water volume to the rated design value. Check whether the water outlet of each water inlet pipe is uniform, and whether the water inlet and ponding of the diverter are in order to prevent short circuit of the air chamber. 4.2 Continue to detect fan vibration, power consumption, oil temperature and oil level. 4.3 Continue to check the water distribution and splash of the air inlet window. 4.4 Check the service effect of the water collector, and the floating water loss at the air outlet shall be controlled below 0.01% of the total circulating water volume. 4.5 After continuous operation for 72 hours, stop again and conduct comprehensive inspection on the tower and fan. After confirming that there is no abnormality, it can enter normal operation. Generally, 10-15 days after the first operation of the fresh air fan, clean the gearbox and replace with new oil (see the fan manufacturer's Manual for specific operation). After the cooling tower is put into normal operation, in order to ensure that it is always in the best working state and can work effectively for a long time, it is necessary to carefully read the precautions for the use of the cooling tower, pay attention to various testing work, strictly implement the patrol inspection system and carefully make records. C.Precautions for putting into use 1. Before the use of the cooling tower, carefully remove the sundries and dirt on the pipes, water collectors, filler surfaces and sump to avoid blockage. 2. When starting the cooling tower, the water pump must be started first and then the fan. It is not allowed to operate the fan without water spraying, otherwise the filler or water collector will be taken away by the wind; Check whether the wind direction is upward. 3. The cooling tower shall be commissioned before use. Check whether the fan is installed stably and whether all screws are tight. Whether the water distribution of the nozzle is uniform, whether the moisture-proof measures of the motor are tight, etc. The connector between the motor lead and the power line must be waterproof to prevent damage to the motor and loss to you. Check whether the power supply and motor voltage are consistent. 4. The fan of the cooling tower has high balance requirements. Please pay attention to protection during use, and do not deform the blade, so as not to cause unbalanced operation of the fan and damage the motor and reducer of the cooling tower. When the cooling tower works normally, the fan shall rotate clockwise (looking down) and the wind moves from bottom to top, otherwise the motor lead shall be replaced or necessary inspection shall be made. 5. When the cooling tower is used, it shall be observed frequently to check whether the fan rotates clockwise (looking down); The current shall be equal to or less than about 85% of the rated current, and the current shall not be too large, otherwise the motor will be damaged; Check the voltage, fan vibration, noise, gear oil level, oil leakage or normal water distribution, etc. 6. Before starting the reducer, check whether the oil level reaches the center line of the oil scale. During normal operation, the oil level of the oil gauge shall be checked frequently. It is recommended to use No. 22 ~ 28 hyperbolic gear oil or no. 90 ~ 120 industrial gear oil as lubricating oil, and use oil with high viscosity in summer. In addition to continuously filling to the specified oil level at ordinary times, it shall be replaced once at the beginning of continuous operation for 10 ~ 15 days, and once at the second operation for 6 months. After that, it shall be replaced at least once every year of continuous operation. In case of deterioration of oil quality, it shall be replaced in time. 7. Turbine maintenance 7.1 Monthly inspection (routine appearance): when the water turbine is in normal operation, the appearance inspection shall be carried out every month or 1000 hours of continuous operation. Mechanical damage Water and oil leakage Whether the operating speed is normal 7.2 Annual inspection (routine appearance): According to the requirements of monthly inspection Inject grease into the upper and lower oil holes (high temperature bearing grease, lithium base 5#) Surface coating paint maintenance 7.3 Replacement cycle of wearing parts The water seal and bearing need to be replaced every 20000 hours of operation The oil seal needs to be replaced every 40000 hours of operation 8. Precautions for use of rotary atomizer: The wear degree shall be checked frequently during normal operation; High temperature bearing grease, lithium base 5#, is recommended for lubricating oil. In addition to continuously filling to the specified oil level at ordinary times, it shall be filled once at the beginning of continuous operation for 10 ~ 15 days. After that, it shall be filled at least once every 6 months of continuous operation. In case of deterioration of oil quality, it shall be replaced with new oil in time. When the cooling tower is shut down for a long time, grease (high temperature bearing grease, lithium base 5#) must be added from the oil hole. When running again, after continuous operation for 2 hours, shut down and add lubricating grease again. 9. After the cooling tower operates for a period of time, pay attention to check the fastening of connecting parts and bolts, especially whether the nuts of fan and motor are loose. If they are loose, they shall be handled in time. 10. The pressure of water inlet pipe of circular cooling tower is required to have a lift of 3.5m ~ 5.0m at the water inlet; The inlet pipe pressure of square cooling tower requires a head of 6.5m ~ 8.0m at the inlet. The pressure should not be too high, otherwise the water floating phenomenon of the cooling tower is serious. 11. During the use of the cooling tower, the water quality management shall be strengthened. The turbidity of the circulating water shall not be greater than 20 mg / L and 50 mg / L in the short term. At the same time, the circulating water shall not contain errors and mechanical impurities. During operation, regular sewage discharge or adding water quality stabilizer shall be considered according to the water quality. When bacteria and algae are produced in circulating water, water quality algicide can be added to remove them. 12. Under the freezing point temperature in winter, the tower is prone to icing. Pay attention to the icing problems such as air inlet window, and take corresponding measures to help melt the ice. 13. When the cooling tower stops working, stop the fan first and then the water pump. 14. Performance of cooling tower: affected by cooling water volume, inlet and outlet water temperature and meteorological parameters, pay attention to the flow of cooling water and water temperature difference parameters regularly and make records. 15. As an important cooling equipment, the cooling tower shall be managed by a specially assigned person during operation, the working conditions shall be observed frequently, and any abnormal conditions shall be eliminated in time. D.Precautions for daily maintenance of motor 1. Frequent starting of the motor will cause overheating and will not win more than 6 times per hour. 2. When using two speed motor, there shall be a 15 second delay when running from high speed to low speed. 3. The operating environment shall be kept dry, the motor surface shall be kept clean, and the air inlet shall not be obstructed by dust, fiber, etc. 4. When the thermal protection and short-circuit protection of the motor act continuously, find out whether the fault is from the motor or overload or the setting value of the protection device is too low. It can be put into operation only after the fault is eliminated. 5. Good lubrication of the motor during operation shall be ensured. Generally, the motor operates for about 5000h, that is, the lubricating grease shall be supplemented or replaced (it is not necessary to replace the lubricating grease within the service life of the closed bearing). After overheating or deterioration of the bearing is found during operation, the lubricating grease shall be replaced in time. 6. When the service life of the bearing ends, the vibration and noise of the motor will increase significantly. Check that the radial clearance of the bearing reaches the following values, that is, the bearing shall be replaced.
Bearing inner 20——30 35——50 55——80 85——120
diameter(mm) Ultimate wear 0.10 0.15 0.20 0.30 clearance(mm) E. Cooling tower cleaning Because most of the cooling water contains calcium, magnesium ions and acid carbonate, carbonate will be formed when the cooling water flows through the metal surface. In addition, oxygen dissolved in cooling water will also cause metal corrosion and rust. Secondly, due to the generation of scale and the growth of algae, the heat transfer effect of cooling tower packing decreases. The packing is seriously blocked, which directly makes the heat exchange effect ineffective. The data show that scale deposits have a great impact on the loss of heat transfer. With the increase of sediment, the maintenance cost will increase in the later stage. Even if a thin layer of scale is generated, a lot of human and material resources will be invested in maintenance. Therefore, keeping the cooling channel free of mineral deposits can improve the efficiency and save the cost. Prolong the service life of the equipment and save production time and cost at the same time. For a long time, traditional cleaning methods such as mechanical method (scraping and brushing), high-pressure water and chemical cleaning (pickling) have many problems in equipment cleaning: scale and other sediments cannot be completely removed, acid solution causes corrosion to the equipment, forming loopholes, residual acid causes secondary corrosion or under scale corrosion to the materials, and finally leads to equipment replacement. In addition, the cleaning waste liquid is toxic, A lot of money is needed for wastewater treatment. In view of the above situation, efforts have been made at home and abroad to develop cleaning agents with low corrosivity to metals, and the successfully developed youshitaike cleaning agent. It has the characteristics of high efficiency, environmental protection, safety and no corrosion. It not only has good cleaning effect, but also has no corrosion to the equipment, which can ensure the long-term use of the cooling tower. When bacteria and algae are produced in circulating water, water quality sterilizer can be added to remove them. Circulating water quality requirements (with water quality limit) Project Make up water Circulating water PH(25℃) 6-8 6-8 Conductivity(uv/CM) Below 200 Below500 Total hardness(CaCO3)p p m Below50 Below200 M alkalinity(CaCO3)p p m Below50 Below100 Chloride ion(CL)p p m Below50 Below200 Sulfate ion(SO4)p p m Below50 Below200 Iron(Fe)p p m Below0.3 Below10