STRIP PLAN
53.50m CC Pavement
As per sanctioned estimate
30.0m CC
0/000
1/000
2/000
3/000
4/000
5/000
6/000
53.50m CC Pavement
As per Execution
30.0m CC
0/000
1/000
2/000
3/000
4/000
5/000
6/000
5/5-600
2/4-8
3/4-8
1/10
0/2
0/4
2/2
5/4
Asst.Exe.Engineer, Dy.Exe.Engineer, 20 MM MSS Existing CC
R&B section, Gorantla R&B Sub division, Dharmavaram
50 MM BM GSB
STRIP PLAN
445.0m CC pavement
As per sanctioned estimate
44.60m CC
43.0m CC
10/000
11/000
12/000
6/000
7/000
8/000
9/000
445.0m CC pavement
7/0-8/0 BM - 400.0m 11/0 -60BM - 300.0m
As per Execution
44.60m CC
43.0m CC
10/000
11/000
12/000
6/000
7/000
8/000
9/000
7/0-6 WMM - 10.0 & 10.0m
for approches
STRIP PLAN
270.0m CC
180.0m CC
12/800
13/000
14/000
15/000
16/000
17/000
17/800
12/0-4 BM -300.0m WMM - 5.0m 14/2 -15/0 BM - 400.0m 17/2-8 WMM- 500.0m
BM- 500.0m
As per Execution
123.0m CC
231.0m CC
142.0m CC
34.0m CC
12/000
13/000
14/000
15/000
16/000
17/000
17/800
12/200-300 BM - 100.0m GSB - 10.0m 13/500-510 WMM -10.0m 14/950-15/050 BM - 100.0m 16/5-759 BM - 259.0m 17/100 -300 gap
12/450-550 BM - 100.0m WMM - 10.0m & 20.0m 14/550-650 BM - 100.0m approches 10.0 & 25.0m
STRIP PLAN
400.0m CC Pavement
19.0m Causeway
18.6m Causeway
20.0m Causeway
As per sanctioned estimate
12/000
13/000
14/000
15/000
16/000
17/000
18/000
19/000
20/000
400.0m CC Pavement
12/0 to 13/0 13/0 to 20/0 BM - 2000.0m
19.0m Causeway
18.6m Causeway
20.0m Causeway
As per Execution
12/000
13/000
14/000
15/000
16/000
17/000
18/000
19/000
20/000
13/8
14/2
15/2
CC - 135.0m