Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

1 Four Main Types of Plant Layout https://www.yourarticlelibrary.

com/industries/plant-layout/four-main-types-of-

2 What is Plant Layout? https://www.geektonight.com/plant-layout/

3 What is plant Layout-Objectives of https://educationleaves.com/what-is-plant-layout-types-of-plant-layout/

4 TYPES OF PLANT LAYOUTS https://www.engineersgallery.com/types-of-plant-layouts/

5 5 Main Types of Plant Layout | Induhttps://www.businessmanagementideas.com/industries/plant-layout/5-main-ty

6 7 Major Factors Affecting Plant La https://www.yourarticlelibrary.com/industries/7-major-factors-affecting-plant-la

7 Factors Influencing Plant Layouts https://www.mbaknol.com/operations-management/factors-influencing-plant-la

8 Pandemic is changing layout and dehttps://www.foodengineeringmag.com/articles/99000-pandemic-is-changing-lay

9 UltraTech sets new benchmarks w https://www.adityabirla.com/media/stories/ultratech-sets-new-benchmarks-wit

10 Building a Green Future: BMW Grou


https://www.press.bmwgroup.com/india/article/detail/T0309234EN/building-a-

11 Toyota Production System https://global.toyota/en/company/vision-and-philosophy/production-system/

12 How Should You Organize Manufachttps://hbr.org/1978/01/how-should-you-organize-manufacturing

13 CLASSIFICATION OF LAYOUT - P https://www.wisdomjobs.com/e-university/production-and-operations-managem

14 Ergonomics https://www.businessmanagementideas.com/industries/plant-layout/plant-layo
-layout/four-main-types-of-plant-layout/34604

pes-of-plant-layout/

ries/plant-layout/5-main-types-of-plant-layout-industries/9239

or-factors-affecting-plant-layout-industrial-management/26164

/factors-influencing-plant-layouts/

00-pandemic-is-changing-layout-and-design-of-food-plants

h-sets-new-benchmarks-with-dhar-cement-works

ail/T0309234EN/building-a-green-future:-bmw-group-plant-chennai-sets-new-benchmarks-in-sustainable-manufacturing?language=en

ophy/production-system/

manufacturing

on-and-operations-management-tutorial-295/classification-of-layout-9481.html

ries/plant-layout/plant-layout-meaning-need-and-benefits-industrial-engineering/11884
anufacturing?language=en
Factor Environment Type Controllable

1 Policies of management: Internal Organizational Yes

2 Plant location External Geographical Partial

3 Nature of the product Internal Organizational No

4 Volume of production Internal Organizational Yes

5 Availability of floor space Internal Organizational No

Nature of manufacturing
6 Internal Organizational Yes
process

Repairs and maintenance


7 of equipment and Internal Organizational Yes
machines

8 Man Factor Internal Organizational Yes

9 Material Factor Internal Organizational Yes

10 Machinery Factor Internal Organizational Yes

11 Movement Factor Internal Organizational Yes

12 Waiting Factor Internal Organizational Yes

13 Service Factor Internal Organizational Yes

14 Building Factor Internal Organizational Yes

Internal /
15 Flexibility Factor Generic Yes
External
Inference
Company before establishing business and
plant can mould their policies.
Once selected and acquired, the organization
loses control over it
It is uncontrolled when the plant is an
expansion.
Volume of production can be controlled as per
demant and plant capacity

Once available. It can not be varied.

The process can be different for various plant


for the same production

It can be modified as per requirement,


innovation & availaibility during the course of
time.

The skill set and power can be revised as per


requirement
The company policies once set can decide this
factor
The equipment canbe revisited with audits and
revised
The plant layout considers this factor to
increase the operable time and lessen the
waiting period
This demands for storage capacity in the
process
To reduce the downtime, it has to be very
specific
Considering all the above points,this point is
finally desined in such a way that there is
scope for changes always
These are the factors which can be flexed as
per the demand without changing any of the
exisitng system. e.g. Transportation system.
checksheet for floor space development or alterations

Entity
1 Scaled drawing of factory/shop floor
2 Make models of machines/equipments
3 Immovable facilities/equipments details and drawing plots
4 Entrances, exits/stairs, Assembly Points
5 Washrooms, corridors
6 Pillars, partitions
7 Air conditioning ducts, steam, air and vacuum lines
8 Power outlets, electrical lines for feed to machines
9 Electrical Panels & Equipment

10 The main flow process

11 Change Plans
12 Fianal Drawing
Purpose
Feasibility check
Axcessive information
Restrictions analysis
Feasibility check
Feasibility check
Restrictions analysis
Alterations
Alterations
Feasibility check
Best possible convenient and shortest path
development
Cocurrent check with existing process
Blueprint

You might also like