Professional Documents
Culture Documents
ITP For Concrete Paving Work
ITP For Concrete Paving Work
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 1 of 16
No Part of this document or the information it contains may be reproduced or transmitted in any
form or by any means electronic or mechanical, including photocopying, recording, or by any
information storage and retrieval system, without permission in writing from SABIC or NCC
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 2 of 16
TABLE OF CONTENTS
5.0 Checklist-Backfill/Compaction 9
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
SABIC Approved
Vendor List
SES-B51-S01 Approved Material
1.1 Concrete, steel, filler board, sealant etc. Approved Document Approved Document I W R
SES-C04-S01 Data Submittal
SES-B51-S01
SES-C04-S01
1.3 Material Receiving Inspection As per inspection items IFC Drawings Manufacture CV-MRI-1 I W R
Doc No EPM-ITP-BC-006
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
Compliance
Certificate, Material
in the Checklist of QVD
Receiving
Inspection Report
2 Paving Works
SES C02-S01
As per inspection items SES C02-S01
.2.1 Survey & Excavation Works SES C04-S01 CV-003-1 I W W
in the Checklist of QVD SES C04-S01
IFC Drawings
SES-C02-S01 CV-003-2,
Subgrade Material Filling / Compaction As per inspection items SES-C02-S01
2.2 SES-C04-S01 CV-003-3 I W W
Tests in the Checklist of QVD SES-C04-S01
IFC Drawings Lab Test Report
CV-003-2,
As per inspection items SES C02-S01
2.3 Base Course Material /Compaction Test SES C02-S01 CV-003-3 I W W
in the Checklist of QVD IFC Drawings
Lab Test Report
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
6 SES-B51-S01,
As per inspection items SES-B51-S01
Embedded Item SES-B53-F01 CV-003-4 I W W
in the Checklist of QVD SES-B53-F01
IFC Drawings
B
As per inspection items SES-B51-S01
7 Release for Concrete Pouring SES-B51-S01 CV-003-4 I W W
in the Checklist of QVD IFC Drawings
SES B51-S01
SES B51-S01
11 Compressive strength of Concrete Concrete Strength Approved Mix Lab Test Report I W W
Approved Mix Design
Design
SES-B51-S01
SES-B51-S01
Joint Sealer & Expansion Joint Filler, As per inspection items SES-C01-F01-03
12 SES-C01-F01-03 &04 CV-003-8 I W SW
Coating & Sealing Applications in the Checklist of QVD &04
SES-B53-F01
SES-B53-F01
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristic Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
&04
SES-B53-F01 SES-B53-F01
SES-C04-S01 SES-C04-S01
IFC Drawings
Legend
(1) ‘Prepared by’ should be the name, signature and COMPANY’s name for the Vendor’s/Sub-Contractor’s representative.
(2) ‘Approved by’ should be the name, signature and COMPANY’s name for the CONTRACTOR’s representative.
(3) ‘Location’, ‘Item Name’ and ‘Tag Number’ shall be used if applicable.
(4) ‘Characteristics Verified’ are the parameters checked during the inspection activity.
(5) ‘Reference Document’ is the Project Specification / Code / Standard / Drawing, Procedure etc. on the basis of which inspection shall be conducted.
(6) ‘Acceptance Criteria’ is the tolerance, reading, value or an outcome derived from reference documents.
(7) ‘Verifying Document’ is the record generated during inspection & Testing using approved forms / checklists.
(8) ‘Inspection Responsibility’ is the role of Vendor / Sub-Contractor, CONTRACTOR and COMPANY for each inspection step. Inspection responsibility shall be ‘I’ for Inspection, ‘R’ for review, ‘A’ for approval, ‘S’ for
Surveillance, “W’ for 100% Witness, ‘SW’ for random witness and ‘H’ for hold.
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 6 of 16
2 Supplier
□ Satisfied
5 Visual Inspection
□ Unsatisfied
6 Remarks
Submitted by:
Review and approval Status:
□ (A) Approved without comments.
□ (B) Approved with comments.
□ (C) Disapproved.
Comments:
Name
Signature
Date
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 7 of 16
CV-003-1
FIELD SURVEY FOR EXCAVATION Record
No
Date
Project No: SP-173100119 Area No.
IBB/SAFCO
Location
Description
Point Coordinate
Remark
No. N E
Name
Signature
Date
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 8 of 16
1.1 Material
1.2 Compaction
1.3 Preparation
2.1 Equipment
2.3 Compaction
2.4 Material
NOTES :
Name
Signature
Date
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 9 of 16
5.0 Checklist-Backfill/Compaction
CV-003-3
BACKFILL/COMPACTION CHECKLIST Record No
Date
Project No SP-173100119 Area No.
Material Type Drawing No.
Compaction Optimum
Equipment Moisture
Field Test
Proctor Density
Equipment
Location IBB/SAFCO
Description
Examination Items Result Examination Items Result
Keep cleaning without Satisfied
Satisfied
water, roots, trash, other Fill material test Reports filed Unsatisfied
Unsatisfied
foreign materials N/A
Satisfied Satisfied
Coating protection filler
Unsatisfied Properly moistened before placing Unsatisfied
board installed properly
N/A N/A
Satisfied
Material comply with ≧90%
Unsatisfied Compacted Density
specification ≧95%
N/A
Bottom Bed/Backfill Depth 200 mm Total Layer of Compaction 2
Layer Density Test (Points)
Laye Thick Repor 1st 2nd 3rd 4th 5th 6th 7th 8th 9th
Result
r No. (mm) t No. Densit Densit Densit Densit Densit Densit Densit Densit Density
y y y y y y y y
1 Sat. Unsat.
2 Sat. Unsat.
3 Sat. Unsat.
4 Sat. Unsat.
5 Sat. Unsat.
6 Sat. Unsat.
7 Sat. Unsat.
8 Sat. Unsat.
9 Sat. Unsat.
10 Sat. Unsat.
Name
Signature
Date
EPM-ITP-BC-
Doc No 006
SAFCO/IBB MOBILE COATING
Rev. No. 00
UNIT POJECT
ITP FOR CONCRETE PAVING WORK Date 25th Jun, 2020
Page 10 of 16
C. Reinforcement
Grade
Size/Type
Spacing/Splices
Spacers
Tying every intersection of rebars
Clearance
Inspection Results
Item Description of Check Sub Cont. NCC
Yes No Yes No
1.0 Concrete Delivery
1.1 Sub-contractor ready to place
1.2 Delivery ticket correctly completed
1.3 Correct mix concrete received
2.0 CONCRETE TESTING
Slump test, temperature, air content and unit weight checks have been
2.1
carried out and are within the specified tolerances
2.2 Specified number test cylinders/cubes taken
3.0 CONCRETE PLACEMENT
Method of placement :
3.1
Crane and bucket Chute Pump
3.2 Pouring height maintained to avoid NCCregation
3.3 Correct size of vibrator(s) together with back-ups on location
Compaction / vibration is in accordance with the specified requirements:
3.4 - vibration carried out around reinforcement and embedment
- penetration into previous layer
4.0 CONCRETE FINISH
Brushed Hand float
4.1 Rough Power float
Steel Trowel
Remarks:
NOTES :
Sub-Contractor NCC PMT
Name
Signature
Date
Note: Verify delivery ticket and attach the relevant fresh concrete placement log to this form
Doc No EPM-ITP-BC-006
CV-003-7
CONCRETE CURING RECORD Record No
Date
Project No SP-173100119 Area No
Location IBB/SAFCO Drawing No.
Description
Pouring Date
Curing Method WATER CURING
Curing End
Date
Curing Record
NCC Inspector
Result
No. Date Time Person of Curing/Signature
Accept Reject
CV-003-8
FINAL ACCEPTANCE OF CONCRETE PAVING WORKS Record
No
Date
Project No SP-173100119 Area No
Location
IBB/SAFCO Drawing No.
Description
Sub-contractor NCC
Description of Check Rejec
Accept Reject Accept t
1 vapor barrier as per IFC drawing and specification
Rebar/Wire mesh ( spacer, Overlaps/joints, covers
2 etc, diagonal bars at openings) as per IFC Drawing
and specification
Embedment ( smooth dowel bars, pockets, anchor
3
bolts etc.) as per IFC drawing and specification
Construction joints, expansion joints and isolation
4
joints as per IFC drawing and specification
5 Concrete mix design as per specification
Concrete pouring and finishing as per IFC drawing
6
and specification
7 Finish surface smoothness and free from cracks
9 Properly cured
Comments:
Name
Signature
Date