Petroconst S.A.

I.C. Bratianu BLVD, no. 45, Constanta, Romania


Phone: +40 241 618 771; Fax: +40 241 618 694
Web: www.petroconst.ro, E-mail: office@petroconst.ro
GENERAL PRESENTATION OF “PETROCONST” SA
CONSTANTA COMP.
1. FIELD OF ACTIVITY

BACKGROUND
PETROCONST S.A. – a joint stock company – has been established since 1960 being a major
company with a large experience in the wide sphere of oil industry and performing both on-shore, and
off-shore construction-assembly works.

COMPANY NAME: PETROCONST S.A. Petroconst S.A. Head offices


ADDRESS, PHONE, FAX, AND E-MAIL: 45 I.C. BRATIANU STR., CONSTANTA, ZIP CODE
900263, ROMANIA
TEL. NO.: 0040 241 618771
FAX NO.: 0040 241 618694
E-MAIL: office@petroconst.ro
CONTACT PERSON : Eng. ADRIAN ROȘCULEȚ – GENERAL MANAGER

2. COMPANY PROFILE
COMPANY PROFILE:
Onshore & Offshore Construction-assembly works within the Oil & Gas Industry.

SCOPE OF WORK:
Our company has the required capability, experience and endowment in order to provide high quality
and competitive works and services, such as:
 Installation of pipelines, tools and equipment for Refinery and Petrochemistry (capacity of weld
performance – 1000 inch / working day).
 Assembly construction works within oil industry for distribution systems of the oil products – crude
oil, natural gas, water injection deposits, etc.
Mild hydrocracking plant
 The erection of steel and HDPE pipelines (with operating
pressures from 6 to 350 bar) both underground, and
above-ground for the distribution of various oil
products.

Offshore oil activity on the continental plateau of the


Black Sea has been developed since 1976, our
company being the sole Romanian constructor
specialized in offshore assembly works, that is:

Side booms for pipelines

 Laying out on site of the steel structures which are integral parts of
the crude oil and natural gas production platforms, such as: Jacket
type structures, bridges, tie-in platforms, duty cranes, dwelling and
electric blocks.
 Completion of the offshore drilling platforms for commencement of
the development of crude oil and natural gas production reservoirs
by using oil separators, water treatment plants, water pumping
stations for water injection into deposits, gas compressing stations,
social units.
 Onshore putting-into-readiness and offshore installing of the
undersea main pipelines with 4” – 16” in diameter.
 Preparation and manufacturing in pipeline spool workshop for
crude oil and gas, air, water, foam technological spools, steel
ladders, bridges, hand rails, protective shields, hall steel structures,
steel structures for flare support. Offshore Central Platform

Furthermore, besides the works above mentioned we also have in our scope of work the execution
of construction-assembly works for automation and electric plants, works have been carried out
for some of the largest companies in Romania: Petrom OMV, Transgaz, Rompetrol, etc.
 Overground and underground cable routes
 Cable layout
 Execution of process tie-ins for instrumentation with
stainless steel isometrics and/or Ol, with couplings by
ermetto fittings and/argon welding• Installation of
complex automation systems assisted by high
performance process computers with software able to
ensure the following: Installation of field
instrumentation and/or control panels, junction boxes
in normal and/or explosion dangerous environments
 Installation of panels, automation boards,
Automation framework for Nod Poishor electric generator programmable automatic devices, etc.
set

 Installation of electrical heating facilities in normal and explosion dangerous environments, to


instrumentation isometrics, technological pipelines,
technological vessels
 Installation of fire, smoke, and gas detection systems
 Testing and commissioning of low and medium voltage
electrical facilities
 Aerial low and medium electric voltage lines
 Underground lines of low and medium voltage
 Lighting networks
 Aerial and/or underground derivations of 0.4kv

Transmitter’s room

 Aerial and underground networks for the electrical power


distribution in normal and explosion dangerous environments
 Indoor and outdoor power plants in normal and explosion
dangerous environments
 Weak current electric facilities
 Passive and/or active cathodic protection facilities to
overground and underground steel constructions
 Earthing and lightning installations
 Testing and commissioning
 All electrical and automation installations to the offshore
platforms from the continental plateau of the Black Sea -
PFCP;PFS3;PFS6;PFS7 ; PFSU

Control room
 Fitting
out with electrical and automation installations
of gas regulation and measurement stations
along the territory of Romania within the
distribution systems of TRANSGAZ
 Fitting out with electrical and automation
installations of potable water pumping
stations
 Fitting out with electrical and automation installations of thermal heating plants, etc
Construction works for the development of crude oil and natural gas fields from the continental
plateau of the Black Sea. Metallic manufactures, concrete and metallic strength structures, thermal
insulations.
GMS Constanta
Over the last 25 years have been mounted approx. 400 Km of submarine pipes
(6”-20”) at a depth of 60 m under the sea level (crude oil, natural gas, and flooding water). Have been
executed central platforms of crude oil and natural gas development on the Black Sea.
 Pipeline insulations both for onshore, and offshore types of work.
 Cathodic protections for pipelines.
 Construction of storage tanks with capacities of 50 c.m. –
100,000 c.m.
 Construction of natural gas transmission lines (trunk
lines), with diameters between Φ 168 mm şi Φ 1,200
mm.
 Construction of crude oil transmission lines (trunk lines),
with diameters
Heat exchange skid
between Φ 168 mm şi
Φ 1,000 mm.
 Electrical and automation installations.
 Pumping stations and waste water treatment stations, treatment plants for oil and natural gas cleaning,
oil terminals, gas measuring stations, etc.
 Construction works within the fields of: hydro-urban public works, hydrotechnical works, land
reclamation works.
 Construction of protection embankments.
 Protection of river banks for the undercrossing with
oil and gas pipeline of channels and rivers.
 Protection of shores for the installation of the
undersea pipelines.
 Recovery of hydrotechnical works damaged by
water floods.
 For the above mentioned type of works our
company has the ability to provide our clients with
complete projects on turn-key basis.
50 000 c.m. tank – Oil Terminal

3. CERTIFICATIONS
For all fields of activities our company secured the necessary permits, licenses and certificates, a
highly qualified personnel (approx. 360 employees), and owns the suitable and competitive endowment
for the successful completion of works.
Crt
. Issuing Authority Type of authorization No. of authorization
No.
1 RINA SIMTEX Certification ISO 9001:2015 41594/21/R
2 RINA SIMTEX Certification ISO 14001:2015 EMS-8702/R
3 RINA SIMTEX Certification ISO 45001:2018 OHS-4415
4 TUV AUSTRIA Certification EN ISO 3834-2 HZ-2194-21-RO-FUL
5 TUV AUSTRIA Certification EN 1090-1 0408-CPR-TA01309
6 ISC Laboratory gr. II- NDE Laboratory 3074
Authorization intended for the engineering
of upstream supply pipelines and surface
7 ANRE 16661
technological plant related to natural gas
storage, PPI type
Authorization intended for the engineering
of natural gas transport and distribution
8 ANRE systems, closed distribution systems, as 16662
well as natural gas installations of use
operating under high pressure, PT type
Authorization intended for the execution of
natural gas transport and distribution
9 ANRE systems, closed distribution systems, as 16678
well as natural gas installations of use
operating under high pressure, ET type
Authorization intended for the execution of
upstream supply pipelines and surface
10 ANRE 16677
technological plant related to natural gas
storage, EPI type
Authorization intended for the engineering
of natural gas installations of use having
11 ANRE 17192
the regime of medium, reduced and low
pressure, PDIB type
Authorization intended for the execution of
natural gas distribution systems, closed
distribution systems operating under
12 ANRE medium, reduced and low pressure, as well 17193
as installations related to the activity of
producing/storage of biogas/biomethane,
EDSB type
Authorization intended for the execution of
natural gas installations of use having the
13 ANRE 17194
regime of medium, reduced and low
pressure, EDIB type
Authorization intended for the engineering
of natural gas distribution systems, closed
distribution systems operating under
14 ANRE medium, reduced and low pressure, as well 17266
as installations related to the activity of
producing/storage of biogas/biomethane,
PDSB type
15 ANRE Permit of Be type 12815
16 Environmental Construction works for fluids utilitary 13
Protection Agency projects; Maintenance and repair of
(Head Offices) vehicles
Fabrication of steel structures and
Environmental
component parts of steel structures;
17 Protection Agency 12
Treatment and coating of steels; General
(CARAIMAN)
mechanics operations
Repair of steel stable vessels under
18
I.S.C.I.R. pressure DISPR/CR4/C/8/1769
19 I.S.C.I.R. Erection, repair at steel piping for fluids DISPR/CR4/B,C/13/1770
Erection and repair at steel piping for
20
I.S.C.I.R. steam and hot water DISPR/CR4/B,C/19/1771
21 I.S.C.I.R. Installing, erection, repair of steam boilers DISPR/CR4/B,C/4,5/1772
Capacity of performance for specific GANEx.Q.2018.
22
INSEMEX Petrosani activities (53).12.1597
Accreditation of NDE examinations (NDE
23
ANR lab.) - Utg 25427/4/AS/SAPNI-SP
Accreditation of NDE examinations (NDE
24
ANR lab.) - RT;MT;UT;PT 17329/9/AS/SAPNI-SP
Authorization of product and services
25
ANR provider within naval field 83846 SAPNI-SP HM
Development of activity within nuclear
26
CNCAN field - to use VG 2332
Development of activity within nuclear
27
CNCAN field - to transport Petroconst Transport_20
Development of activity within nuclear
28
CNCAN field - to hold GM 2052
29 I.S.C.I.R.- Buc. PT – Examinations with penetrant liquids DISPR/CR6/TIPA/0129/2
UT – Examinations with ultrasounds,
30
I.S.C.I.R.- Buc. specialty(s,t) DISPR/CR6/TIPF/0111/2
UT(g) – Measurement of thicknesses with
31
I.S.C.I.R.- Buc. ultrasounds DISPR/CR6/TIPE/0124/2
RT – Examination with penetrant
32
I.S.C.I.R.- Buc. radiations, specialty(γ) DISPR/CR6/TIPD/0046/2
Installing and maintenance of systems and
33
IGSU - CNSIPC tools for fire fighting A/0354

4. EXPANSION ON LONG TERM


Our company has refurbished the production base of
CARAIMAN, having in view the following structure:

- Workshops: mechanical (steel manufactures and


welding), electrical, painting, sand blasting with an
area of 1,619 sq.m.
- Radiology building and laboratory for radiography
processing with an area of 173 sq.m.
Concrete plant

- Welding training school


- Locksmith training school
- Concrete station with an area of 110 sq.m.,
capacity of 60 c.m./h
- Paddocks with an area of 690 sq.m.
- Storage spaces with covered area of 2,500 sq.m.
and open area of 30,000 sq.m.

Storage areas – BICS Midia

All these objectives are insured and


monitored by a guard and protection agency
having also provided an outdoor lighting
system improved with video monitoring
cameras.

All these new production capacities have


replaced the existing ones which shall be
Steel manufacture workshop

demolished, step by step, over the


time.

Most of these objectives have been finalized until the end of 2014.
Mechanical Workshop in Caraiman

5. PRESENCE ON BUSINESS MARKET


Our company is developing the current activity on national level and
onshore.

Capacity / Workload
Our average workload and capacity for site works/services – with figures from previous and present
year)

Past year Current year


Welders 72 38
Fitters 88 45
Electricians 26 13
NDT 5 4
Engineers (total) 40 34

Our average workload and capacity for fabrication (per day, week or month – with figures from
previous years and actual figures from present year)

available for
fabrication this
year
Welders 38
- from which certified 29
Fitters 45
Mechanics 9
Electricians 13
NDT 4
Warehouse keeper for materials and tools 3
Other workers 39
TOTAL WORKERS 180
Engineers and foremen (available for fabrication) 26
Technical economical adminitration staff 36

Last year we had an average workload of 177 man-hour/month and present year is 178
man-hour/month

Current workload is 15” welded/welder/day


Maximum number of employees - 1.000 employees
Permanent employees at 31.12.2021: - 242 employees

6. TURNOVER

1. Turnover 2009 – 141,340,625 Lei


Gross Profit = 33,361,921 Lei

2. Turnover 2010 – 57,047,322 Lei


Gross Profit = 1,259,390 Lei
3. Turnover 2011 – 61,487,985 Lei
Gross Profit = 2,002,135 Lei

4. Turnover 2012 – 59,429,117 Lei


Gross Profit = 2,424,715 Lei

5. Turnover 2013 – 55,864,876 Lei


Loss = - 9,996,632 Lei

6. Turnover 2014 – 47,099,833 Lei


Gross Profit = 447,303 Lei

7. Turnover 2015 – 46,496,567 Lei


Gross Profit = 9,652,792 Lei

8. Turnover 2016 – 33,830,408 Lei


Loss = -11,485,238 Lei

9. Turnover 2017 – 37,066,500 Lei


Gross Profit = 256,599 Lei

10. Turnover 2018 – 40,623,976 Lei


Loss = -12,486,155 Lei

11. Turnover 2019 – 90,959,297 Lei


Gross Profit = 946,961 Lei

12. Turnover 2020 – 107,074,831 Lei


Gross Profit = 1,309,641 Lei
7. TRADITIONAL PARTNERS
Among traditional partners, well known, of PETROCONST S.A. CONSTANTA we mention hereby:
OMV PETROM S.A., TRANSGAZ S.A., ROMPETROL S.A., GDF SUEZ Energy, R.A.J.A.

8. PROJECTS (TYPE, LOCATION, CHALLENGES)

Onshore and Offshore Oil and Gas Brownfield Project Experience and Capability

Description/ Total contract price Contract period


Crt. Object of the contract Beneficiary’s name/
No. Address
1 2 3 4 5
Delta Offshore Field Development
Engineering, Procurement, Construction and
Commissioning, for installation of tools,
equipment, piping, instrumentation and
automation on offshore platforms:
- Platform PFCP – works of Engineering,
Procurement, Construction and
Commissioning for Pigging trap, Slug
Catcher, Extension of steel structure Jacket
OMV Petrom SA,
1, Extension of steel structure block A - PFS
Calea Dorobantilor
3 – works of Engineering, Procurement, 20.196.000 EUR 29/02/2008
1. Str., No. 239,
Construction and Commissioning for without VAT 30/06/2010
Bucharest,
chemical skid (Methanol Injection), Pig trap,
Sector 1
Extension of steel structure Jacket 6 ;
- PFS 7 – works of Engineering,
Procurement, Construction and
Commissioning for production separator
Baker, Flare system (flare ignition system,
KO drum, pig trap, chemical skid (wax
inhibitor), chemical skid (Methanol Injection),
gas subsea pipeline PFS 6 – PFS 7,
Extension of steel structure Jacket 7.
Distributed Control System Delta
Engineering, Procurement, Construction and
Commissioning, for installation of tools,
equipment, piping, instrumentation and
automation on offshore platforms:
Works of Engineering, Procurement,
OMV Petrom SA,
Construction and Commissioning for :
Calea Dorobantilor
- Dismantling on PFS 3,6,7 and PFCP; 4.914.000 EUR 03/2009
2. Str., No. 239,
- Emplacement of Control Room on PFS without VAT 24/08/2010
Bucharest,
3,6,7 and PFCP;
Sector 1
- Installation of new DCS System on PFS
3,6,7 and PFCP;
- Installation of Microwave Radio System on
PFS 3,6,7 and PFCP;
- Pre-commissioning and Commissioning and
Training
3. LWO3 and LWO4 wells tie in OMV Petrom SA,
Engineering, Procurement, Construction and Calea Dorobantilor 773.000 EUR 03/05/2009
Commissioning for Works for surface Str., No. 239, without VAT 21/03/2011
facilities tie-in for L1, L3 and I4 Bucharest,
- Engineering (Basic, Detail, Electrical
Heating and As-Build) ;
- Procurement (Bulk Material for
Mechanical, Electrical and Instrumentation,
AUTOCON );
- Onshore fabrication (Production manifold
for 3 wells, spool and suports);
- Offshore works
- Dismantling works (dismantling TX oil
pump and the a.c. ACF pump ;
decommissioning of old Baker burner
support) ;
- Steel Structure (completion of the
extension bridges on the jacket 6B console,
provided with protection panels against
wind ; extension deck +23000 mm ; rigid
consolidation deck +11500 mm in the MP4 Sector 1
area ; build and install aligning systems for
new wells leads LV03 & LV04) ;
- Mechanical works (installation of
Production manifold MP4, flow-lines for the
new wells and reconfiguration for some
existing, links between production manifolds
MP3-MP4, depressurizing and drainage
lines, pressure tests);
- Electrical and Instrumentation works
(Lighting System Installation, Install and
connect a new Wells Control Panel with 3
hydraulic circuits for 6 wells, installation of
HI-LOW pilots, Installation of Fire & Gas
detection system, Installation of New
AUTOCON, Electric Heating Installation) ;
- Pre-commissioning and Commissioning
Compressor Upgrade on PFS 6, 7 and 8
Engineering, Procurement, Construction and
Commissioning for Compressor Upgrade on
PFS 6, 7 and 8 :
Works of Engineering, Procurement,
Construction and Commissioning for :
- Engineering (Basic, Detail, Electrical
Heating and As-Build) ;
- Procurement (Bulk Material for
Mechanical, Electrical and Instrumentation, OMV Petrom SA,
Compressor Suction Scrubbers, Ultrasonic Calea Dorobantilor 16/09/2009
1.456.000 EUR
4. Gas Flow meter); Str., No. 239,
without VAT 29/11/2010
- Steel structure (Stiffening deck on PFS 6 Bucharest,
and 7); Sector 1
- Mechanical works on PFS 6,7 and 8
(installation of condensate vessel,
compressor suction scrubbers & tie-in,
ultrasonic gas flow meter);
- Electrical and Instrumentation works on
PFS 6,7 and 8 (Installation of Fire System,
AMC for Compressor Suction Scrubbers and
measurement equipment system) ;
- Pre-commissioning and Commissioning
5. Works for surface facilities tie-in for L1, OMV Petrom SA, 1.202.000 EUR 08/07/2010
L3 and I4 Calea Dorobantilor without VAT 12/10/2011
Engineering, Procurement, Construction and Str., No. 239,
Commissioning for Works for surface Bucharest, Sector 1
facilities tie-in for L1, L3 and I4 :
- Engineering (Basic, Detail, Electrical
Heating and As-Build) ;
- Procurement (Bulk Material for
Mechanical, Electrical and Instrumentation,
MEG Skid, TEG Skid );
- Onshore fabrication (Production manifold
for 6 wells, spool and supports);
- Offshore works
- Temporary works (pipeline connections,
dismantling HI-LO-1 pcs and installing HI-
LO-2 pcs);
- Mechanical works (installation of MEG
Skid, TEG Skid, Production manifold,
pipelines, pressure tests);
- Electrical and Instrumentation works
(Instrumentation & Electrical Cable
Installation, Installation of New AUTOCON,
impulse line installation, instrumentation and
power board installation, Electric Heating
Installation, Integration of SS) ;
Pre-commissioning and Commissioning
Surface installations for wells in gas-lift
to PFS 3 and PFS 6 –
Black Sea Stage II
Manufacture and installation of gas-lift
vertical distributor with two collectors for 4
wells (L5,L9,L11,I7); Manufacture and
installation of gas-lift vertical distributor with
two collectors for 4 wells (I10,L01,L02,L04);
Manufacture and installation of gas-lift
vertical distributor with two collectors for 4 OMV Petrom SA,
wells (I9,L12,L10,si GL-flexible tubing); Calea Dorobantilor 1.169.000 EUR 03/09/2008
6.
Manufacture and installation of technological Str., No. 239, without VAT 22/10/2009
lines; installation of measuring and Bucharest, Sector 1
monitoring of gas-lift process parameters;
manufacture of deck extension at elevation
+23; engineering, material procurement,
manufacture, installation and commissioning
for power supply panel for submersible
pumps and crude oil transfer pumps;
rehabilitation of drain system from
technological plant; modification of LP mixing
lines.
Low pressure gas compression on
platforms PFS 6, 7, 8 and cogeneration OMV Petrom SA,
on platforms PFS 6, 7 – Black Sea Calea Dorobantilor 08/2006
8.375.000 EUR
7. Installation of 3 pcs of compressors, one Str., No. 239,
without VAT 02/2008
for each platform PFS 6, 7, 8 and Bucharest,
installation of 2 pcs of cogeneration units Sector 1
on platforms PFS 6 and PFS 7
Electrical heating for pipelines and
automation equipment on offshore OMV Petrom SA,
pipelines Calea Dorobantilor 12/10/2006
1.610.000 EUR
8. Works of electrical heating for pipelines and Str., No. 239,
without VAT 26/05/2008
automation equipment on offshore platforms Bucharest,
PFSSU, PFCP, PFS 3, PFS 4, PFS 6, PFS 7, Sector 1
PFS 8
9. Well 317 Sinoe – Production Manifold OMV Petrom SA, 512.000 EUR 21/11/2008
Calea Dorobantilor
Manufacture and installation of production Str., No. 239, 19/05/2009
without VAT
manifold for 3 wells Bucharest,
Sector 1
Unmanned Pescarus Platform
Works of engineering, procurement,
fabrication and installation of
- Assembly J-tubes to PFC/C1-PFS-U
(protection submarine electrical cables
power and optic);
- Assembly protection panels J-tubes to
PFC/C1-PFS-U ;
- Assembly submarine electrical cables
and optic fiber between PFC/C1-PFS-U ;
- Assembly extensions at cotes +12.500 m
and +20.500 m on jacket PFS-U-West
Side
OMV Petrom SA,
- Installation of 6/0.4 KVA transformer ;
Calea Dorobantilor 21/11/2006
- Installation of 0.4/0.23 KVA transformer ; 8.795.000 EUR
10. Str., No. 239,
- Installation of 6 KVA cell ; without VAT 22/12/2011
Bucharest,
- Installation of 10 cm water tank at
Sector 1
+16.500 m ;
- Installation of 5 tf crane ;
- Installation of subsea pumps ;
- Installation of instrumental-air
compressor;
- Installation of burners at cote +12.500
m;
- Electrical heating ;
- Installation of subsea pipeline Ø 6” x 11
mm – L=9 Km ;
- Electrical and Instrumentation equipment
installation ;
- Pre-commissioning and Commissioning
Installation of subsea pipe between
PFS6 and PFS7
Works of engineering, procurement,
fabrication of subsea pipeline spools (3
pcs x 1 Km) and risers (2 pcs), fabrication
of bridges for +9.000 m (2 pcs), launching OMV Petrom SA,
to the sea of pipe spools and risers, Calea Dorobantilor 09/08/2010
2.131.000 EUR
11. assembly of the spools and risers, Str., No. 239,
without VAT 07/12/2011
recovery of floats to the shore, dismantling Bucharest,
works on platforms, installation of bridges Sector 1
and technological pipes on platforms
(PFS6&PFS7), mechanical, electrical and
instrumentation works on offshore
platforms (PFS6&PFS7), Pre-
commissioning and Commissioning.
12. Well G10 Surface Facilities tie-in on OMV Petrom SA, 4.114.132,09 EURO 20/12/2011
PFS 3 – ctr.no.8460014583 / 2011 Calea Dorobantilor without VAT 07/2013
Engineering, Procurement, Construction Str., No. 239,
and Commissioning, for installation of Bucharest,
tools, equipment, piping, instrumentation Sector 1
and automation :
- Engineering services for mechancial, steel
constructions, electrical and instrumentation
works, electrical heating
- Procurement of materials/tools and
equipment;
- Manufacturing and installing of
technological pipelines
- Manufacturing and installing of steel
structures (decks, skids, flare supporting
structure);
- Manufacturing and installing of gas
manifold for 4 wells;
- - Installing of SOB separator on place and
connecting to the plant;
- - Installing of methanol skid on place and
connecting to the plant;
- - Installing of KO-DRUM skid on place and
connecting to the plant;
- - Installing of flare system on place and
connecting to the plant;
- - Electrical works (cable trays, cables,
lighting devices, electrical panels) ;
- - Automation and instrumentation works
(cable trays, cables, instrumentation,
automation panels);
- - Works of electrical heating for pipelines
and equipment (heating cables, thermal
insulations, panels for electrical heating);
- Procurement, installation and connection
of Well Control Panel;
- Upgrading of software for integration into
DCS.
13. Completion tie-in well 825 on PFS 6 – OMV Petrom SA, 1,861,323.33 EURO 20/12/2011
ctr.no. 8460014595 / 2011 Calea Dorobantilor without VAT 07/2013
Engineering, Procurement, Construction Str., No. 239,
and Commissioning, for installation of Bucharest,
tools, equipment, piping, instrumentation Sector 1
and automation :
- Engineering services for mechancial, steel
constructions, electrical and instrumentation
works, electrical heating
- Procurement of materials/tools and
equipment;
- Manufacturing and installing of
technological pipelines
- Manufacturing and installing of steel
structures (decks, skids, flare supporting
structure);
- Manufacturing and installing of production
manifold for 3 wells;
- - Installing of Pig Receiver and connecting
to the plant on PFS 6;
- - Installing of Pig Launcher and connecting
to the plant on PFS 7;
- - Installing of KO-DRUM skid on place and
connecting to the plant;
- Installation of 6A-6B JACKET Deck -
North Side (+11.500) ;
- Installation of 6B JACKET Deck - East
Side (+8.500) ;
- Installation of 6A-6B JACKET Deck -
North Side (+9.000) ;
- - Installation of 6B JACKET Deck - North
Side (+18.500) ;
- - Installation of 6A JACKET Deck - North
Side (+22.500)
- - Electrical works (cable trays, cables,
lighting devices, electrical panels) ;
- - Automation and instrumentation works
(cable trays, cables, instrumentation,
automation panels);
- - Works of electrical heating for pipelines
and equipment (heating cables, thermal
insulations, panels for electrical heating);
- Software Implementation.
OMV Petrom SA,
Improvement of the gas compressor 613.000 EUR 08/11/2012
Calea Dorobantilor,
14. reliability by a better liquid-gas segregation to without VAT
Nr 239, Bucuresti, 05/2013
the PFS 6 & 7 gas compressor
Sector 1
Rominserv S.R.L.
Repair works for electric plant to Bd. Navodari 215 294.172 USD 13/07/2012 –
15. technological installations from Petromidia Navodari, without VAT 13/11/2015
Platform jud. Constanta
Tel: 0241506094
Rominserv S.R.L.
Bd. Navodari 215
806.772,42 USD 30/04/2013
RIS-OPR-RAF-2013_Carbon producing, Navodari,
16. without VAT
DGRS, degasification revision (Rompetrol) jud. Constanta 30/04/2014
Tel: 0241506094

Rominserv S.R.L.
Bd. Navodari 215
1.407.737,32 USD 30/07/2013
Refurbishment of CARBON PRODUCING Navodari,
17. without VAT
plant jud. Constanta 30/07/2014
Tel: 0241506094

Rominserv S.R.L.
Bd. Navodari 215 31/03/2013
832.000 EUR
18. RIS-NEW-SRU – Pipeline installation Navodari,
without VAT 31/03/2014
jud. Constanta
Tel: 0241506094
Megaconstruct
S.R.L.
Natural gas distribution network in Mangalia 
Bucuresti, Sector 3, 2.905.211,98 EUR 30/11/2013
19. city and afferent resorts: Saturn, Venus, Cap
Pta Unirii nr.1, without VAT
Aurora, Neptun and Olimp
Corp Central ,Et.5,
Spatiu C5.02
Oil Terminal S.A.,
2.351.980,70 EUR 01/07/2013
20. Refurbishment of R28 SPS tank Str. Caraiman, nr. 2,
without VAT
Constanta
Construction-assembly works, environmental
arrangement and protection, facility provision
and endowments related to the project
Mara Construct 09/03/2012 -
“Rehabilitation of the TROPAEUM TRAIANI ” 925.726,58 EUR
21. S.R.L. 23/08/2013
Triumphal Arch mediului, asigurarea without VAT
utilitatilor si dotari aferente proiectului
Reabilitare Monument Triumfal TROPAEUM
TRAIANI
Ensuring the Safety for the Ø32” natural gas TRANSGAZ S.A.
transmission line Sendreni-Silistea- Piata C. I. Motas, Nr. 2.295.170 EUR 15/04/2013 –
22. 30/10/2013
Bucharest : stage I : area I-Valve R9S Sinesti 1 551130, Medias without VAT
(km 164+242) – Nod Afumati (km 172+711) Jud. Sibiu, Romania 
23. Discharge pipeline into the Black Sea, AlStom Company 975.000 EUR 02/06/2014
S.R.L.
Mangalia locality Str. Siretului nr. 1 without VAT
Constanta
Preparation of the ø20” natural gas IPM-PARTNERS
transmission line SILISTEA-BUCURESTI ROMANIA S.A. 10/06/2013 –
925.659 EUR
24. with a view to pigging and diagnostic: Strada Marin 31/07/2014
without VAT
Placement of Dn 500 pig trap within SCV Mehedinteanu, nr 7
Sendreni Ploiesti, Prahova
TERMAR PROD
Dismantling, loading, transfer and unloading
COM S.R.L. 480.000 EUR 02/07/2013
25. to Slobozia of the equipment from Cargill
Str. Varful cu Dor, without VAT
Podari factory
nr. 10, Constanta
HABAU PPS
Interconnection pipeline of the  Gas PIPELINE
Transmission National System in Romania SYSTEMS SRL 65.000 EUR 31/12/2013
26.
with the  Gas Transmission National System Strada Sinaii, Nr: 3 without VAT
from the Republic of Moldova - IASI-Ungheni Etaj: 1-2 
Ploiesti, România
“Field adaptation of the measuring lines TRANSGAZ S.A.
which are to be installed by SCADA project Piata C. I. Motas, Nr. 3.808.831 EUR 21/07/2014 –
27. 24/08/2015
at TECHNOLOGICAL KNOT PODISOR, 1 551130, Medias without VAT
commune of Bucsani”   Jud. Sibiu, Romania 
TRANSGAZ S.A.
Repair of the Ø 20” pipeline F2 Caldararu – Piata C. I. Motas, Nr. 1.014.122 EUR 01.08.2014-
28. 03.11.2015
Podisor – Section 2 1 551130, Medias without VAT
Jud. Sibiu, Romania 
Repair works for electric plant to
technological installations from Petromidia
Platform
- Maintenance, periodical checks and Rominserv S.R.L.
measurements to the installation of Bd. Navodari 215 1.444.185 USD 07/04/2015 –
29. atmospheric over-voltage protection Navodari, without VAT 07/04/2017
(lightning arrester) jud. Constanta
- Maintenance works for electric installations Tel: 0241506094
at PETROMIDIA platform
- Maintenance and overhauling to tool heating
installations with special electric cables
OMV Petrom SA,
Calea Dorobantilor, 224.199 EUR 2014 - 2015
30. PCC of PIG Trap Modification
Nr 239, Bucuresti, without VAT
Sector 1
PCC of PFS3 & PFS6 Production
Temporary Flare
- Flare boom (Procurement & onshore work
for PFS 3 & PFS 6) ;
OMV Petrom SA,
- PFS 6 modification ; 07/2014 –
Calea Dorobantilor, 692.175 EUR
31. - PFS 3 modification ; 09/2015
Nr 239, Bucuresti, without VAT
- Mounting & Demounting Temporary Flare
Sector 1
on PFS 3 & PFS 6 ;
- Demounting & Mounting Permanent Flare
PFS 3
- Demounting Old Flare of PFS 3.
OMV Petrom SA,
FRD Istria well Tie-in 008 Phase 2 Calea Dorobantilor, 150.000 EUR 08/2014 –
32. 01/2015
PCC of tie-in well 827on PFS6; Nr 239, Bucuresti, without VAT
Sector 1
33. PCC for Riser protection panels and boat OMV Petrom SA, 242.861 EUR 03/2015 –
landing panels on PFS6, PFS7 and PFS8 : Calea Dorobantilor, without VAT 07/2015
- PROTECTOR 1 RISER - NORTH FACE
JACKET 6B;
- PROTECTOR 2 RISERS - NORTH FACE
JACKET 6A;
- PROTECTOR 4 RISERS - SOUTH FACE
JACKET 6B;
- BOAT LANDING - WEST FACE PGSU 6;
- PROTECTOR 1 RISER - NORTH FACE
JACKET 7A; Nr 239, Bucuresti,
- PROTECTOR 2 RISERS - NORTH FACE Sector 1
JACKET 7A;
- PROTECTOR 1 RISER - NORTH FACE
JACKET 7B;
- BOAT LANDING - WEST FACE PGSU 7;
- BOAT LANDING - SOUTH FACE JACKET
8;
ACCES LADDER FROM +8,20 M TO
+12,23 M - JACKET 8
Tie-ins PFS6 Phase 1 and PFS3 Phase 2
- PCC of tie-in well 826A on PFS6;
- PCC of tie-in well 821A on PFS6; OMV Petrom SA,
- PCC of PFS6 crude oil tank; Calea Dorobantilor, 703.873 EUR 01/2015 –
34. 10/2015
- PCC of tie-in well L12A on PFS3; Nr 239, Bucuresti, without VAT
- PCC of foot bridge change on PFS3; Sector 1
- PCC of tie-in well I10A on PFS3;
PCC of temporary flare on PFS6.
RIS-REHAB-ROAD – Parking gate 2 truck
trailers:
-Truck Trailer Parking area rehabilitation,
Rominserv S.R.L.
Gate 2;
Bd. Navodari 215 13/10/2016 –
-Building up the manhole with hydraulic 398.273 USD
35. Navodari, 09/12/2016
guard; without VAT
jud. Constanta
-Building up the oil produt separator, culvert
Tel: 0241506094
and undercrossing;
-Removal of the existing foundations,
delimitation of roadways.
2. RIS-SPM-CHG-OUT-2015 – Mechanical General Contractor : 38.807 USD 09/04/2015 –
works – Hose replacement: S.C. Rominserv without VAT 19/08/2015
- Unloading from trucks of the racks with S.R.L.
hoses; Beneficiary :
- Assemblying of strings no. 1,2,3,4 groove S.C. MIDIA MARINE
floating hoses (transferring from the rack, TERMINAL S.R.L.
placing on the platform and assemblying by
coupling in flanges of the hoses, mounting
of butterfly valves, mounting of cam-locks,
carrying out the pressure test including the
mounting/dismantling of blind flange,
mounting of hose holding chains by gripping
with 3 shackles) ;
- Dismantling of strings no. 1,2,3,4 groove
floating hoses (Dismantling of hoses by
flange decoupling, transferring from the
platform and transporting to the washing
area, dismantling of butterfly valves,
dismantling of cam-locks, dismantling of
hose holding chains);
- washing of marine hoses and placing on
racks;
- Stowing of marine hose racks;
- Assemblying of string no. 3 groove subsea
hoses (transferring from rack, installing of
floats, pressure test, checkered plate covers,
profiles for container sea fastening, rack
transportation, loading of containers on the
barge).
RIS-SPM-CHG-OUT-2015 – Engineering,
execution and mounting of the launching
General Contractor :
platform
S.C. Rominserv
- Detailed Engineering; 27/04/2015 –
S.R.L. 35.500 USD
3. - Material procurement; 16/07/2015
Beneficiary : without VAT
- Manufacturing and installation of the
S.C. MIDIA MARINE
platform’s steel structure;
TERMINAL S.R.L.
- Prefabrication and installation of the
reinforced concrete foundations.
RIS-OPR-RAF-2015 ; RIS-ISCIR-RAF-2015
– Mechanical works group 4 – Carbon-
producing and RGF installations:
- Revision mechanical works to the tools and
Rominserv S.R.L.
piping from Cx and RGF installations;
Bd. Navodari 215 15/10/2015 –
- VTU mechanical works with a view to 1.678.513 USD
4. Navodari, 30/11/2015
obtaining the operation certificate from ISCIR without VAT
jud. Constanta
for the tools and piping from Cx and RGF
Tel: 0241506094
installations.
- Revision additional mechanical and repair
works to the tools and piping from Cx and
RGF installations.
RIS-REAB-P48 – Mechanical works into
the foam chamber afferent to P48 tank:
- Mounting of equipment – tank with
membrane and foaming agent dosimeter
and foam proportioning and preparation
mixer – 2 pcs. Rominserv S.R.L.
- Prefabrication and installation of water and Bd. Navodari 215 29/06/2016 –
57.898 USD
5. foam piping; Navodari, 02/09/2016
without VAT
- Prefabrication and installation of piping jud. Constanta
racks; Tel: 0241506094
- Execution of tie-in from new pipelines to
existing pipelines;
- Mounting of fittings;
- Additional civil and mechanical works as
per Site Specification(DS)
RIS-ISCIR-RAF-2016, RIS-OPR-RAF-2016
– Mechanical works group 2 – Carbon-
producing and MTBE :
- Revision mechanical works to the tools Rominserv S.R.L.
and piping from Cx Installation and MTBE Bd. Navodari 215 29/08/2016 –
269.286 USD
6. Installation; Navodari, 20/09/2016
without VAT
- VTU mechanical works with a view to jud. Constanta
obtaining the operation certificate from Tel: 0241506094
ISCIR for the tools and piping from Cx
Installation and MTBE Installation ;
- Additional Works for Cx Installation
Construction Management Support Services General Contractor :
and onshore fabrication, offshore hook-up PSE Engineering 09/2014 /
5.659.832 EUR
7. and warehousing works for LENAG Project, GmbH 05/2016
without VAT
in accordance with the scope of works Beneficiary :
OMV Petrom SA
8. Construction Planning Support, Material General Contractor : 211.626 EUR 02/2017 –
Management Services, Onshore Fabrication PSE Engineering
and Offshore hook-up works for PFCP-B GmbH
without VAT 06/2017
F&G SYSTEM Upgrade Project, in Beneficiary :
accordance with the scope of works OMV Petrom SA
Construction Planning Support, Material General Contractor :
Management Services, Onshore Fabrication PSE Engineering
1.034.984 EUR 02/2017 –
9. and Offshore Hook-Up Works for System 41 GmbH
without VAT 12/2017
Upgrade – Gas-Supply Turbo-Generators Beneficiary :
on PFCP Project OMV Petrom SA
Construction Planning Support, Material General Contractor :
Management Services, Onshore Fabrication PSE Engineering
457.606 EUR 03/2017 –
10. and Offshore Hook-Up Works for PGSU-3, GmbH
without VAT 09/2017
PGSU-6 and PGSU-7 Lifeboats Installation Beneficiary :
Project OMV Petrom SA
Construction Planning Support, Material General Contractor :
Management Services, Onshore Fabrication PSE Engineering
540.663 EUR 04/2017 –
11. and Offshore Hook-Up Works for Water GmbH
without VAT 12/2017
Injection Pumps Replacement - PCCM Beneficiary :
Project OMV Petrom SA
RIS-OPR-RAF-2017 ; RIS-ISCIR-RAF-2017
– Mechanical works static tools and
piping – COKING, RGF, DGRS, NEW SRU,
STRIPPING Installations: Rominserv S.R.L.
- Overhauling mechanical works to the tools Bd. Navodari 215
269.286 USD 02/05/2017 –
12. and piping from COKING, RGF, DGRS, NEW Navodari,
without VAT 05/06/2017
SRU, STRIPPING Installations; jud. Constanta
- VTU mechanical works with a view to Tel: 0241506094
obtaining the operation certificate from ISCIR
for the tools and piping from COKING, RGF,
DGRS, NEW SRU, STRIPPING Installations.
Crane 5 Replacement Project General Contractor :
- Engineering, Procurement, Construction & PETROCONST S.A.
2.435.000 USD 19.09.2017 –
13. Commissioning  Contract for  Offshore Crane Principal 04.10.2018
without VAT
Replacement /Beneficiary
OMV Petrom S.A.
Contractor :
Development of the National System of Association with
Natural Gas Transmission on the passage INSPET S.A.
Bulgaria-Romania-Ungaria-Austria associate 28.11.2018 –
60.225.118 RON
14. ( BRUA - Phase 1) PETROCONST S.A. 30.06.2020
without VAT
Construction works of LOT 1 pipeline from
Beneficiary :
Km 0 to Km 180 and  LOT 2  from  Km 180
to Km 320 S.N.T.G.N.
TRANSGAZ S.A
Contractor :
Association with
Development of the National System of INSPET S.A.
Natural Gas Transmission on the passage associate
30.525.902 RON 23.03.2018 –
15. Bulgaria-Romania-Ungaria-Austria PETROCONST S.A. 30.06.2020
( BRUA - Phase 1)-  Construction works for without VAT
STC Bibesti – Gas Compression Station Beneficiary :
S.N.T.G.N.
TRANSGAZ S.A
9. OWNED EQUIPMENT AND TOOLS

Equipment, materials and associated services provided for performing the works
Description of the infrastructure:
Description of tool/equipment/plant
Power /
No of pcs.
(Type/model) capacity

A) CONSTRUCTION AND SMALL MECHANIZATION TOOLS


TYRED SHOVEL – KOMATSU PW 130-7K 1,0 mc 1
CRAWLER EXCAVATOR – KOMATSU PC210LC-8 1.3. mc 2
BULLDO-EXCAVATOR KOMATSU WB93R-2 0,4÷0,6 mc 8
FRONT LOADER WOLLA L34 3.4 mc 1
BULLDOZER KOMATSU D41E 110 CP 2
MOTOR-CRANE CKD AD 30 30 tf 1
CRANE TELEMAC HT125 12.5 tf 2
CRANE HYDROM 18 tf 2
CRANE XCMG 2575 25 tf 1
CRANE RDK 30 tf 1
CRANE SIDE BOOM CATERPILLAR 18 tf 8
COMPACTOR WEBER WITH DRUM OF 500 MM 1 to 2
COMPACTOR VV170 16 to 1
JOLT RAMMER MS680 5 KW 6
MOTOR-COMPRESSOR P130 WB Ingersoll 3 mc/min 1
MOTOR-COMPRESSOR 7/51 Ingersoll 5 mc/min 4
MOTOR-COMPRESSOR 21/215 Ingersoll 22 mc/min 1
AIR COMPRESSOR 0.3 mc/min 1
ORBITAL WELDING MACHINE IN CO2 TYPE
400 A 3
FRONIUS-TPS400i
WELDING MACHINE INVERTER MASTER 2500 250 A 6
WELDING MACHINE MASTER 3500 MLS 350 A 41
WELDING MACHINE UNIVERSAL 330DC 330 A 5
WELDING GENERATOR SET ENERGY   9
WELDING MACHINE IN CO2 TYPE STT-II 300 A 1
WELDING MACHINE MIG-MAG VS 4000 2 400 A 1
WELDING MACHINE IN CO2 TYPE FRONIUS 400 A 1
WELDING MACHINE IN CO2 TYPE ORIGOMIG 402C 400 A 8
WELDING MACHINE ARGON TYPE TRANSTIG 1700 170 A 2
WELDING MACHINE ARGON TYPE TRANSTIG 2500 250 A 1
WELDING MACHINE ARGON TYPE TRANSTIG 1750
220 A 9
PLUS
INVERTER TRANSPOKET   3
PLASMA ARC CUTTING MACHINE   2
PORTABLE CARRIER FOR PIPING OXYACETYLENE
DN=200-1200 1
CUTTING
INTERNAL/EXTERNAL ALIGNER FOR PIPING Ø 6” ÷ 40” 10
GENERATOR SET 40 KVA 40 KVA 1
GENERATOR SET 38 KVA 38 KVA 1
GENERATOR SET 30 KVA 30 KVA 2
GENERATOR SET 30 KVA 30 KVA 1
GENERATOR SET GSL 42D 42 KVA 1
GENERATOR SET GEP 44 44 KVA 1
GENERATOR SET 145 KVA 1
GENERATOR TN 16 16 KVA 1
GENERATOR ENERGY 4500M 4,5 KVA 8
GENERATOR ENERGY 6500M 6,5 KVA 4
GENERATOR HONDA 6,5 KVA 1
POLYETHYLENE CUTTING MACHINE – FRIATEP   1
HORIZONTAL MILLING MACHINE   2
WELDING PARAMETER RECORDING MACHINE   1
ELECTRO-FUSION MACHINE FRIAMAT   1
ELECTRO-FUSION MACHINE 350A 6
WELDING MACHINE PT630   1
POLYETHYLENE BUTT FUSION MACHINE Ø63 – Ø160 4
POLYETHYLENE BUTT FUSION MACHINE Ø63 – Ø250 3
POLYETHYLENE BUTT FUSION MACHINE Ø63 – Ø315 2
POLYETHYLENE BUTT FUSION MACHINE Ø315 – Ø500 2
POLYETHYLENE BUTT FUSION MACHINE Ø315 – Ø600 1
PVC WELDING MACHINE P250 Ø250 1
PVC CUTTING SAW TYPE GEZ 14 4.5 KW 2
GRINDER – MAKITA 2.5 KW 39
POLIZOR – BLACK & DECKER 2.5 KW 12
GRINDER-6WS21180 JB BOSCH 2.5 KW 34
LATHE SNB 400X1500P   1
UNIVERSAL LATHE SPF2000   1
BORING MACHINE E2020F/400   1
BORING MACHINE FP400   1
BORING MACHINE ETN2   1
BORING MACHINE GBH5   3
BORING MACHINE GBM 23-2   1
MAGNETIC BORING STAND   1
CIRCULAR SAW TERROBLAN DS510   1
CIRCULAR SAW ROBLAND Z3200   1
THREADING KIT SUPERTRONIC   1
ELECTRICAL THREADING KIT   4
TORQUE INDICATOR HANDLE WRENCH ¾   2
ELECTRONIC CALIPERS   1
OUTSIDE MICROMETER Ø=50-75 1
MICROMETER   1
PNEUMATIC WRENCH   1
MANUAL PRESSER   1
STEEL ROTATORY SAW   1
PIPE CUTTER   1
BENDING MACHINE   2
CUTTING AND BENDING ELECTRIC DEVICE   1
PLATE BENDING MACHINE – SWAING   1
CONCRETE CUTTING MACHINE – SM57-2   1
ASPHALT AND CONCRETE CUTTING MACHINE –
400 mm 3
MJD400
FLOOR POLISHING MACHINE 380 mm 1
BURRIED PIPE DETECTOR D400   1
MOTOR-PUMP 2” – ROBIN 1000 l/min 1
MUD PUMP SP20   2
PAINTING PUMP   1
ELECTRODE DRYING OVEN 50Kg 5
STOVE 100 L 100L 1
ELECTRIC OVEN PD 0-20   3
PICK-HAMMER – BOSCH D27 mm 4
PICK-HAMMER PNEUMATIC   1
PNEUMATIC HAMMER   1
HULKING HAMMER INGERSOLL 6 bar 3
HULKING HAMMER GSH16   1
DRILL HAMMER   1
PRESSURE PUNCHING MACHINE Dn=80-125 1
VIBRANT BEAM DYNAPAC 4,25 m 2
CONCRETE FINISHING MACHINE DYNAPAC D900 mm 1
GENERATOR+VIBRATOR KIT   1
VIBRATOR RACOON   4
CONCRETE MIXER 350L/C   1
MOBILE EXHAUSTER 560 mc/h 4
UNDERCROSSING ROCKET   1
MOTOR-MOWER   3
PRESSURE PUMP AQUATAK 160 bar 1
PRESSURE FLUSHING PUMP   1
PRESSURE TEST PUMP   1
PRESSURE PUMP 320 bar 1
PUMPING SET HAWE 300   1
TANK WITH PUMP 9000 L 1
TANK 2000 L / 30 BAR 2000 L 1
STEEL SCAFFOLD H=2,5 M 4
HYDRAULIC PALLET   1
GPS STENEX 59   1
THEODOLITE T100   1
THEODOLITE   1
BALANCE LEVEL NA 724   1
SEMI-AUTOMATIC BALANCE 500 KG 1
SEMI-AUTOMATIC BALANCE 1000 KG 1
RADIOGRAPHY DEVICE   2
MAGNETIC YOKE   1
RADIOGRAPHIC FILM DRYER   1
ULTRASOUND FAULT DETECTOR   2
THICKNESS MEASURING DEVICE   1
ELCOMETER+WELL   1
TELESCOPIC ROD 6 MM   1
PHASE INDICATOR    
MEASURING DEVICE APPGEOTEST   1
DIGITAL DOSIMETER   2
DOSIMETER VICTOREEN   1
DIGITAL INDIVIDUAL DOSIMETER   4
DOSIMETER RADIO READER   1
MEGOHMETER   1
NEGATOSCOPE   1
ISO TEST 49   1
ISO TEST 45   1
DUROMETER TH 1100   1
DENSIMETER   1
PULLEY BLOCK CRANE 1 tf 3
PULLEY BLOCK CRANE 3 tf 3
ELECTRIC WINCH 220 V   1
LEVER HOIST T532D   1
CHAIN HOIST 5 to 26
B) TRANSPORTATION MEANS
MOTOR-TRACTOR MERCEDES – ACTROSS 2644 LS 320 KW 1
TRAILER 35 to 1
MOTOR-TRACTOR IVECO EUROTEH 316 KW 2
TOWED CARRIER SJ35 22 to 2
TIP LORRY MERCEDES – ATEGO 1522K 9 to 6
MOTOR-TRACTOR MERCEDES 295 KW 2
TOWED CARRIER SCHMITZ 28 to 2
MOTOR-TRACTOR SEMIRR 19256 158 KW 2
TRUCK MERCEDES – ATEGO 1522L 10 to 1
CONCRETE MIXER MERCEDES 6 mc 1
CONCRETE MIXER MERCEDES 9 mc 2
CONCRETE PUMP MERCEDES 38 ml 1
UTILITY CAR DACIA 1307 55 KW 1
UTILITY CAR DACIA 1.9D 65 KW 2
UTILITY CAR DACIA LOGAN MCV 7 65 KW 2
ROAD TRACTOR U 651 65 CP 1
ROAD TRACTOR U 445 45 CP 1
ROAD TRACTOR U 483 48 CP 2
TRACTOR TIH 445 1.5tf 6
MOTOR TOWED CARRIER TANK 6000 L 1
VAN MERCEDES 19 places 11
UTILITY CAR OPEL 1+6 SEATS 1.5 to 2
UTILITY CAR FORD 1.5 to 1
UTILITY CAR FORD TRANSIT 3,5 to 3
UTILITY CAR IVECO 2,5 to 1
UTILITY CAR VOLKSWAGEN 1,5 1
MOTOR CAR DACIA DUSTER 4X4 5 places 3
C) OTHER EQUIPMENT
GAMMA MOBILE MOTOR LAB Mobil 1
NDT LABORATORY Fix 1
CONCRETE STATION TYPE ORU-ONE DAY 60 mc/h 1
CEMENT BUNKER   2
SAND BLASTING PLANT Mobile 5
THERMAL TREATMENT STATION TYPE VAS 45-6 Mobile 2
PIPELINE INSULATING STATION Fixed 1
PIPELINE INSULATION PLANT Mobile 1
MANUAL DEVICE FOR INSULATING BAND
Mobile 1
APPLICATION
STEEL MANUFACTURE AND CONCRETE
Fixed 2
PREFABRICATION WORKSHOP
LABORATORY GR.II – CATHODIC PROTECTION Mobile 1
CONCRETE LABORATORY Fixed 1
MECHANICAL TEST LABORATORY – CHECKING OF
Mobile 1
SURFACE ROUGHNESS
MOBILE COMPRESSOR UKS 3.7 Pmax.=240 bar 1
MOBILE COMPRESSOR UKS 2.3 Pmax.=240 bar 1
MECHANICAL PROCESSING EQUIPMENT FOR
STEEL PIPE ENDS WITH A VIEW TO WELDING AND D=100÷1000
1+1
EQUIPMENT FOR STEEL PIPE DEMAGNETIZATION mm
SUBJECT TO WELDING
D=273÷3000
Ex PROOF PIPE ROLL CUTTING MACHINE 1
mm

10. LICENSED SOFTWARE SYSTEMS + 14. PROCESS LICENSES


Operating Systems: WINDOWS XP, VISTA, 7, 8, 8.1, 10, WINDOWS SERVER 2012

Data base: MICROSOFT SQL 2014

Email: MICROSOFT EXCHANGE SERVER 2010 & MICROSOFT OFFICE OUTLOOK

Office Software Suite: MICROSOFT OFFICE 2003 - 2016

Internet Security Antivirus: KASPERSKY ENDPOINT SECURITY 10

Enterprise Resource Planning: CHARISMA ERP & CHARISMA HR

Project planner: PRIMAVERA & DOCLIB

Engineering Software: AUTOCAD, NAVIS WORKS

Legislation: LEGIS STUDIO

Other programs: TIS-OFFICE,


Undercrossing of the Danube-Black Sea Channel with Ø 1200 mm natural gas transmission line
Pn of delivered gas 5.4 MPa

Floating of the
Ø1200 mm natural gas pipe line

Overview of the undercrossing


Danube - Black Sea Channel

Ø 1200 mm waterborne natural


gas pipeline
Moment previous to
floats release
Strategic Objective, of worldwide proportions carried out together with Russian partners – OAO
Podvodtruboprovodstroy Moscow
Setting up and dredging works of the Danube river’s bottom, in Isaccea area, with bucket-ladder maritime
dredgers – dredging capability to 22 m depth; maritime dump barges with 940 c.m. capacity; river dump barges
(with gates) with 200 c.m capacity

Undercrossing of the Danube River with


Ø 1200 mm Natural Gas Transmission
Line length of 1250 m
in Isaccea area

Pulling head of Ø 1200 mm


natural gas transmission line
Offshore natural gas pipeline installation

Fitting with floats and launching into the open sea up to the offshore site by meaning of tugboats.
Side booms were used in order to move the pipe sections from the shore to the Black Sea.
Buried pipeline installation

Horizontal drilling tool


Gas drying plant

Oil and gas terminal – OMV Petrom (location – Midia Navodari)


Gas compressors - OMV - Petrom

Manufacturing & loading of offshore


jacket
Overcrossing of Buzau river

Pedestrian bridge with pier Mamaia


Mild hydrocracking plant -
Rominserv S.A.
Offshore flare
Undercrossing of Danube – Black Sea Channel
Baza de conducte submarine Midia
Caraiman warehouse and mechanical workshop

Caraiman Warehouse
Podisor Knot - Electric generator cabinet for
automation room

Podisor Knot - PM F2 Corbu Area

Podisor Knot - Interlinking


Pipe insulation – LeNAG Project

Compressors overview - LeNAG Project

Crane column mounting on structure


foundation - LeNAG Project
Assembly of mezzanine structure - LeNAG Project

Pressurized habitat – LeNAG Project

Mezzanine structure and pressurized


habitats - LeNAG Project