Itp For Gravel Surfacing and Dust Prevention
Doc No
SAFCO/IBB MOBILE COATING 001
UNIT PROJECT Rev. No. 00
ITP FOR GAVEL SURFACING AND DUST
Date 25th Jun, 2020
PREVENTION
Page 1 of 6
No Part of this document or the information it contains may be reproduced or transmitted in any
form or by any means electronic or mechanical, including photocopying, recording, or by any
information storage and retrieval system, without permission in writing from SABIC or NCC
EPM-ITP-PC-
Doc No
SAFCO/IBB MOBILE COATING 001
UNIT PROJECT Rev. No. 02
ITP FOR GAVEL SURFACING AND DUST
Date 25th Jun, 2020
PREVENTION
Page 2 of 8
TABLE OF CONTENTS
Inspection Responsibility
Sr. Acceptance Verifying Sub-
Inspection Activity Characteristics Verified (4) Reference Document (5)
No Criteria (6) Document (7) Contractor CONTRACTOR COMPANY
/Vendor
As per inspection items SES C02-S01, SES-C02- SES C02-S01, SES- CV-004-2
2.2 Sub-grade/compaction/FDT H R
in the Checklist of QVD S02 C02-S02 Third Party Report
3 Surfacing
As per inspection items IFC Drawing IFC Drawing
3.1 Gravel Laying/Thickness CV-004-1 H W
in the Checklist of QVD SES-C02-F02 SES-C02-F02
SES-C02-F02 SES-C02-F02
As per inspection items
4 Final Acceptance SES C02-S02 SES C02-S02 CV-004-3 H H
in the Checklist of QVD
IFC DRAWING IFC DRAWING
Legend:
(1) ‘Prepared by’ should be the name, signature and COMPANY’s name for the Vendor’s/Sub-Contractor’s representative.
Doc No EPM-ITP-PC-001
(2) ‘Approved by’ should be the name, signature and COMPANY’s name for the CONTRACTOR’s representative.
(3) ‘Location’, ‘Item Name’ and ‘Tag Number’ shall be used if applicable.
(4) ‘Characteristics Verified’ are the parameters checked during the inspection activity.
(5) ‘Reference Document’ is the Project Specification / Code / Standard / Drawing, Procedure etc. on the basis of which inspection shall be conducted.
(6) ‘Acceptance Criteria’ is the tolerance, reading, value or an outcome derived from reference documents.
(7) ‘Verifying Document’ is the record generated during inspection & Testing using approved forms / checklists.
(8) ‘Inspection Responsibility’ is the role of Vendor / Sub-Contractor, CONTRACTOR and COMPANY for each inspection step. Inspection responsibility shall be ‘I’ for Inspection, ‘R’ for review, ‘A’ for approval, ‘S’ for
Surveillance, “W’ for 100% Witness, ‘SW’ for random witness and ‘H’ for hold.
EPM-ITP-PC-
Doc No
SAFCO/IBB MOBILE COATING 001
UNIT PROJECT Rev. No. 00
ITP FOR GAVEL SURFACING AND DUST
Date 25th Jun, 2020
PREVENTION
Page 4 of 6
CV-004-1
GRAVEL SURFACING AND DUST PREVENTION CHECK Record
LIST No
Date
Location Drawing
Description IBB/SAFCO No.
Test Reports
Note:
Company
Name
Signature
Date
EPM-ITP-PC-
Doc No
SAFCO/IBB MOBILE COATING 001
UNIT PROJECT Rev. No. 00
ITP FOR GAVEL SURFACING AND DUST
Date 25th Jun, 2020
PREVENTION
Page 4 of 6
CV-004-2
Record.N
BACKFILL/COMPACTION CHECKLIST o
Date
Project No SP-173100119 Area No.
Material Type Drawing No.
Compaction Equipment Optimum Moisture
Field Test Equipment Proctor Density
Location IBB/SAFCO
Description
Examination Items Result Examination Items Result
Keep cleaning without water, Satisfied Satisfied
roots, trash, other foreign Unsatisfied Fill material test Reports filed Unsatisfied
materials N/A
Satisfied Satisfied
Coating protection applied Unsatisfied Properly moistened before placing Unsatisfied
properly N/A N/A
Satisfied
Material comply with ≧90%
Unsatisfied Compacted Density
specification ≧95%
N/A
Bottom Bed/Backfill Depth mm Total Layer of Compaction
Layer Density Test (Points)
Layer Thick 1st 2nd 3rd 4th 5th 6th 7th 8th 9th
Report No. Result
No. (mm) Densit Density Density Density Density Density Density Density Density
y
Sat.
1 Unsat.
Sat.
2 Unsat.
Sat.
3 Unsat.
Sat.
4 Unsat.
Sat.
5 Unsat.
Sat.
6 Unsat.
Sat.
7 Unsat.
Sat.
8 Unsat.
Sat.
9 Unsat.
Sat.
10 Unsat.
Subcontractor NCC E&PM
Company
Name
Signature
Date
EPM-ITP-PC-
Doc No
SAFCO/IBB MOBILE COATING 001
UNIT PROJECT Rev. No. 00
ITP FOR GAVEL SURFACING AND DUST
Date 25th Jun, 2020
PREVENTION
Page 4 of 6
CV-004-3
FINAL ACCEPTANCE FOR GRAVEL Record
SURFACING AND DUST PREVENTION No
Date
Project No SP-173100119 Area No
Location Drawing
Description IBB/SAFCO No.
Subcontractor NCC
Description of Check
Accept Reject Accept Reject
1. Gavel Finish as per requirement
2. Compaction checked
4. Appearance is acceptable
Comments:
Name
Signature
Date