INTRODUCTION

Project : Yamuna Expressway


Client : Private
Funded by : M/s Jaypee Ventures Limited
Sector : Highways

Length : 165 KMs.

Sample Footer Text Source - http://ictonline.com/Projectpage.aspx?Id=3 3


OVERVIEW
The Yamuna Expressway Project, was formally
inaugurated on 09 Aug, 2012 by the Uttar
Pradesh Chief Minister Mr Akhilesh Yadav and
thrown open to the public.
The expressway starts from Greater Noida and
ends at Kuberpur on NH 2 towards Kanpur and
Agra.
In addition, a total of 13 service roads of about 168 km have been built for local
commuters to access the expressway.

Source - https://www.coursehero.com/file/20456480/Group-7/ 4
PROJECT GOALS
• To improve the connectivity of the National Capital Region to improve tourist
attraction of Taj Mahal at Agra through the new 6 Lanes.
• To provide a fast moving corridor to minimize the travel time
• To connect the main townships / commercial centers on the eastern side of Yamuna
• To ensure development of adjoining area
• To relieve NH-2 which is already congested and runs through the heart of cities like
Faridabad, Ballabgarh and Palwal.
• Accelerate movement of supplies and help to affected areas during Yamuna floods
and other emergencies.

Source - https://www.coursehero.com/file/38481455/Group-2-1pptx/ 5
TEA (TAJ EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY.)
• The concept of the Yamuna Expressway which was initially conceived with the idea of
cutting down on this travel time proposes a 160 km Expressway between Greater Noida and
Agra thus reducing the travel time considerably upto 100 minutes only.
• For implementing the Yamuna Expressway Project and for development in the region, GOUP
constituted Taj Expressway Industrial Development Authority (TEA) 24th April, 2001, under
U.P. Industrial Area Development Act, 1976.
• The main responsibilities of TEA, inter alia, included :
✓ Execution of Yamuna Expressway.
✓ Acquisition of land for construction of Expressway and area development.
✓ Preparation of Zonal plan/Master plan for planned development along the Expressway.
✓ Development of drainage, feeder roads, electrification and other facilities in the area.

Source - https://www.roadtraffic-technology.com/projects/yamunaexpressway/ 6
STAGES OF THE PROJECT

2001 2007
Announcement of project, formerly known as Taj Project renamed as Yamuna Expressway, construction
Expressway. commenced.

Project was awarded to Jaypee Group. Project became operational.

2003 2012

Source - https://www.ibef.org/industry/infrastructure-sector-india/showcase/yamuna-
expressway 7
STAGES OF CONSTRUCTION

Compaction Sub base construction of road. Construction of rigid pavement

Setting of concrete Construction of bridge


8
STAGES OF THE STRETCH

PHASE - 1 PHASE - 3
Expressway Stretch between Greater Noida & proposed Taj Expressway Stretch between intermediate destination & Agra.
International Aviation Hub (near village Jewar on the southern tip of
Dist. Gautam Budh Nagar).

Expressway Stretch between proposed Taj International Aviation


Hub and an intermediate destination between proposed Taj
International Aviation Hub & Agra.

PHASE - 2

9
YAMUNA EXPRESSWAY

Infractructure
Legal And Finance Road Engineering
Development

STAGES OF PROJECT Funding


Constructing base
road
Building/Facilities
Construction

EXECUTION
Road Framework Food court,
Licensing and
restrooms, petrol
Permits
pumps Construction

Toll both and


Building bridges and
Contracting Technology Safety
canals
Measures

Testing Operation

10
CONTRACTORS

• The Build Operate Transfer (BOT) Contract was awarded


to Jaiprakash Industries, later merged into Jaypee
Cement Ltd. (JCL), in 2003.
• Jaypee Cement, now known as Jaiprakash Associates
Ltd (JAL), flagship company of the Jaypee group, is an
infrastructural industrial conglomerate in India.

Source -https://circ.in/economic-regulatory-issues/er-case-study-06/ 11
• Number of structures
STRUCTURES QUANTITY
Interchange 6 Nos.
Main Toll Plaza 3 Nos (32 lanes at each location, extendable up
to 52 lanes)
Ramp Plaza 8 Nos
Vehicular Underpass 70 Nos
Minor Bridge 41 Nos
Cart Track Crossing 76 Nos
Culvert 183 Nos

Source - http://yamunaexpresswayauthority.com/ewaysf.html 12
COST ESTIMATE

• The total cost for the completion of the project was estimated to be
9739.29 crores.
• Once the expressway was constructed the final cost went up to
13000 crores.
• The cost escalated over the years due to several delays and issues of
land acquisition and compensation.
• The cost was received as debt from various banks like ICICI Bank and
Axis Bank with a concession period of 36 years.

Source - http://www.legalservicesindia.com/article/1455/Study-of-Contractual-Documents-Involved-In-Yamuna-Expressway-Project.html 13
• Major raw materials consumed
MATERIALS QUANTITY
Cement 12 Lac Tonnes
Steel 1.3 Lac Tonnes
Stone aggregate 130 Lac Tonnes
Admixtures 12.5000 Tonnes
Bitumen 7.500 Tonnes

• Landscaping
LANDSCAPING QUANTITY
Shrubs planted 5 Lac (approx.)
Trees planted 5 Lac (approx.)
Grass planted 62.70 Lac sq.m

Source - http://yamunaexpresswayauthority.com/ewaysf.html 14
RESPONSIBILITY ASSIGNMENT MATRIX

• The Responsibility Assignment Matrix is a key component of completing a project


successfully. It identifies the role each person plays and what they are accountable for.
• The responsibility assignment matrix for YAMUNA EXPRESSWAY is done using RACI
format.
➢ R- Responsibility
➢ A-Accountable
➢ C-Consulted
➢ I-Informed

Source - https://www.roadtraffic-technology.com/projects/yamunaexpressway/ 15
Designer /
WBS Activities Project Manager State Authority Inspector Subs
Engineer

Plan and design CI AI RA I I

Design package CI AI RA I

City permit/
CI AI I RA I
inspection

Demolition CI AI C R
Procurement of
CI AI R R
materials
Mechanical CI AI CI RC R

Plumbing CI AI RC R

Countertops CI AI I RC R

Electrical CI AI CI RC R

Paint CI AI I RC R

Flooring CI AI I RC R
Installation of
CI AI CI RC R
applications

16
CONCLUSION
The Yamuna Expressway project ultimately
turned out to be a success.
As planned the expressway is generating high
revenue with a regular flow of tourists and with
infrastructure such as Universities, Cricket
stadium, etc. coming up, the traffic flow will
only increase.