Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ABBREVIATION

REPUBLIC OF THE PHILIPPINES


& AND

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS <


@
CL
ANGLE
AT
CENTER LINE

QUEZON III DISTRICT ENGINEERING OFFICE


/
O DIAMETER OR ROUND
O DEGREES
# NUMBER
PL PROPERTY LINE
AFF ABOVE FINISH FLOOR
APPROX. APPROXIMATE
CATANAUAN, QUEZON ARCH.
BLDG.
B.O.
ARCHITECTURAL
BUILDING
BOTTOM OF
BOT. BOTTOM
C.H. COUNTER HEIGHT
CLO. CLOSET
COL. COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
CTR. CENTER
D DRIER
DIM. DIMENSION
DN. DOWN
DWG. DRAWING
E.J. EXPANSION JOINT
EL. ELEVATION
ELEC. ELECTRICAL
ELEV. ELEVATOR
EOS EDGE OF SLAB
FIN. FINISH
FCL FINISH CEILING LINE
FFL FINISH FLOOR LINE
FLR. FLOOR
FO FACE OF
GA. GAUGE
GALV. GALVANIZED
HR. HOUR
I.D. INSIDE DIAMETER
JT. JOINT
MAX. MAXIMUM
M.M. MILLIMETER
MIN. MINIMUM
MECH. MECHANICAL
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
N NORTH
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER (DIM.)
OPP. OPPOSITE
S SOUTH
MALICBOY SCHED. SCHEDULE
SIM. SIMILAR
TO ATIMONAN

GUITONG
STL. STEEL
TO PAGBILAO SIPA T&B TOILET & BATH
TEL. TELEPHONE
TO GUMACA

HINGUIN T.O. TOP OF


TYP. TYPICAL
PADRE BURGOS U.N.O. UNLESS NOTED OTHERWISE
MARAO
SUMMIT V.I.F. VERIFY IN FIELD
KINAGUNAN W WEST, WIDTH, WIDE

PERSPECTIVE
AGDANGAN PANAON AMONTAY W/ WITH
KALILAYAN WM WASHING MACHINE
UNISAN CAIGDAL RIZAL POTOTANIN
GANGAHIN
1
TO LOPEZ

POCTOL
PITOGO PACATIN PINAGBAYANAN
MACALELON
SAN VICENTE MAGALLANES DELA PAZ
RA A-1
BATABAT
BAGONG SILANG
G 1:1
AY
TAGUIN LILUKIN
OLONGTAO

SAN IGNACIO
MALAYA
SAN PABLO SUHA
CATULIN BUENAVISTA GU
LP
RIZAL SAN DIEGO
SAN JOSE STA. MARIA MILAGROSA
MALIGAYA
GEN. LUNA ILA. DOONGAN
SAN VICENTE

SAN ISIDRO PIDAC


CANCULAJAO
NAVITAS
SAN ROQUE
ANUSAN
BUKAL
GENERAL NOTES
SAN ISIDRO
DAHICAN CAWAYANIN SAN JOSE ANYAO
BACONG MAGUITING
BOLO
1. ALL DIMENSIONS SHALL HAVE PREFERENCE OVER SCALE.
TAYABAS BAY
TAGBAKAN ILA.
M.SABANG SIL. CATANAUAN BURGOS
N CAMANDISON
PACABIT
CAMANDISON CALWIT SABIT 2. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD
M.SABANG KAN. MADULAO
MAGSAYSAY CAMBUGA
LAKDAYAN
SAN NARCISO BEFORE PROCEEDING WITH THE WORK.
SAN ANTONIO PALA BUENAVISTA

ANDRES BONIFACIO
RIZAL
3. THE OWNER AND THE ARCHITECT SHALL BE NOTIFIED
NW NE
OF ANY CORRECTIONS.
THIS SITE
SAN JUAN
MULANAY BINAY
4. WHERE DISCREPANCIES EXIST BETWEEN DRAWINGS OF
BRGY. CAWAYANIN IBABA,
VIGO
W E BOTANIOG
AMOGUIS WHITE CLIFF
PUNTA
VARIOUS TRADES, ARCHITECTURAL DRAWINGS SHALL
SAN ISIDRO
GENERALLY BE ASSUMED TO GOVERN. CONSULT
CATANAUAN, QUEZON
BUENAVISTA
F.NANADIEGO VILLA REYES PUGSO POINT
SE CANUYEP PAKIING THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
SW ILA.YUNI
VIGO CENTRAL
MATATAJA
5. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO
ILA. TAYUMAN
TALA
THOSE DETAILS WITH SPECIFIC DIMENSIONS, WHEREIN
IBA. TAYUMAN

S CAWAYAN I
DESIGN INTENT CAN BE DETERMINED. CONSULT THE
ARCHITECT BEFORE PROCEEDING WITH THE WORK.
SAN FRANCISCO
M
O ALIBIHABAN 6. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES
M
INABUAN
CAMFLORA
AND GOVERNING AUTHORITIES AND SHALL BE OF BEST
PO SILONGIN
PRACTICE OF EACH TRADE.
G CASAY SAN ANDRES
PA DON JUAN VERCELOS

SS BUTANGUIAD FISH PORT

PUGON

DISTRICT MAP
PANSOY
NASALAAN

PAGSANGAHAN MANGERO

3 TALISAY

A-1
1:1

SIBUYAN SEA

AGENCY PROJECT TITLE: SHEET CONTENTS: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHT.SET: SHT.NO:

CONSTRUCTION OF
REPUBLIC OF THE PHILIPPINES MULTI - PURPOSE BUILDING AS SHOWN
A

25/11/2021 2:29:58 pm
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS CONCURRED BY:
1
QUEZON 3RD ENGINEERING DISTRICT REGION 4A
OFFICE OF DISTRICT ENGINEER ALMA JANE F. GOZO OLIVER P. FORNESTE FERDINAND Y. RICABLANCA MICHAEL P. ROSARIA JORGE C. PASIA
PROJECT LOCATION: BRGY. CAWAYANIN IBABA, CATANAUAN, QUEZON ARCHITECT II, PLANNING & ENGINEER II, PLANNING & CHIEF, PLANNING & OIC-ASSISTANT
CATANAUAN, QUEZON END USER AUTHORIZED REPRESENTAIVE DESIGN SECTION DESIGN SECTION DESIGN SECTION DISTRICT ENGINEER
OIC-DISTRICT ENGINEER
SCALE: AS INDICATED

You might also like