Professional Documents
Culture Documents
Manual de Instalador Safeaccess
Manual de Instalador Safeaccess
Manual de Instalador Safeaccess
SafeAccess and
NAV7 trolley for
Rope access
DOC074-UK-17.04.27
DOC074-UK-17.04.27
Table of content
1. Description ...................................................................................................................................................................................................... 3
2. Declaration of conformity........................................................................................................................................................................... 3
3. Strength of the fixing ................................................................................................................................................................................... 4
4. Installing SafeAcces ..................................................................................................................................................................................... 4
5. Initial checks ................................................................................................................................................................................................... 4
6. Using the SafeAccess rail ..........................................................................................................................................................................5
7. Prohibited use ................................................................................................................................................................................................ 7
8. Caution .............................................................................................................................................................................................................. 7
9. Life span of the installation........................................................................................................................................................................ 8
10. Marking ............................................................................................................................................................................................................. 8
11. Maintenance and inspection .................................................................................................................................................................... 8
12. Identification sheet .......................................................................................................................................................................................9
2
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
1. Description
The SafeAccess anchoring device is permanently installed on a building or other structure which
needs to be maintained by rope access.
The SafeAccess consists of an aluminium rail fixed with brackets to the structure of the building.
One to 4 users are connected to the rail by means of a NAV 7 trolley, one user per trolley. The trolleys roll
along the rail.
2. Declaration of conformity
Fallprotec certifies that the rigid anchor device SafeAccess has been tested and approved according to
the EN795 type D 2012 standard.
The rail is designed to be used by 4 persons working simultaneously on the system by means of the NAV
7 trolley. (Maximum 2 users between 2 brackets.)
Users must be certified rope access technicians. At least one technician must be IRATA2 trained or
equivalent, in order to execute a rescue operation if needed.
3
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
KN KN
SafeAccess Rail 9 >25
Fixation 9 >22
Trolley Nav7 6 25
4. Installing SafeAcces
The SafeAccess rail is installed on the ceiling or onto the façade. The rail is installed horizontally. Distance
between the façade and the rail must be determined according to the building characteristics and project
specifications. The maximal distance between two fixings is 4 meters. The maximal distance between the
junction and the fixing is 500 mm.
5. Initial checks
The following checks are mandatory before using the SafeAccess.
o The user must be in good physical condition, and not be susceptible to vertigo.
o The user must have a rope access certificate issued by a competent organism.
o A minimum of two people is required to work together on the rail under visual contact between
each other, so that each one can assist the other in the event of an incident.
o A rescue plan must be in place to evacuate the person within 15 minutes in case of having an
unconscious worker in order to avoid “suspension trauma”. The rescue material must be easily
accessible and be located in the vicinity from the System.
o No more than 2 people may be connected between two fixings at the same time.
o Each user must be equipped with all necessary elements according to the rope access techniques.
o On arrival in the work area, or whenever the user attaches to the rail, he is required to check:
4
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
If needed, trolley may be temporarily installed on the rail, so that users can introduce it every time they will
use the system, by using tilting end stops. While doing this operation (as well as ropes rigging) user must
be well secured onto an appropriate anchor point.
5
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
o Primary and secondary ropes must be directly connected to the anchor eye of the NAV7 trolley see
picture below.
Secondary
Rope
6
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
7. Prohibited use
ø Only one user working at height, but without the support of a second person able to provide
assistance if needed.
ø More than 4 persons attached to the rail simultaneously.
ø More than 2 persons attached to the rail between 2 brackets
ø Deposits of ice on the rail
ø Temperatures lower than -20 °C
ø If lightning or any other potentially dangerous exceptional climatic conditions.
ø It is strictly prohibited to use the system outside the limits specified in this document or
outside any other situation for which it is designed.
ø It is forbidden to use the Safeaccess Rail as grounding of welding machine.
8. Caution
• If the equipment is sold outside the country of origin, the dealer will provide the user
instructions, the maintenance instructions for periodic examinations as well as the instructions
for repair in the language of the region where the SafeAccess is used.
• The location where the End of the rail SafeAccess is installed must be chosen so that the user
does not risk a fall when he engages the trolley.
• One single person attaches to the NAV7 trolley at the same time. ONLY: In case of a rescue
operation, rescuer and victim could be attached to the same trolley.
• The markings are on the NAV7 trolleys; the markings must be legible anytime.
7
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
10. Marking
The NAV 7 trolley is marked as follow:
FALLPROTEC
The type of trolley: NAV 7
Serial number and the two last digit of the year of manufacturing
Standard number: EN795 Type D
An icon to read the manual before using the SafeAccess.
The SafeAccess rail must be inspected by a qualified person at least once a year, as well as after every
fall. The safety of the users depends on the maintenance the equipment.
A competent person will check the legibility of the trolleys engravings.
Any modification of or addition to the equipment can only be carried out after the prior written
agreement of FALLPROTEC.
8
User Manual
SafeAccess and NAV 7 trolley for Rope access
DOC074-UK-17.04.27
Manufacturer: FALLPROTEC SA
43-45, ZA Op Zaemer
L- 4959 Bascharage
G-D de Luxembourg
: + 352 26 55 09 30
: + 352 26 55 09 30 55
E-mail : marketing@fallprotec.com
The manufacturing date is marked on the trolley, 4 digits quarter/year (i.e. Q1/17)
Date of purchase:
Expected life: 10 years for the trolley, 20 years for the rail with 200 hours of use per year.
Date of 1st Type of check & repair Name of the Visa Date of the
check person next check
After one year Visual inspection of the rail and the Periodicity:
in use trolleys. Once a
Cleaning the trolleys and the rail. year
The wheels must turn freely.
NOTE: It is the responsibility of the user to provide all required details as per table above