Project Risk Index For Hira: Severity Level Probablity
Project Risk Index For Hira: Severity Level Probablity
The existence
Slight health effect /injury / little of
Heard in offices legislation/regu
2 damage to property (Can be 2 Once in month 2 2 NO 1 No Significance
outside lations has no
recovered in 2 days.)
influence on
significance
Incident happened in
Minor health (illness) effect / injury
our organization /
3 (Keeps person away from work 2-3 3 Once in a week 3 3
company 2-3 times in
days.)
a year.
Happened in our
Major health effect /illness / injury
organization /
4 (fractures, breaking of organs, injury 4 Once/twice a day 4 4
company 5-6 times in
to body parts).
a year
Happened several
Fatal\Permanent loss of
5 5 Continuous 5 times in a year in our 5
organs\functions (eyes, legs, hands.)
sites/offices
Risk Evaluation
LOW: MODERATE: HIGH:
IMPACT RISK UPTO 30 IMPACT RISK 31 TO 60 IMPACT RISK 61 & ABOVE
Project HIRA
MARHOWRAH
Origninated on 10-03-2020
Project Name: GE - Diesel Locomotive Project Marhowra, Bihar
HIRA-10 Review Date:
Prepared by Reviewed by: Approved by: Audit Comments
Name Chandan Mishra(VGS)
Execution in charge and
Signature Mr. Navneet Naval(CBRE)
Project-in-charge
Date 10-03-2020
EXPOSOURE EXISTING
SEVERITY PROBABLITY LEGISLATION IMPACT RISK ACTION MEASURE FOR RISK CONTROL
SR NO. ACTIVITY HAZARDS ASSOCIATED RISK FREQUENCY CONTROL IN RISK LEVEL
S P L
E (SxExPxL) PLACE
Screening, Trade test, Medical check-up, HSE-induction, Tool
box talk, Describe job hazard, Basic required(safety helmet,
safety shoes and reflective jacket) and job specific PPEs(Cotton
hand gloves, safety goggles) provided.
Illness Close supervision.
Untrained worker Refer below documents
General activities Injury 3 1 3 1 9 No Low
mobilization 1. EHS002-Screening of Worker(frequency.-once)
Property Damage
1 2. EHS003-PeP n Tool Box Talk(frequency-daily)
3. EHS004-Induction Training Attendance(frequency-once)