DATE January 20, 2021

TO Ar. AJ Nacario and Engr. Clifford Tapulayan


FROM Ar. Jhennel Evangelista and Wyllden Oliver T. Uy
PROJECT Proposed Interim Office
LOCATION Sct. Madriñan St., Diliman, Quezon City
OWNER Robomatrix Technologies Inc.
SUBJECT Construction Bulletin Architectural No. 7

ITEM NO. ITEM REMARKS

ARCHITECTURAL
reflected updated door tagging for sliding doors,
added fixed windows above common toilet,
CBA 7.1 Ground Floor Plan
updated floor finish of stair enclosure to plain
cement (verify id)
Cross Section 1 Key Section reflected added fixed windows above common
CBA 7.2 toilets, updated detail of canopy above toilet,
Cross Section 1 Blow-up Section updated detail of common toilet roof

CBA 7.3 Door Schedule


preferred aluminum frame so that lightweight,
CBA 7.4 Door Schedule kindly request supplier to provide drawings for
screens - JOG recommendations included in
CBA 7.5 Door Schedule
accessories section of door schedule
Door Schedule
SLD 1a, SLD 1b, SLD 1c Typical Section
SLD 3 Typical Section added steel plate to close gap

reflected added flatbar as discussed during site


CBA 7.6 SLD 1c Section
meetings
embedded bottom track (verify supplier if they do
Sliding Doors Typical Blow-up Detail
not need bottom track anymore)
reflected added flatbar as discussed during site
SLD 1c Blow-up Detail
meetings

CBA 7.7 Window Schedule added steel plate to close gap

If you have further questions please call our office. Thank you.

Prepared by:

Wyllden Oliver T. Uy
Junior Architect

Noted by:

Ar. Jhennel Evangelistra


Supervising Architect
X1 X2 X3 X4 X5 X6 X7 X8 X9

Y1

11

Y2 1

SIDEWALK
3

Y3 4

2
1

SCT. MADRIÑAN STREET


1 5 4 3 2 1
2

Y4 2 1

SIDEWALK
7

Y5 8

11

Y6

1 GROUND FLOOR PLAN


CBA
7.1
2

1 KEY SECTION

2 BLOW-UP SECTION

CBA
7.2
1 DOOR SCHEDULE CBA
7.3
1 DOOR SCHEDULE CBA
7.4
1 DOOR SCHEDULE CBA
7.5
6

5 5 5

2 3 4

5 6

1 DOOR SCHEDULE CBA


X3 X4 X4 X5

1 WINDOW SCHEDULE

CBA
7.7