INTRODUCTION PENDAHULUAN
Regional Geology of Sumatera consist of five Geologi Regional Pulau Sumatera dapat dibagi
parts is Outer-Arc Ridge, Fore arc Basin, Back- menjadi 5 bagian yaitu Punggungan Busur
Arc Basin, Mountain Range and Intra-Arc Luar Sunda, Cekungan Busur Depan Sunda,
Basin. The potential area is located in Cekungan Busur Belakang Sumatra, Bukit
Bengkulu Province which produces several Barisan dan Cekungan Antar Busur Sumatra.
volcanic activities with potential geothermal Daerah potensi Geothermal Provinsi
system association with Pull-apart basin Bengkulu menghasilkan beberapa aktivitas
volcano-tectonic control by Sumatera Faults vulkanik sebagai potensi sistem geothermal
System. There are lot of geothermal yang berasosiasi dengan cekungan tektonik
manifestation such as fumarole, mud pool, dikontrol oleh sistem sesar Sumatera
hot spring, steam heated, wide spread sehingga menghasilkan manifestasi
alteration. Conclusively GGG survey (Geology, Geothermal seperti fumarole, kolam lumpur,
Geochemical, Geophysical survey) had already air panas, uap, alterasi batuan berdasarkan
done by Pertamina Geothermal Energy and GGG (Geologi, Geokimia, Geofisika survei)
Geology Agency, Energy Mineral Resources yang telah dilakukan oleh Pertamina
Ministry. Geothermal Energi dan Badan Geologi
Kementerian Energi Sumber Daya Mineral.
Figure 1. Regional Geology of Sumatera related geothermal system association with pull-
apart basin volcano tectonic system with control by Sumatera Faults System.
WKP HULU LAIS WKP HULU LAIS
The WKP Hululais geothermal field is situated WKP Panas bumi Hululais terletak sekitar 80
about 80 km north of Bengkulu City Sumatra km ke utara Kota Bengkulu dan memiliki
and has a geothermal area 289.300 km2 daerah panas bumi luas 289.300 km2. Terdiri
conssist three potential field as Gendang Hulu dari tiga lapangan potensial seperti Gendang
Lais, Bukit Daun, Tambang Sawah with license Hulu lais, Bukit Daun, Tambang Sawah sesuai
SK number 2067K/30/MEM/2012 18 October dengan SK Wilayah Kerja Panas Bumi nomor
2012 to Pertamina Geothermal Energy. 2067K/30/MEM/2012 tanggal 18 Oktober
Pertamina Geothermal Energy has conducted 2012 Kepada PT. Pertamina Geothermal
well production test in Hulu Lais, Bukit Daun Energi. Pertamina Geothermal Energy telah
and the well succesfully discharged melakukan uji produksi di lapangan hulu lais,
geothermal fluid. bukit daun dan mendapatkan potensi panas
bumi.
TAMBANG SAWAH
HULU LAIS
Figure 2. Overview WKP Hulu Lais Red line consist potensial field Bukit Daun, Hulu Lais ,
Tambang Sawah
I.HULU LAIS PROJECT I.HULU LAIS PROYEK
Geothermal Resources Hulu Lais Sumberdaya Panas Bumi Hulu Lais
Quarternary volcanic rock deposit mainly Batuan kuarter vulkanik utama merupakan
cover Geothermal Prospect Area of Hululais Daerah Prospek Panas Bumi Hululais dan
and surrounding. Hululais Andesite and Lumut sekitarnya. Seperti Andesit Hululais dan
formation (pleistocene age) area common Formasi Lumut (umur pleistocene) singkapan
outcrops appear in the prospecting area while batuan ini memiliki potensi manifestasi
manifestations such as fumarole, mud pool, seperti fumarol, kolam lumpur, air panas yang
hot spring come to surface trough fractures in keluar melalui rekahan dari formasi batuan.
this formation. Basement rocks predicted Batuan basement diprediksi berupa batuan
sedimentary rocks where outcrop indentified sedimen di mana singkapan diidentifikasi di
outside boundary area. Granite and luar area. Intrusi granit dan granodiorit
granodiorite intrusion fragmentals have light memiliki warna putih terang yang tersebar di
white colors spread around and could be as sekitarnya menjadi sumber panas untuk panas
heat source for geothermal Hululais. bumi Hululais. Sumber Daya Panas Bumi dari
Geothermal Resources from Geologi, Survey Geologi, Geokimia, Geofisika Gendang
Geokimia B. Gendang Hulu Lais field Hulu Lais sumber daya hipotetik sebesar 150
hypothetic resources 150 MWe, Probable MWe, cadangan terduga 250 MWe, cadangan
reserves 250 MWe, Possible reserves 180 mungkin 180 MWe.
MWe.
Conceptual of Geothermal Model Hulu Lais Konsep Model Panas Bumi Hulu Lais
Konsep model panas bumi Hululais
Hululais Conceptual Geothermal Model was
didasarkan pada banyak parameter yang
based on many parameters supporting likes
mendukung distribusi manifestasi, fumarole,
distribution of manifestation, fumarole, hot
air panas, kolam lumpur, batuan alterasi,
springs, mudpool, altered rocks, productive
rekahan produktif dalam patahan, arah aliran
fractures in fault plan, fluid trending flow,
fluida, suhu tinggi bawah permukaan (200-
subsurface high temperature ( 200-300 ℃),
300 ℃), zona permeabilitas tinggi dan tidak
high permeability zone and clearly resisitivy
ada lapisan resisitivitas.
layers.
Pemodelan aliran fluida hidrotermal untuk
Modeling of hydrothermal fluid flowing
konsep pemodelan panas bumi sangat
mechanism for geothermal modelling concept
diperlukan. Desain model panas bumi
is needed. The geothermal model design was
didasarkan pada data GGGR yang
based on the GGGR data combining GGGR
menggabungkan sifat permukaan GGGR dan
surface dan rocks property from subsurface
batuan dari hasil pengeboran bawah
drilling. Conceptual geothermal model shows
permukaan. Model konsep panas bumi
heat source origin, fluid flow from up-flow
menunjukkan asal sumber panas, aliran fluida
zone to out-flow zone, temperature
dari zona aliran atas ke zona out-flow,
distribution, gasses component, fractures
distribusi temperatur, komponen gas,
distribution, fault dipping, surface view of
distribusi rekahan, manifestasi panas bumi,
geothermal manifestations, well pad location,
lokasi pad sumur, area resapan cairan dan
fluid recharge area and fluid sources,
sumber fluida, batuan reservoir, batuan
reservoir rocks, over burden and clay cup. The
penutup dan lempung. Model panas bumi
model of geothermal system related to
Hulu Lais juga berhubungan dengan system
volcanic system.
vulkanik.
Calculation of resources Potential Hulu Lais Perhitungan Potensi Sumberdaya Hulu Lais
Exploration drilling phase geothermal field Pengeboran Eksplorasi panas bumi telah
total 19 hole from wellpad cluster with total dilakukan sebanyak 19 sumur yang tersebar di
geothermal reserves estimation total 79 MWe beberapa cluster pengeboran dengan
perhitungan sementara estimasi cadangan
total 79 MWe
Potential to be development field Project Peluang pengembangan Proyek
The development to maximum area Pengembangan ke maksimum area
extents is of reservoir within ranges from potensi reservoar panas bami di range
25 km2 to 45 km2. 25km2 ke 45 km2.
Field development strategy to the plan Strategi pengembangan lapangan
drilling production, injection target untuk perencanaan pemboran
To develop Power generation capacity produksi, pemboran injeksi
scenario 110 Mw until waiting legal Pengembangan untuk pembangkit
permit PLTP for PLN to loan agreement, dengan rencana scenario 110 Mwe
tender, EPCC, tender, send contract and yang masih menunggu izin lingkungan
start building. untuk PLTP kepada PLN agar lanjut ke
loan agreement, lelang, EPCC, kontrak
untuk pembangkit PLTP.
Fluid supply comes from catchment areas Suplai fluida berasal dari daerah resapan yang
from the Mount of Kaba and also from berasal dari lereng Gunung Kaba dan juga dari
outside the Kaba complex. daerah luar komplek Kaba.