PRE-COMMISSIONING

INSPECTION FORM
Al-AJEAL OIL
SERVICES

CLIENT GENEST MODEL 

ENG, S/NO PRE. COMM. DATE

KVA/KW MODE OF OPERATION


ENGINE
Item Description of Inspection/Pre-Commissioning Yes No Remarks
1 Exhaust pipe flange seals/traps/Exhaust flexible bellow
2 Check all water connecting hoses are properly secure & kink
3 Check all fuel, lube, bypass connecting hoses are secure & kink
4 Signs of any dents, damage or missing for air, fuel, lube filters
5 Ensure all moving parts are safely guarded
6 Check Engine label are in accordance to purchase and sales spec.
7 Signs of dent, damage, distort or missing
8 Check lube/coolent levels
9 Check for leaks (lines, gaskets, drain plug).
10 Tested the engine on load with synchronized operatiom with load
11 Any abnormal vibration or Sound during load opération.
12 Any abnormal smoke or leakage from engine.
ALTERNATOR
Item Description of Inspection/ Pre-Commissioning Yes No Remarks
1 Check Alternator guard are properly secure
2 Check Alternator label are in accordance to spec.
3 Check all connections of power and metering cables.
4 Signs of dent, damage, distort or missing
5 Any abnormal vibration or Sound during load opération.
RADIATOR
Item Description of Inspection/ Pre-Commissioning Yes No Remarks
1 Check Radiator guard are properly secure, if any
2 Signs of dent, damage, distort or missing
3 Ensure drainage point is blank off with plug
CONTROL AND SYNCHRONIZING..
Item Description of Inspection/ Pre-Commissioning Yes No Checked/Verified Ok
1 Operation of Auto/manual starting system.
2 Metering of Electrical and Mechinical measurement.
3 Battery charging/Pre-heating status.
4 Synchronizing parameters and wattmeteric operation.
5 General shutdown through local and external emergency switches,
6 Operation of generator mounted moterized ACB on Auto and
7 Test of remote starting order on Auto through ATS panel.
GENERAL
Item Description of Inspection/ Pre-Commissioning Yes No Checked/Verified Ok
1 Panel, Instruments, Gauges scales are appropriate
2 Tidyness & cleanliness of components.
3 Paint work (touch-up in necessary)
4 Starting and cranking order,
5 Synchronizing and sequence of load shearing on AUTO.