Professional Documents
Culture Documents
Peusangan 1 & 2 Hepp Construction Project: P.T. PLN (Persero)
Peusangan 1 & 2 Hepp Construction Project: P.T. PLN (Persero)
NAME : DATE :
DESIGNATION : SIGNATURE :
LOCATION WEATHER
OF WORK : CONDITION : Fine / Cloudy / Rain
TYPE OF SHIFT : Day / Night
WORK :
GENERAL REPORT
A. ACTIVITY
Working Hour's Total
No Activity
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6 Hour
1 Preparation
2 Common Excavation
3 Fill Embankment
4 Dewatering
5 Cleaning
6 Reinforcement Bar
7 Install / Removal Form Work
8 Concreting
Rest
Rest
9 Curing
10 Gabion Work's
11 Gravel Bedding
Time
Time
12 Dispose Random Material
13
14
15
16
17
18
1 Excavator 1 Engineer 1
2 Concrete Pump 2 General Supervisor 2
3 Truck Mixer 3 Supervisor 3
4 Dump Truck 4 Surveyor 4
5 Generator 5 Assistant Surveyor 5
6 Water Pump 6 Operator and Asst. 6
7 Submersible Pump 7 Driver 7
8 Compressor 8 Safety Officer 8
9 Hand Vibrator 9 Foreman 9
10 Stamper 10 Skilled Labour 10
11 Hand Drill 11 Unskilled Labour 11
12 Cutting Wheel 12 Helper 12
13 Manual Mini Mixer 13 M&E 13
14 14 14
E. REMARK
Note :
Comment on Safety :
Comment on Environment :
CONTRACTOR CONSULTANT
( ) ( )