Professional Documents
Culture Documents
Istek Presentation 2019
Istek Presentation 2019
ENGINEERING AND DESIGN
CHEMICAL PLANT
PROCESSING FACILITY
PIPELINE
REFINERY
TERMINAL AND STORAGE FACILITY
POWER PLANT
MARINE LOAD OUT FACILITY
OIL AND GAS
INFRASTRUCTURE AND SUPERSTRUCTURE CONSTRUCTION
FABRICATION FACILITY
MAJOR BUSINESS AREAS
Refineries Oil & Gas Pipelines Petrochemical USG’s Power Plants Storage Tanks
Platforms Complexes
CONTRACTING GROUP
EPC Turnkey Delivery
Turnkey Construction
• EPC (also commissioning, start-up,
operational support & training) • Lump sum turnkey
• EPC-F • Construction
• EPCM • Contracts
Eagean Sea
Caspian
Sea
Ceyhan Steel
Structure Adana
Fabrication Plant
Mersin
Antakya
Mediterranean
Proximity to the highways & railways and ports, for
receipt of raw materials as well as delivery of
fabricated items.
ISTEK CONSTRUCTION
CATEGORY 1 LICENSE
DESIGN AND
CONSTRUCTION
HUMAN & NATURE;
WE TUNE INTO
BOTH...
To eliminate the damages which may effect our employees, clients, third persons, property
and environment stands as a major principle that we strictly follow. Therefore we ensure the
participation of our employees in sharing and understanding the HSE-Q/Health, Safety,
Environment and Quality responsibility and awareness, at all corporate levels.
IN SAFETY –
10 000 000
MAN HOURS AND
20 000 000
KM WITHOUT LTI
RESOURSES
Manpower Histogram
Equipment
Subcontractor
WE DO NOT COMPROMISE ON QUALITY
OWN COMPREHENSIVE SET OF QUALITY PROCEDURES AS WELL AS
FOLLOWING CLIENT’S PROCEDURES
ACCESS TO QUALITY DOCUMENTS THROUGH THE COMPANY INTRANET
REGULAR INTERNAL AUDITS
deliver fulfill all the necessary standards and such as AD-2000 HP 0, TRD-100, EN ISO 3834-2
comply with all required regulations. While doing and PED 2014/68/EU certificates from TÜV, as
this, we strictly follow Occupational Health and well as ASME Code U, U2, R and S stamps and
Safety measures and strive to be environment- National Board Registration.
conscious in our business
Our aim is highly productive operation in a
state-of-the-art facility. It is only in this way,
We carry out our operations under ISO 9001:2015 that we are able to achieve excellence through
Quality Management System, ISO 14001:2015 less repair, less reprocessing, zero discarded
Environmental Management System, and OHSAS product, less customer complaint and minimum OHSAS 18001 Certificate ISO 14001 Certificate National Board R Stamp National Board AD2000-Merkblatt EN ISO 3834-2 and PED
18001:2007 Occupational Health and Safety accident, all of which are prerequisites of Authorization Certificate HP 0 and PED
Management System certifications. The company reliable products for and long-term relationship 11
was most recently awarded ISO 27001:2013 with our clients.
FABRICATION PROFILE
MAJOR PROJECTS >>>
ENGINEERING
AND DESIGN
• Static and dynamic analysis for complex structures
• Performance based design
• Earthquake engineering and time history analysis
• Assessment of existing structures and development of
• schemes for necessary strengthening
• Soil–structure integration and interface resolution
• Field engineering
PLANT & PIPING DESIGN
• Studies/preliminary concept planning and arrangement, including complex
pipes
• Dimensioning/pipe class preparation
• Basic and detail design of all piping systems
• Definition of support concepts
• Equipment and piping layout
• Materials management
• Designing special pipe components according to AD 2000,
EN 13480, ASME
• Pipe stress analysis of high temperature/pressure systems
including all steel, GRP and jacketed pipes according to
codes EN 13480, ASME B31.1, B31.3, FDBR
• 3-D modelling
• Assembly supervision and as-built documentation
• Tie-in measurement and pipe replacement
• Recording plant with laser scan and converting all available data
(equipment, pipe, instrument, etc.) into intelligent 3-D model
• Fire fighting
• HVAC
FABRICATION
FACILITY
OUR MANUFACTURING
AND INSPECTION
PROCESSES
• Cutting (oxygen, plasma,
mechanical)
• Cold forming (rolling, pressing,
flanging)
• Machining
• Drilling
• Fit-up
• Assembly
• Tube expanding
• Welding (SMAW, SAW, GMAW,
GTAW, FCAW, ESW)
• Weld overlay (SAW, ESW)
• Orbital welding
• Post-weld heat treatment (furnace
and local)
• Ultrasonic shot peening
• Surface preparation (sandblasting
and grid-blasting)
• Painting
• Pickling
• Radiographic Examination
• Ultrasonic Examination
(Conventional and TOFD/PA
Methods)
• Liquid Penetrant Examination
• Magnetic Particle Examination Almost half a century of
• Visual Examination
• Pressure Test experience in process and
• Leakage (Bubble) Test
• Positive Material Identification storage equipment
(PMI)
FACTS & FIGURES – TEKFEN MANUFACTURING & ENGINEERING
New Phosporic Acid Plant (700 ton/d ; 210,000 ton/ yr):
• Phosphate Rock Conveying and Storage
• Phosphate Rock Preparation and Grinding
• Attack and Digestion Tank
• Gas Scrubbing
• Filtration
• Weak Phosphoric Acid Settling
• Phosphoric Acid Concentration
• Concentrated Phosphoric Acid Settling
• Fluosilicic Acid Neutralisation
PROCESSING
FACILITY
SOUTH YOLOTEN GAS FIELD - PK 2 :UTILITIES
& OFFSITES, Turkmenistan
Engineering Scope :
• Permanent Buildings Construction Scope:
• Storage Tanks • Onshore Gas and Condensate Processing Plant
- Condensate Storage Tanks (2 pcs) • Power Generation
- Produced Water Storage Tank • Storage Tanks
- Off-Spec Condensate Tank • Utilities
- Open Drains Holding Tank • Telecommunications and Control Room
- Fire Water Storage Tank • Onsite Buildings
- Rich MEG & Lean MEG Tank • Onshore pipelines
• Steelwork Fabrication Drawings • Brownfield Works
Preparation (18.000 tons) • Temporary Facilities
• Temporary facilities
• All coordination and site engineering
works
BAKU – TBILISI – CEYHAN (BTC) ONSHORE TERMINAL, Turkey
POWER PLANT
AFSIN – ELBISTAN B THERMAL POWER PLANT,
Turkey
MECHANICAL
ERECTION, ALIGNMENT,
FINAL ALIGNMENT, AND
PRE-COMMISSIONING
OF:
• Construction works
• Facade works
• Steel structure works