1. INTRODUCTION OF THE PROJECT
2. OVERVIEW
3. PROJECT GOALS
4. STAGES OF THE STRETCH
5. PROJECT TEAM & CLIENT
6. COST ESTIMATES
7. STAGES OF THE PROJECT
8. STAGES OF EXECUTION
9. CONCLUSION
2
INTRODUCTION
Source - https://www.coursehero.com/file/20456480/Group-7/ 4
PROJECT GOALS
• To improve the connectivity of the National Capital Region to improve tourist
attraction of Taj Mahal at Agra through the new 6 Lanes.
• To provide a fast moving corridor to minimize the travel time
• To connect the main townships / commercial centers on the eastern side of Yamuna
• To ensure development of adjoining area
• To relieve NH-2 which is already congested and runs through the heart of cities like
Faridabad, Ballabgarh and Palwal.
• Accelerate movement of supplies and help to affected areas during Yamuna floods
and other emergencies.
Source - https://www.coursehero.com/file/38481455/Group-2-1pptx/ 5
TEA (TAJ EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY.)
• The concept of the Yamuna Expressway which was initially conceived with the idea of
cutting down on this travel time proposes a 160 km Expressway between Greater Noida and
Agra thus reducing the travel time considerably upto 100 minutes only.
• For implementing the Yamuna Expressway Project and for development in the region, GOUP
constituted Taj Expressway Industrial Development Authority (TEA) 24th April, 2001, under
U.P. Industrial Area Development Act, 1976.
• The main responsibilities of TEA, inter alia, included :
✓ Execution of Yamuna Expressway.
✓ Acquisition of land for construction of Expressway and area development.
✓ Preparation of Zonal plan/Master plan for planned development along the Expressway.
✓ Development of drainage, feeder roads, electrification and other facilities in the area.
Source - https://www.roadtraffic-technology.com/projects/yamunaexpressway/ 6
STAGES OF THE PROJECT
2001 2007
Announcement of project, formerly known as Taj Project renamed as Yamuna Expressway, construction
Expressway. commenced.
2003 2012
Source - https://www.ibef.org/industry/infrastructure-sector-india/showcase/yamuna-
expressway 7
STAGES OF CONSTRUCTION
PHASE - 1 PHASE - 3
Expressway Stretch between Greater Noida & proposed Taj Expressway Stretch between intermediate destination & Agra.
International Aviation Hub (near village Jewar on the southern tip of
Dist. Gautam Budh Nagar).
PHASE - 2
9
YAMUNA EXPRESSWAY
Infractructure
Legal And Finance Road Engineering
Development
EXECUTION
Road Framework Food court,
Licensing and
restrooms, petrol
Permits
pumps Construction
Testing Operation
10
CONTRACTORS
Source -https://circ.in/economic-regulatory-issues/er-case-study-06/ 11
• Number of structures
STRUCTURES QUANTITY
Interchange 6 Nos.
Main Toll Plaza 3 Nos (32 lanes at each location, extendable up
to 52 lanes)
Ramp Plaza 8 Nos
Vehicular Underpass 70 Nos
Minor Bridge 41 Nos
Cart Track Crossing 76 Nos
Culvert 183 Nos
Source - http://yamunaexpresswayauthority.com/ewaysf.html 12
COST ESTIMATE
• The total cost for the completion of the project was estimated to be
9739.29 crores.
• Once the expressway was constructed the final cost went up to
13000 crores.
• The cost escalated over the years due to several delays and issues of
land acquisition and compensation.
• The cost was received as debt from various banks like ICICI Bank and
Axis Bank with a concession period of 36 years.
Source - http://www.legalservicesindia.com/article/1455/Study-of-Contractual-Documents-Involved-In-Yamuna-Expressway-Project.html 13
• Major raw materials consumed
MATERIALS QUANTITY
Cement 12 Lac Tonnes
Steel 1.3 Lac Tonnes
Stone aggregate 130 Lac Tonnes
Admixtures 12.5000 Tonnes
Bitumen 7.500 Tonnes
• Landscaping
LANDSCAPING QUANTITY
Shrubs planted 5 Lac (approx.)
Trees planted 5 Lac (approx.)
Grass planted 62.70 Lac sq.m
Source - http://yamunaexpresswayauthority.com/ewaysf.html 14
RESPONSIBILITY ASSIGNMENT MATRIX
Source - https://www.roadtraffic-technology.com/projects/yamunaexpressway/ 15
Designer /
WBS Activities Project Manager State Authority Inspector Subs
Engineer
Design package CI AI RA I
City permit/
CI AI I RA I
inspection
Demolition CI AI C R
Procurement of
CI AI R R
materials
Mechanical CI AI CI RC R
Plumbing CI AI RC R
Countertops CI AI I RC R
Electrical CI AI CI RC R
Paint CI AI I RC R
Flooring CI AI I RC R
Installation of
CI AI CI RC R
applications
16
CONCLUSION
The Yamuna Expressway project ultimately
turned out to be a success.
As planned the expressway is generating high
revenue with a regular flow of tourists and with
infrastructure such as Universities, Cricket
stadium, etc. coming up, the traffic flow will
only increase.
17
THANK YOU