Prepared by :-
.
DESIGN BRIEF
MECHANICAL SERVICES
1.0 OBJECTIVES
The proposed Mechanical building services is for the whole complex which
consists of the following building
The Mechanical building services will be designed for this complex with
an approached to implement cost efficiency for capital cost, operating cost,
operational flexibility and maintainability.
APPENDIX 'A'
MECHANICAL SERVICES
2.0 The scope of work covered under the mechanical services consists of the
followings: -
2.1 The following scope of services will be included for specific building
which require such system installation.
And other authorities having jurisdiction over the mechanical installation in the locality.
3.1 GENERAL
3.1.2 The following Fire Protection System as required by Uniform Building By-
Law and Jabatan Bomba Dan Penyelamat Malaysia will be installed for this
development.
TYPE LOCATION
ABC DRY POWDER CO² Escape staircase, lobbies, corridor,
electrical rooms, and generator room.
The proposed hose reel system serving the buildings consists of: -
Ventilation will be provided for toilets and other specific rooms by the used of
extractor fans.
Cold water from the external reticulation shall be fed directly to storage tanks.
The water will be distributed to the sanitary fittings. The system shall be design
to meet the requirement of JBA and other regulating authorities.
2. It will handle all the visitor traffic during peak hours as well as the staff movement
within the building. It shall also handle equipment.
3. These lifts proposed will be classified as passengers and / or goods lift. The
proposed design shall comply with the most recent edition of the Factories
and Machinery (electric passengers and goods lifts) Regulations 1970
published under Factories and Machinery Act 1967 by the Department of
Occupational, Safety & Health, Malaysia.
4. These lifts proposed shall meet the minimum requirements of the British
Standard Specification for Electric Lifts BS EN 81-20:2U14, BS EN 81-
3:2000 and BS EN 81-50:2014
6. The proposed works to be carried out will include but not limited to the
following:-
(c) Servicing and maintaining the above works and equipment for a period stated in the
conditions of contract.
(d) Submission to relevant local authority for approval and PMA (including during
DLP) will be done as per reuirements/
1) The proposed design will consist of design, supply, deliver, install, test and
commission to successful operating condition of the complete kitchen equipment
and kitchen exhaust hood system.
2) The proposed system includes wet chemical fire suppression system installed to
the kitchen hood.
3) The proposed system includes installation of gas piping and storage cylinders
complete with all necessary fittings.
4) The proposed system includes installation of hot and cold water supply, taps,
sinks, working tables and other appliances.
5) Servicing & maintaining the above works & equipment for a period of as specified
in the contract from the date of its handing over will be provided.
1) The proposed installation shall cater for gas fire equipment in kitchen.
3) The gas supply proposed shall preferably be from manifold system with standard
size gas cylinders.
5) The design, installation, testing and commissioning of the LPG system shall
comply with the requirements of the Suruhanjaya Tenaga and the Jabatan
Keselamatan dan Kesihatan Pekerja.
The proposed Fume / dust extraction system shall consist but shall not be limited to the
followings: -
a) Centrifugal Fan
b) Spiral Ducting
3. Testing and commissioning of the above system will be done to ensure the system
is fully functional.
4. Servicing and maintaining the above works and equipment for a period stated in
the conditions of contract shall be provided as well.
5. Submission to relevant local authority for approval and PMA (including during
DLP) will be done as per requirements.
The proposed system includes supply and installation of a BACS complete with the
following:-
1. Computers c/w CPU of the latest model and speed, original software inc. anti-virus
software, hard disk with latest maximum memory and RAM, CD ROM Drive, 17"
SVGA graphic color monitors, standard keyboard and mouse, alarm / report
printers, standalone controller unit, direct digital controllers, flow meter, power
meters, switches, transducers, sensors, transmitters, high level interface with main
fire alarm panels, air conditioning switchboard, compressors and
AHU/FCU, booster pump sets, firefighting & protection system, lift system,
chiller microcomputer control panel, relays, cabling installation, etc.
2. Essential power supply for all system power points requirements (computers, printers,
direct digital controllers, master/slave etc). Uninterruptible Power Supply (UPS) for
computers and printers shall be provided for at least 30 minutes.
AD ASSOCIATES SDN. BHD.
Page 9 of 18
DESIGN BRIEF
3. The system proposed will have at least 72 hours of memory protection for the database
and real time clock during both normal & essential power failure.
2) User Training
The following standards of practice and authorities requirements shall form part
of the design and installation guides:-
STANDARDS
a) Air-conditioning ASHRAE
b) Mechanical Ventilation ASHRAE & UBBL
c) Fire Alarm System BS5839 Part 1 & Jabatan Bomba
d) Hosereel BS5306 Part 1 & Jabatan Bomba
e) Fixed CO2 System NFPA12 & Jabatan Bomba
f) Lift BS2655 Part 1 & JKKP
g) Internal Sanitary MBAS
h) Cold Water Plumbing Jabatan Bekalan Air
The design of the mechanical services shall follow the criteria indicated below:
e) The rest of the basic mechanical services shall follow the respective
relevant standards of practice.
MATERIALS
a) Air Conditioning parameter
ii) Main duct & branch duct GI sheet metal with fibreglass
insulation of 1 inch 2 Ib for last
floor and 1 inch 1 Ib for the rest
below with isolated aluminium foil
covering.