Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

NOTES:

0.06re
GENERAL · USEFUL SURFACE AREAS MAY VARY WHILE THE WORK IS BEING CARRIED OUT
CONTROL
· ALL MEASUREMENTS WILL BE CHECKED ON SITE BEFORE THE WORK BEGINS. IN
PUMP ROOM
0.21re CPD PANEL
THE EVENT OF
0.01re TRANSF
ORMERS DISCREPANCIES WITH THE GRAPHICAL DOCUMENTATION PROVIDED HERE, THE
PROJECT AND SITE
MANAGER WILL BE CONSULTED

0.22re
CORRIDOR
This Project is constituted by an indivisible and coordinated group of original
documents and plans (which are open ended), graphical documentation, reports,

IN
technical and management briefs, descriptions of budget items, budgets and
measurements, the official book of orders and attendance, and the work-site book.
They must all be taken into consideration by the construction company.

Y
NC
ENTRANCE RECIDENTIAL The only valid back up for these documents are the originals duly signed and
stamped by the Architect or Engineer who has drawn them up.

GE
AR 12 AR 13 AR 15
AR 10 AR 17 IT files, verbal orders or notifications, email messages, physical and computer
AR 18

LO

ER
AR 08 R9
R13 document management system contents, printouts, photocopies, faxes or any other
AR 07 AR 19
RESIDENTIAL
kind of reproduction, as well as any original document unsigned or not stamped by
GAS LOGISTICS
GAS LOGISTICS LOGISTICS RESIDENTIAL the Architect or Engineer responsible in each case can never be considered to

EM
LIFTS (RL1) MAINTENANCE

GI
LO
EXTERIOR CYLINDER MAINTENANCE R16
AR 06 MAINTENANCE LOGISTIC AR 20
CYLINDER HAZARDOUS
GROUND STAIRS S
L GAS STORAGE MAT. MAINTENAN LOGISTIC LOGISTIC constitute part of or backup for the documentation of the Project or any part of it,
RESIDENTIA EQUIPMENT STORAGE STORAGE MAINTENANCE
BENCH (RS2) CE S MAINTEN S
R5
STAIRS HOLDING CYLINDER EMPTY
FULL STOCK GROUND MAINTENAN ANCE
STAFF AREA STORAGE RESIDENTIAL STORAGE OFFICE
CE ADMIN LOGIST whether they refer to processes, dates, or traceability.

ST
AR 05 S (RS1) STORAGE FILE OFFICE MAINT ICS AR 21
TOILET

GI
R27 R28 R29 RECORD AREA ENANCE
R3 PLANT
DIRECT STAFF
WASTE STAFF
OR TOILET
R20 All documents must be considered as part of the Project taken as a whole, and

ICS
TYPE 3 AR 01

ST
AR 01 WASTE LOCKERS AR 2 checks must be made to ensure they coordinate adequately. Moreover, checks must
AR 0
4 TYPE 2 2
WASTE LOGISTICS
TYPE 1 MAINTENAN be made on site of all the measurements, dimensions and specifications.
LOGISTICS CE R22

2.5
R1 R25 LOGISTIC
GENERAL WO S

0
ICS
MAINTENANCE RK MAINTE
AND STATION/T NANCE LOGIS
EQUIPMENT ADMIN EQUIPMENT OOLS REPAIR TICS

CONTRACTORS
SATALITE PRIVATE
AND BENCH PARTS MAINT In the event of discrepancies, omissions, or inconsistencies, the Architect or

OU
SUPPLIES CUBICLE RECEIVING ENANCE

STORAGE
OFFICE ES
R24 EQUIPEMENT ROOM PAIN R32
STORAGE Engineer must be consulted in writing. Otherwise, the documentation provided will

N
PREPAR T
E STORAGE /

WORKSTATIO
WAST

ION

STORAGE
0.07re EQUIPMENT ATION
SATELITE AR 02 be considered to be understandable and sufficient.

STORAGE
AR 02 OUS CHARGING ROOM
AH

WORKSTAT
STAFF RESID U

ACID
HAZARD SECURE
IN MATERIA
LS LOCKER R11 ENTIA

T
STORAGE L
SATELLITE
ARCHIVE
E R10 R14
WASTE STORAG RECORD /
S
RECEIVING
TREATM
ENT
REATME
POST-T EA
NT
ENT
R8 R15
S
RECID
AR TREATM
AREA RECEPT
ION 0.47n
WORKSPACE
R17
PATHOL
WASTE
OGICAL
ENTIA The Intellectual Property rights inherent to the documentation of the Project are
L

STORAGE
/ CLEARKS AR 14 HOLD.

VALUT
AREA CENTRAL AR 11 AHN 14 AR 16 ROOM

0.48n G
AHN 13 CHIEF held by the Architect or Engineer and can be employed once only, and exclusively
CONTAI
NER R6 AR 09 AHN 12PROCESSIN 0.39n AHN 15
WASHI
NG AUTOMATED AND OPTICAL R19 for the location assigned. The work must be executed in accordance with the
AREA MATERIAL DISTRIBUTION FABRICATION
AHN 11 AHN 16 documents produced as regards both the technical and aesthetic aspects involved.

ERATOR
DISTRIB.

ASSEMBLY A.
SERVICES STORAGE

STOR.AND

ERATOR
AIRCRAFT

MORGUE
R4

MORGUE
CENTER R21 5
ROOM The project cannot be modified or transferred without the express agreement of

REFRIG
R2 0.56n 2.4

REFRIG
MEDICAL AR 03 R23
AR 03 AHN 17 the Architect or Engineer responsible.
AHN 10 MATERIAL CORPUS
0.46n GENERAL EXIT
ING /
RECEIV NG STORAGE
SI
AHN 00
PROCES

STORAGE STORAGE AHN 00

BODY This drawing is indicative of architect visual requerements only. The contractor will
G
CEIVIN
PREP.
be fully responsible for the detail design and coordination of the insulation.

ING RE 0.50n
HOLDING
R.
MORGUE VISITORS ENTRANCE

STORAGE
LOAD L Detail and shop drawings are only valid if checked and released by the architect.

CAGED
0.55n 0.51n AUTOPS
RO 0.44n 0.52n AREA FOR 0.53n Y RO
CONT SE HAZARDOUS
REFREG. 0.54n
MORTUA OM BODY
WAREHOU R FREEZER SUSPENDED... EQUIPMENT
MATERIALS STORAGE EQUIPMENT RY VIEW.

STOREKEE
SUPERV
ISO STORAGE R.

RECEIVING G
HOLDING STORAGE
STORAGE

0.97n
LOADING BAY

T
0.49n

PIN
STAFF

/
0.98n
0.99n

OU
TOILET 0.100n WALK IN
34.00 0.101n FRIDGE
WALK IN REFRIGER. FAMIL
PREP. FLASH FREEZER STAFF/CO Y AC
0.95n FREEZER RPUS CESS
SHES FREEZER AREA

EMERGENCY AMBULANCE ENTRANCE


ACCESS
COLD DI
RECE
P
WAIT TION /

CY
CENTRAL LOCKER /

TOILET AREA MALE


STAFF ING A

CHANGING ROOM

ALE
REA

ALE
0.89n TRASH STAIRS

/
FORMS/

SHOWER MALE

M
CENTRAL LOCKER
0.90n CAN (SS8)

TOILET AREA FEM


FAMIL

CHANGING ROO
LITERATUR

SHOWER FEM
E LOCKER Y
TRASH DECON. TOIL

AREA

N
STORAGE

AREA
0.92n PREP. 0.91n DRY COLLECTION ROOM
ET
0.93n PREP. AREA

TION
FOOD CORPUS
0.94n PREP. FISH
EP. MEAT
17

GE
ACCESS
0.95n PR S STORAGE

GE
F VEGETABLE SUPPLI

CON RECEP
STAF HES STAFF

OR A
COLD DIS EQUIP ES/

KIT
Y ST R
STAIRS COPY R.

OL/
STAIR

E
EN

12
M. ST AMBU S
N LIN

CASU CENT
(SS6)

ONSE
RACK . LA (LV7)
CLEA G AND DISPA NCE

TR
LITTE

NCE
DIN TOILET

ER
TCH R

A LT
TOILET
HOL EMBLY

RESP
16

RG. /
MASS TEAM
/

13

ULA
ASS STAF
F WHEE
LIFT LCH.

AMB
SHOWER SHOWER PROVIDER
STAFF ST.
(LS8)
E
FOOD SERVIC

EME
EQUIPMENT

EM
LIFT OFFICE

UCTS

2.90
STAF
F (LS10) POTS & STORAGE CHANGING CHANGING
PANS (CONT.) PROCEPTOR RESIDEN

CLEANING PROD
LIFT POT CY

STORAGE
N E FEMALE STAFF PROGRA ISO
CLEA (LS9) STORAG PRIVAT

T
WASHING
MALE STAFF SECRETAR L
01 N TOILET / ADMINISTR. Y DIRECT
M E EXA ATION AHN
AHN LINE E CENTER SHOWERS
TOILET /
OR OFFICE NURSE STA
FF MR 01

15
COOKING EMER OO
RAG SHOWERS CUBICLE

OU
MANAG GEN LIFT M
STO AREA ER SERVIC CY (LS1
0.87n NON DECO 1)
ION DIREC E N
ARA
T
FOOD TOR SHOW T.
REP ER TRA

VAV
CK P STORAGE ROOM UMA
N PA ROO
LINE DISH M

RS
STORAGE

7n LINE
N
AN U
NIFO
RM
DISH EMERG ISO
SSIN
G
0.10 EPAIR CLE CHANGE CAFETERIA
ENCY L
EXA ATIO

TO
E BULK STORAGE
ROC R EX SERVING
TRAY
EMERGENCY MR N
NP STORAG
E
1.76n STAFF OO
LINE TION DISH STORAGE AREA OBSERVATION
EMERGENCY
EMERGENCY M
AN LOUNGE CEN
CLE RIBU STORAGE
OBSERVATION TRA
DIST DISH 1 OBSERVATIO
N
EMERGE
NCY SEC L ALA
2 OBSERV URIT RM

SI
RAL STORAGE 3 ATION EMERGE
ENT LY OBSERV NCY Y
8n C P DINING 4 ATION EMERG
0.10 ID SUP OBSER ENCY ON

VI
IQ U M ROOM 5 VATIO EMER CA REC
L TE CART ROO LL
SYS 0.77n DISH MONITORED N OBSE
GENC PHA EPT
STORAGE WASHING OBSERVER 6 RVAT Y EMER
M RMA ION
RS ION CY
F LO
CKE AREA 7 OBSE GENCY

MACY
STAF 0.86n RVAT
F ION EMER
STAF ON
STAFF PREPARATI 8 OBSE GENCY

PHAR
ET 1.181n

8.65
TOIL
N0
2 LOUN
GE FINISHED CLEAN UNITY PATIENT EMERGE
NCY OB
RVAT
ION
AH
N0
AH FA 2
RY FOOD
11
TOILET EMERGENC SERVAT 9
Y CORRID ION CON MILY
UND
OR OR
JANIT OBSERVAT
ION EMERGENC INT SULT./
LA
Y ERV

EMERGENCY PUBLIC ENTRACE


SATELITE PATIENT 10 OBSERVATIO EMERGE IEW
06n
G N NCY SCR
E IVIN RY BLOOD TOILET 11 OBSERV EME EE
0.1 REC ETA IN. ATION RG
SECR ADM DRAWING 12 EXA ENCE TRIA NING
ICLE DIRTY GE
CUB MR
CART CART .
0.85n WASH RECEPTION
0.84n SOIL UNIT
FINISHED
DAIRY FOOD EMER
ATE G
PRIV E PRODUC
TS 0.78n OBSE ENCY
OFFIC STORAGE 0.79n RVAT
ACY STORAGE FOOD ION EMER
0.10
9n
T
PHARM TOR
DIREC
JANITOR
STORAGE
WASTE
STORAGE
PHARMACY
13 OBSE GENCY
RVAT
ION EMER
T
G/ CAR ER 14
GIN H 0.83n OBSE GENCY
STA NGE/ WAS MOBI
LE EMERGENCY RVAT
ART XCHA AMBE
R
DIRECTOR 0.80n EMERGENCY ION
NC E ION ISO CH 0.57n 0.82n STAFF INT. GAS CYL./ OBSERVATION OBSERVATION EMERGE 15
03 INE ORM LLECT DIETITIAN
´S
Y FOOD LOUNGE 0.81n PP STAFF NC AH
N ED
L
NIF CO E/ OFFICE SECRETAR ICE MACHINE 24 OBSERVAT Y EMERGE EME SCR
N 03
AH SOIL ED U INEN RAG 0.58n SERVICE LOCKERS TOILET 23 ION NCY RG EE VCD

T
STO EAN T OBSERV EMERGE EXA ENCE
IL L T/WEIGH TRIA NING

SHMEN
O D NCOIC 22 ATION
S E CL ART 0.59n HEIGH
OBSERV NCY MR

NOURI TER
ING
SOIL T NC AL OFFIC
E SCREEN
TURE 21 ATION EMERG . GE
CAR E LINE CLINIC S LITERA E

0.60
OBSER ENCY

CEN
ND 20
RAG POU
COM ILE / DIETIC STORAG
STO ACTU
RI NG SMOKE VATIO
N EMER
STER TION
M AN UF
ACK FOOD N MOBILE
AHNMOBILE VENT. 19 OBSE GENCY
LE ARA PREP AHN 13 14 RVAT EME
MA ET PREP UCTIO RAD U. C-ARM AHN 15 ION EMER
PROD ICE AHN 12 RG
10n OIL 18 OBSE GENCY EXA ENCE
0.1 ERS/T SERV AHN 16 RVAT MR
CK AHN 11 17
ION EME .
LO OBS RGENCY
ERV
AT
6n
0.11 ARY AHN 10
AHN 17 16 ION
15n
ALE 0.1 E RET
FEM ILET IC SEC RACK EME
OFF ANT
11n TO 14n IST
RG
EXA ENCE
0.1 ERS/ 0.1 ICE A S S
NT AHN
09 CT AHN
18 MR
O CK F PLA GER SYSTEM .
L OF DRY A CT INDE 000 CFM
AHN 06 N M NA ANGIO AVAILABLE
COMPONENT P- STORA AHN 21 AH
N 04 LAU ANT OL ANGIO. AHC27 JANITORS AHC28 EQUIPMENT ENDENT GE ST N0 FCU
AH 13n G PL GER CONTR ROOM ORAG 4
FF 0.1 EEPIN NA 08 SYSTEM AHC26 ROOM AHC29 DISPLA E CT AHN
STA K MA AHN ENT
Y ROOM INDE 19
12n E USE IDS COMPON T
CONSOL
E ENDE P-
0.1 OUNG HO A T/ N
DISPL T
L S E UIPMEN AHC3 DRESS
+ REA CLO RAGE AHC25 EQ OM TRASH & 0ROO DRESS CONSOAY
GA RO DRESS M
DIN STO PLIES STAFF LIFT STAFF LIFT LINEN COL. ROOM LE
VEN SUP (LS6) (LS7) ROOM AHN
07
AHN IO
ANG GE HC24
AHC3
1
20
AHN
5 A
N0 RA 05
AH STO
23 AHC3
AHC REPORTING CT PATIE
NT
2 VAV
MRI
OFFICE PREPAR. SYS
CT & M
RI COM TEM
PO
LITY ING PATIEN EQU NENT
QUA NCE 1 ANGIO REPORT T AHC IPM
RA AHC0 NT OFFICE
WAITING 01 STOR ENT &
ASSU (GP) PATIE R. AG
A IO
ANG NT PREP
A ROO E
ARE CT& M

STAFF ENTRANCE
IE M
PAT ERY PATIE RI
REC
OV
SCRU
B
RADIOL PREP T
N
AR.
ADDITION
MANHOL
AL
E AL
DIGIT E
AREA

GOOD LIFTS (LS5)


OGY MRI
G
STOR AS
AGE
ADDITION
MANHOL
E
AL

IMAG GE SOIL
RA
STO SOILED UTILITY TOIL AH
AHC21 UTILITY ET C34
STA
FF
STA IRS STA FF
CLEAN IR
STA 3) MENT (SS S
(SS 2 EQUIP GE UTILITY AHC0 4)
AHC0 STORA EQUIP 2
ATE M
PRIV E X-RAY STOR ENT STAFF
STAFF
LIFT OFFIC
08 GENERAL 07 X-RAY
AGE LIFT

FF
(LS3) CLEA (LS4) AHL 10
AHL 03 3 MAMMO AHC0 UTIL N
AHC0 CRASH CART 3 ITY
/
GRAPHY WHEELCHAIR CHEST RADIO SOIL
UTIL D
E
34.15 LCPO ALCOVE STORAGE ON C
34.15
ULTRA
FLUO LOGY &
IC / AL
NCO / SMT ENCY ULTRA ROOM L ITY AHL 09
AHL 02 RESID G/ SOUND ROSC

PO
0.40l LPO
STAFF 2
IN
VIEW LT SOUND OPIC AHC3
TOILET AHC2 C SU
N RADIOLOGY 3 RACK

02
O MAMMO STA AHL 08
AHL 01 COP
Y
SCHEDULE
ON C
AL STAF LOC FF

W-700
SCALANCE
SOILE
D
ROO
M F DRESS RECEPTION DRESS DRESS TOIL L F KERS
ITY STAF IST TOILET ROOM ROOM AVAILABLE ET TOIL
ET
UTIL LOG TOILET ROOM
RADIO DRESS TOILET DRESS ST.
CY DRESS DRESS LOUN
ESIDEN ROOM

DRO
0 5 ROOM AHC0 STA GE
AH C NON-R ING/ TOILET ROOM ROOM DRESS 5 F
TOIL F
VIEW DRES

05 4 ROOM S ET AHC
AHC0 CONSU
LT ROOM 20
EQUIP HAIR
WHEE AGE

SE II TIVE TEL
E-
PHA UC. TRA RAD
STOR

INIS AVAIL IOLO


R ADM UBICLE
MENT

INST E ABLE GY
LC

CRASH C SCREEN ADMIN


OFFIC SCREEN ST. TO
CUBIC .
CART + LO ILET
RIPT
CKER LE
VE S
&

ALCO NSC
TRA ORK STA
W
LOU FF

S A.

.
RY
CUB
LITY NGE
QUA R.

THE PIRATO
T
RAD ELE-

ORD
WAIT

ASSU E

IST
IMAG IOLOGY
OFFIC AHC

REC
MED IC

04
DOC

E ST

RAP
&
ING

AHC 20

.
CLIN R.

WAITING AREA WAITING AREA ORA

R OF
RES
GE
ICAL

ARE
TOR

VIDE
A

PRO
AHC
06

05 02 AHC
19
CON TOR R.
DOC
SUL
TRE R.

COO HOME C
TAN
ATM

RDIN .
T

ATO
EN

RO

R
MAN RSE
.

AGE
T

NU
CON CTOR

TIL
T
A 24-02-2020 FINAL DESIGN SUBMISSION
DO

TES TABLE
SUL R.
TRE R.

TIN
G
TAN
ATM

FEM

UND
06 AL AHC
AHC
T

E 19
ENT

TO
Rev NO. DATE DESCRIPTIONS BY
NS

O
IL ET AHC

RAS
C07 PLE

TIO
WA

AH OFF 18
SAM ICE

ULT
IT

A
ING

R
EXT
ARE

EA

TO NT
AR
REVISIONS:
A

T
ACC

IE
ILE
PUB TH

OU
HEA IC
DOC

PAT

QU ROOM
NTIN

ENT
CLIN R R.

TOIL NT

AN NITOR ER
G
LIC

ET
L

IE
TO

MO HOLT

IPM
MA

PAT
LE
SH
OP TO
ILE CLIENT :

DE
ER T
RB + OP
EKG
BA SH F ARE WOR
LIT ORM
WA

TY ER S/ REC A AND
K
AU
ITIN

BE STO ATU
GY CLIN R R.

BAGHDAD GOVERNMENT
OR
E D RA RE DS
GA
NE

AG FOO GE
DO

OR AH
C08
REA
CO IC

AH ST FAST C1
7
CT

7 AH
E/ P)
LO

C0 FF SHO
E
TES KG
C 18
O

AH CO
GY

(C O TIN
TO RO PY G
ILE OM
T
CO CTO

TO
DO

ILE
NSU R R

T
LTA .

TE PUB
SO
UT ILED

WA PE
LE LIC
CONSULTANT :
NT

SH
ILI
TR R.

O
AR HON
TY

SC
EA E

H
EA

AP
TM

R
CA RESS
IOG
CO
EN

03MU

EMPRIBAR COMPANY
T

RD
N

ST
RO ICA ST
CO CTO

OM TIO E
SU RILE
DO

06
N
NS R R

AH

HO
09 C1 PP
HC LY
UL .

EC
A 6
TA

ST
OR

E
NT
TR

AG
E
EA

WA

VIC
AH
TM

8
C0
ITIN

C1
R.

SC ADU
AH
PH 7
EN

RE LT
T

EN
AR

ING
AR CONTRACTOR :
EA

CO

ER
Y
LIT
RR

CI FOOD VENDING 22.09.2017 Complete Submission all Floors


FA
MA
PE LIN R R.

IDO

PO C
G E SEATING AREA UT LEA
DIA IC

CS
DO

IN + OV ST
C O

ILI N
K
CY
PED
C
TR

N OF TY
CT

BA AL F
IC

M IC
AT PE
E
AH SC DIAT
RAYAT AL ALAMAIN CO. LTD
INI
0 AD

EST
AL RE
C1 C1 EN RIC
WA

D
ON AH 5 MA ITIO ING
ITI

TI OLE NE
ST

DI NH NA

Y
N

DO LINI LOG
AD ANH
OR
G

OL L

01
SS
CL

CL RIA
AR

AG

TA E
0. END E/F OP

M
DE LINIC R.

C MO
04
EA

50 IN A )

ND
V OFF SH

CT C
DO

OR
C OR
NT

(C

MEREDI GROUP

A
FO G M T F

TH
CT

AL

IN

OD AC OO

NA
OP
ST
SE HIN D

OR

ING
RV E

AH
S

09 AG
IC

C1
./

E
C
OR T

AH
CO OCT

CCE
CT AN

CONTROL
NS OR
D

DO ULT

ACCESS AREA

FF
UL

SE

NS
TA R.

GLASS RAIL
GLASS RAIL

CO

SSPROJECT DESCRIPTION:
NT

AH
RV

11
TR

C1

K
HC
EA T

FRO
4
E

PO
AR MEN

A
AT .

OR NT
ME

CT TA
IC
R

T
CO DO

PAR
EA
DO SUL
N

NS CTO
T

TR

MAL-SHAAB HOSPITAL
N
UL R

CO
TA
NT
TR

PAR(200 BEDS)
W

VISITORS/PATIENTS
VISITORS/PATIENTS
EA REA

AI

WHEELCHAIR

WHEELCHAIR

EA NT

DRO
TI

STAIRS (SV2)
STORAGE

STORAGE
TM
A

NG

AR TME
LIFTS (LV2)
EN

AR

EA
T

KIN
EA

AH
TR

10 C
C 15

RS
AH AH
CT IC AL

GT
1 C1
DO LIN EDIC
UR CLIN TOR

HC 3
OL IC

A
C P
SS OL
EA
SK

OR
DO

OG

TH
CE TR
IO NT

AR

O
C

AC CON

OR
DE

ITO
W

AT TIE
AI

BAGHDAD GOVERNORATE REPUBLICH


TI

N
NG

AG AIR
RM PA

OFO
OR H
AR

E
ST ELC
EA

FO UT

S
HE

IRAQ
SU CLIN TOR

LOCATION: AL SHAAB- BAGHDAD-IRAQ PI


W
O
RG IC

286
N
SK IO
IC
DO

IL N

TAL
DE AT

VIS
UT LEA
AL

Y
C

IT
M

C
IN

OR

PAR
F
CO DO

IN

IL D

AH
UT OILE

PLOT NO.: 6 / 2927 / 5m


NS CT

11
IT

C
UL OR

C 14
S

AH
TA

KIN
NT
TR

01
EA RE

CO
SHEET TITLE :
TM A
A

G
N
EN

SU
GROUND FLOOR PLAN
T

LT
DO

LOT
CE

AN
C TO

T
34.15
AN
R

W
AC LAYOUT
TR

AI
TI

S
TR NG
EN

EA AR
EA
AR TM

ING
IN

EA EN
T
MA

PHASE: DISCIPLINE: CLASS:


12

01

DE
C

N
AH

RM
0.

C AT
MEKKAH
DO LIN OLO C A DEP
CT IC G
04 IN

K
OR Y
FO GE
RM NE

PAR
AT RA DRAWN : DATE :
IO L

IN
FO 0.0
N
DE
SK MAIN ENTRANCE ---- FEBRUARY 2020
R 4l
04

DE MAT
AIL
L

SCALE : SHEET SIZE PROJECT NO.:


AH

RS
SK IO
SR

N
AS

SS ROL
EA
GL

AR
AC ONT

A1: 1/300 A3: 1/600 A1


CE
C

1) TS

0.03l

ITO
(LV IEN

WHEELCHAIR
TS AT

STORAGE
LIF RS/P

0.02l DRAWING NO. REVISION:


GROUND FLOOR PLAN
ITO

SECURITY AH
L0
VIS

AC-101
7

A
5

VIS
0.01l
L0

S
SV NT

RACK /
AH

S ( TIE
1)

ELEC.
AIR PA

SC:1/300
ST RS/

PURPOSE OF ISSUE :
ITO
VIS

FINAL DESIGN SUBMISSION


6
L0
AH
NOTES:
MEP · USEFUL SURFACE AREAS MAY VARY WHILE THE WORK IS BEING CARRIED OUT
· ALL MEASUREMENTS WILL BE CHECKED ON SITE BEFORE THE WORK BEGINS. IN
THE EVENT OF
DISCREPANCIES WITH THE GRAPHICAL DOCUMENTATION PROVIDED HERE, THE
PROJECT AND SITE
MANAGER WILL BE CONSULTED

This Project is constituted by an indivisible and coordinated group of original


documents and plans (which are open ended), graphical documentation, reports,
technical and management briefs, descriptions of budget items, budgets and
measurements, the official book of orders and attendance, and the work-site book.
They must all be taken into consideration by the construction company.

The only valid back up for these documents are the originals duly signed and
stamped by the Architect or Engineer who has drawn them up.

AR 12 AR 13 AR 15 IT files, verbal orders or notifications, email messages, physical and computer


AR 10 AR 17
R13
AR 18 document management system contents, printouts, photocopies, faxes or any other
AR 08 R9
AR 07 AR 19 kind of reproduction, as well as any original document unsigned or not stamped by
RESIDENTIAL the Architect or Engineer responsible in each case can never be considered to
LIFTS (RL1) RESIDENTIAL R16
AR 06 AR 20
L APARTMENT
STAIRS constitute part of or backup for the documentation of the Project or any part of it,
RESIDENTIA APARTMENT APARTMENT (RS2)
R5
STAIRS AP.-FF-FLAT-
08
1.11
1.09
1.07 1.29 R18 whether they refer to processes, dates, or traceability.
APARTMENT

AC-00
(RS1)

AC-00
APARTMEN AR 21

000CFM
AP.-FF-FLAT-06
AR 05

000CFM
AP.-FF-FLAT-07 AP.-FF-FLAT-05 T
1.13

AC-00
1.30

AC-00
R27 R28 R29

000CFM
1.05

000CFM

AC-00
000CFM
R3
ENT
R26 AP.-FF-FLAT-04
APARTM R20 All documents must be considered as part of the Project taken as a whole, and
APARTM ENT

AC-00
M
1.15 checks must be made to ensure they coordinate adequately. Moreover, checks must

AC-00
000CF
LOBBY 1.26 1.03 AR 01

000CF
AR 01 AT-09 R30 AP.-FF-F
AP.-FF-FL AR 22

M
4 -10 APARTM
AR 0
LAT-03
AP.-F
F-FLAT
ENT ENT be made on site of all the measurements, dimensions and specifications.

AC-00
APARTM CORRIDOR

000C
AC-00
CORRIDOR 1.01 KITCH

FM
EN

FM
KITCH
R1 1.17 R25 AP.-F R22

000C
EN

AC-0
1.23 F-FLA

AC-0
1.24 R31

000CFM

000CFM
T-02
1.19 1.21

AC-00
000CFM

0
AC-00
In the event of discrepancies, omissions, or inconsistencies, the Architect or

AC-00
000CFM

000CFM

0
000CFM

AC-0
APARTMENT

AC-00
000CFM
AC-00
RACK/

000CFM
R24 AP.-FF-FLAT-15 AP.-FF-FLAT-16
JANITOR ELEC. APARTMENT R32 Engineer must be consulted in writing. Otherwise, the documentation provided will

AC-00
M
APARTMENT APARTMENT

000CF
AP.-FF-FLAT
be considered to be understandable and sufficient.

AC-00
1.28 1.27 1.10 -19

000CF
AT-14 AR 02
AR 02

0
000CFM
AP.-FF-FL 1.12 AP.-FF-FLAT-17 1.08 APARTMEN

AC-0
000CFM

AC-0
M
T T
APARTMEN

AC-00
000C
AP.-FF-FLAT-18 1.06

AC-00
1.14 R11 R12

FM
FM
1 AP.-F
AT-1 R10 R14 F-FLAT

000C
F-FL ENT APARTM
APARTM
-01
AP.-F R8 ENT
G R15 LIVIN
LIVIN 1.16 1.04 AP.-F G
F-FLA
T-21 1.22 The Intellectual Property rights inherent to the documentation of the Project are

0
AT-13

000CFM
1.20

AC-0
AT-12 AP.-FF-FL R7 AP.-FF-F
LAT-20 APARTM
F-FL R17
AP.-F ENT AR 14 ENT
held by the Architect or Engineer and can be employed once only, and exclusively
APARTM AR 11 AR 16 1.02
1.18
R6 AR 09
R19 for the location assigned. The work must be executed in accordance with the

UNDERNEATH SLAB (30cm)


documents produced as regards both the technical and aesthetic aspects involved.

MEP CABLES & PIPES


R4
R21 The project cannot be modified or transferred without the express agreement of

CONNECTION
R2
AR 03
AR 03 R23 the Architect or Engineer responsible.

This drawing is indicative of architect visual requerements only. The contractor will
be fully responsible for the detail design and coordination of the insulation.

SEMI RESTRICTED CORRIDOR Detail and shop drawings are only valid if checked and released by the architect.
UPS/IPS

UPS/IPS

A36 SCRUB A41


UPS/IPS CLEAN SUPPLY
UPS/IPS

A31 UPS/IPS A46


DIRTY LI
UPS/IPS

SCRUB UPS/IPS
NEN
A26 A51
SCRUB ANESTHESIA
SURG.-FF-RM-16

UPS/IPS
UPS/IPS
UPS/IPS

SURG.-FF-RM CORR
-06 IDOR
A21 UPS
SURG.-FF-RM
-03 A56

UPS/IPS
SURG.-FF-RM-14 MEDICATION

UPS/IPS
SOILED

UPS/IPS
M-17
.-FF-R EQUIPMENT

UPS/IPS
UPS/IPS
SURG STORAGE
UTILITY

UPS/IPS
UPS/IPS
(GP-PHASE STORAGE
/
TRASH EN III)

12
A61

UPS
A16 SURG.-FF-RM
LIN STAT
SOLID F-RM-01
SURG.-FF-RM-12 -04

13
RACK -F LAB MALE
-02 CSSD

UPS/IPS
F-RM PATIE
GENERAL

UPS/IPS

UPS
R SSD
.-F
LOCK NT
CLEA FEMAL

17
C
R.

UPS/IPS
UPS/IPS

CON
OPERATION
30
UPS/IPS

LY CLEAN ER E TRO

29
UPS/IPS

SUPP RM-03 TOILET S/


UPS/IPS

PATIEN L
CSS
D.-F
F-
F
UPS/IPS STORE SHOW / LOCKER T STAF
A11 STAF UPS/IPS UPS/IPS

ERS S/ STAIR
F A66

28
STAIRS L TOILET
GENERA R. A42 UPS

SHOW / (SS7
S
(SS6)
UPS

ION A37 )
OPERAT
27
ERS

VAV
UPS/IPS

SURG
E CLEAN CORE .-FF-RM L&D
OFFIC
UPS/IPS

F A47 -02 FEM -FF


4 STAF A32 ALE
-RM
RM-0 -01

16
SURG
D-FF- LIFT .-FF-RM
LOC STAFF/
CSS
(LS8) STAFF -01
KE
LIFT A27 IMMEDIATE USE A52 TOIL RS/

25
L&D
RAL (LS10)
A57 SHO ET/ MAL F-RM-02
-F STAFF
CENT E STERILIZATION ROOM

18
F A71 LO
STAF

34
A6 WER E
IL
STER ENT LINEN N LOC STAFF/ UNGE

33
LIFT
UPS/IPS

S
CTIO
UPS/IPS

K L&D-FF
-08 RUM INSPE F-RM-05 (LS9)
26 TOIL ERS/
SEMI RE -RM-05
01 G ST AHN

32
-RM
TIN IN MBLY STRICT
E

F
AHN ITOR D-F PAT SHO ET/ 01
UPS

ONA
-F
ASSE
UPS/IPS

SD CSS PATIENT ED CO IENT


CS
DEC AND WER
UPS/IPS

N TRANSFE RRIDO

14 31
A17
UPS/IPS

JA A62 LIFT

15
G 6 DRY
UPS/IPS

Ante Rm R ZONE R S
RM-0 UN (LS1
ANIN D-FF- OM LA
UPS/IPS
UPS/IPS

SURG.-FF-RM-26 1)
CLE EA CSS N LINEN
FR GENERAL
ED AR LINE Y
SOIL ICE ) PL CLEAN GENERAL OPERATION R.
SUP GENERAL
E

V E
E

OPERATION R.
UPS

SER LABL 9 -07 STO


E UPS

UPS/IPS
UPS/IPS
UPS
UPS/IPS

-RM SURG.-FF-RM-27
-FF N R. A. GAS RAG
CYC -RM-0 OPERATIO L&D

R
SD
STORA FROM E

DOO
-FF
(RE SD-FF CS A12 A38 Isolation Rm (1) A. GA -RM

UPS/IPS
A43 GE S EMER A67 -03 TRA
E

UPS
E

CS EMPTY GENC
VAV
STORA SH

L
UPS/IPS
VAV
A48

UPS/IPS
A1

NTRO
A33 Y COL & LIN

UPS/IPS
L GE A76

UPS/IPS
GENERA R.
SER.
-FF-RM FULL IT RO LEC E
OM TIO N
E

SS CO
E

ION -05
UPS
UPS

STER INE
L&D
T OPERAT
SER. SER. -FF N
CAR H

MACH
A28 A53 -FF-RM EL/IPS

UPS/IPS
UPS/IPS
-FF-RM -RM
-04 -04

ACCE
STAFF -03

ILIZE
S EN T
WA
SER.
OCK EQUIPM
0 ICE SURG.-FF-RM-28 -FF-RM
M-1 SERV DELIVE

STER INE
T -R IRL BAY TOILET -02

R
CAR D
E

MACH
-FF RY
A STORE
UPS

SD ICE FOR R Isolation Rm (2) SER.-FF UPS

UPS/IPS
ROOM

STER INE
CS SERV ROO

ILIZER
ILIZE

UPS
HOL M-11 A72

UPS/IPS
A7 BAY -RM-06

MACH
STER A58
UPS/IPS

M 1

UPS/IPS
VAV
FOR ER
A23 UPS/IPS
E

UPS
E

UPS

STAFF SER
.-FF- L&D-FF

ILIZER
-R K ILIZ PACU RM-0
LOC
-FF -R M-06
SD STER
TOILET 1 STR
CS AIR BIO
UPS/IPS UPS/IPS

WH ECHE
EEL R

CSSD
OF MEDIC
AL STORA CH. /
UPS/IPS

IEF
UPS/IPS

SCRUB SCRUB GE PED. E

CH CS SHOP Bay PATIENT /HOLD SER.-FF NICU ST.


WORK X-Ray Equip.

UPS
-FF-RM OFFIC

E
A18 UPS/IPS

, -RM-07
-05 STAF NICUA63
S E
UPS

ICE 8 STAFF
LOUN F
E

SURG.-FF-RM-25 PREPARATION AND NICU -FF-


V
UPS

SURG.-FF-RM-29 -F F-RM RM-0


R
SE -RM-1 LOUN -04 2 NOU
-FF SCRUB Ante Rm RECOVERY 2 GE NICU-F
GE FEM
AL
NIC
U-FF- RISH
KER SD SCRUB F-RM
STA E
T ROO MENT
CS RM-0

EPARTMEN
-03 L&D
LOC ALE
1 -FF
LOC FF
UPS/IPS

A2 MAL STO M-09


-R L&D M A77
E

SURGERY D
FEM F-RM-12 KE
TOIL RS/ STA RAG -FF
AH
UPS

2 -RM
Ante Rm
N0 E -07
KER A13 LOC FF A68 N0
E

D-F E
SHO TS/
E UPS

AH
VAV
2
LOC LE
S
UPS

CS SURG.-FF-RM-30 KE
A44
A39 TOIL RS/
E

ICE WER MED


MA M-13
11
S DELIVE
OFF STAF E
SHO TS/ PRE ICATIO RY
E

-17 A34 A49


ACC F
UPS

UPS
F-R -RM
D-F CH SOILED MOTH WER PAR ROOM
AT ATIO N
F SURG.-FF-RM-39 ER
E

SS -F
. ESS 2
DISP
UPS

SD S
FAM./PA.FAM./PA
C SURG.-FF-RM-31
CS M -20 UTILITY BABY MOTH L&D L&D-FF-R
F-R A29 SECRETARY INTERNAL A54 ER -FF N -RM M-08
TOILET TOILET
D-F NICU-FF
RILE CSS NURSES FAMILY Isolation Rm (3) -RM-09 BABY AIRLO -10
STE IALS
E

SURG.-FF-RM-36
CK
UPS

T NICU
EQUIPMEN
L&D
A8 ER WORKROOM SURG.-FF-RM-40 WAITING -FF-RM -FF A73
MAT F-RM-19 ION SOIL-RM-12
UPS

M-44 -08
.-FF-R
DICTAT OM PATIENT Clean
ICE D-F
A24 SURG WORKRO SURG.-FF-R
M-41
AREA A59 QUA
UTIL ED
OFF CSS LAB. RECEPTION RAN
E

-16 AREA M-42 UTILITY L&D

UPS
TINE

E
SURG.-FF-R ITY
LAB
E

-RM T/ ING NICU -FF E


UPS

M-43
SD
-FF
SPLIN ST. DRAW SURG
.-FF-R SURG.-FF-RM-37 -FF-
RM-0 QUA INT -RM-14
CS BOX 1 7 RAN ER
CH. CONTROL CH FAM NAL
NICU O

UPS
4 IN CRUT RM-45 TINE
UPS

M-1
ADM A SH. NICU-FF NIC L&D NUR

DEL R &
WA ILY
U-FF-
T
-R
ROOM
-FF A19 -RM-10 -FF
T. .-FF- A64 RM-0
STA SE
AREF-RM-15
D -RM
CSS SURG 6 ITIN CLE -13 L&D-FF-R
UPS

RESTRICTED LINE ARE G TIO M-11


N.S SUP AN N
UPS

-F DELIV

UPS
VENDING

E
SD A VAV
CS ER
LE
FEMA /SH.
PLY
IVER ROOM Y
UPS

VAV

T. 3
TOI.

UPS
SH. CH./ PATIENT TRANSFER ZONE AIRL
FF
Y
VAV

CH.
E

A3
STA GE OCK A78

UPS
A14 A69
3 N BOX 2 AH
N0 LOU E N0 VCD
UPS

MAL SH.

UPS
E
AH PATIENT NICU-FF 3
/ L&
TOI. SEMI RESTRICT -RM-11
SUBWAITING ED CORRIDOR CON D-FF-RM
CH./ EXAM ROOM AIRL S -1
EL ENT ROOM EXA ULTAT 6
UPS

INPATI OR AM ROOM A40 EL CON OCK MIN


F OOM IS EX A45 UPS

TRO
IO
ATIO N
F O GY R SUPERVF-RM-20 OM A35 A50

-71
L
A9 CHIE SIOLO EXAM RO N

UPS
A74

E
.-F NUR

UPS
.-FF-RM
SURG
ST HE A30 AHN 14 A55
NICU-FF
-R M-12
UPS

STAT SE
UPS

1 AHN 13
F ANE -RM
-5
.-FF AHN 15 BOX 3 ION TOIL
F O GY RG AHN 12 L&D-FF

SURG
UPS

CHIE SIOLO SU R ET
E

-RM -15
JANITO A25 TOIL VAV
DELIVE
HE AHN 11 AHN 16 A60 ET
AN EST M-5
2
F WS.-G
L&D
RY
CHIE TIST F-RM ROOM

UPS
FF-R -FF-
UPS

TO OPERATION
RM
OF GY
T G.- -14 -17
ILE IEF O SU
R E
STH RM-60 CLEA WS.-G
TO CH ESIOL ANE AHN 17 UTIL N
F-

UPS
AHN 10 EQU RM-13

TO ICU
F
CHIE TIST
F-
G .-F A20 WAITING A65 ITY IPM
STH -53 E SUR
PANT
RY STOR ENT SEC
UPS

ANE FF
-RM STH AREA UPS
RE
ANE .-FF-RM-59 AGE TAR
EQU
.- IPME

RG
NT STOR
L&D
UPS

F Y VAV E
E

SU
CHIE TIST G -FF
-RM
SUR AHN
E

E 09 WAITI -21
STH M-58 AHN NG 18 E

ANE A79 000 CFM


A4 LL -R F A15 AREA NUR
-CA F G.-F A70 PAT ISOL SERY AHN 21 FCU
N 04 AHN 06 ON CHIE ETIST SUR IPS

AHC27 AHC28 REC IENT ATIO


AH
N0
AH H EPT 4
IPS

L&D
616 AN EST M-5
7
AHC29 ION -FF
-R
N NU
AHC26 OBS RSERY
-R AHN
.-FF 08 M-2
IEF RG
AHN
0
CH ETIST 19 ERV
SU L&D-FF
IPS

-RM-18
ATIO
IPS

H L&D
RECOVE
EST -RM-56 N
-FF
AHC3 -RM RY
AN AHC25 D11 IPS IPS

A10 D17 0 -19


FF
IPS

F F IPS
IPS

A75
STA GE
IPS

G.-
E

R
SU
UN -RM-5
4 IEF
LO CH ETIST
IPS IPS

FF H 7 D7 D21 AHN
.- -55
EST F-RM N0
IPS
IPS

RG 20
SU
AN AH 4
IPS IPS

AHC3
AHC2
F STAFF LIFT STAFF LIFT 1 AHN
RG.- 05
IPS
IPS

SU
AHN
(LS6) 05
IPS

(LS7)
IPS

1.22c
VAV
09
23 NOURISHMENT AHC3

10
A5 A80
AHC D3 STAFF CENTER 1.21c ICU D25 2 E

1.23c ICU
IPS

STAIRS
IPS

1.84c ROOM
ROOM ICU-FF-RM-18

IPS
IPS
E

(SS5) STAFF-LIFT
IPS

D1 ICU-FF-RM-17 1.20c ICU


IPS

1.24c ICU ICU-FF-RM-47


E

IPS

IPS
LOBBY ROOM
ROOM D12 D18 1.19c D29 AHC
1 ICU
AHC0 1.25c
ICU-FF
-RM-48 ICU-FF ROOM
ICU 01
ROOM -RM-16
49 ICU-FF
D22

IPS

IPS
-50 -RM-D8 -RM-
RM ICU-FF 1.80c 1.79c 15
IC U-FF-
c 1.18
1.26 N 1.78c ISOLA c
TIO 1.81c
D32 ISOLA OOM ICU TION D31
R D26 ROO
ICU D4 IC U-FF- M
RM-1
4
ICU-FF-RM-19 ICU-FF
-44 GOOD LIFTS (LS5)
D2 ICU-FF-RM -RM -21
-43 1.56c ICU-FF
IPS

ICU-FF
-RM 1.68c 1.67c 1.64c ICU-FF-RM-46 1.54c 1.52c -RM-22 IPS

08 07
MATERIAL ICU-FF
SOLID EQUIPMENT MATERIAL EQUIPMENT CLEAN -RM -23 D30 1.83c
1.82c HANDLING 1.51c
LINEN STORAGE/GAS HANDLING STORAGE LINEN
D19 AHC34
AHC21 1.47c
1.70c D13
CART AL. SOLID CLEAN CART AL. RACK
1.47c STA
FF 1.49c RACK/ ICU-FF-RM-20
STA IRS D64 TION SOILED ICU-FF-RM-45 SOILED 1.49c D33 STA FF
ELEC.
STA 3) 1.75c MEDICA . D9 1.61c D23 IR
(SS S

cape
fire es

PREP UTILITY UTILITY MEDICATION


(SS 2 CLEAN 1.59c ON 1.45c AHC0 4)
AHC0 UTILIT
Y
-RM-41 -RM-42
STAFF
CALL PREP. 2

fire es
ICU-FF 1.63c LOUNGE CLEAN
ICU-FF
cape

ROOM ICU-FF STAFF


STAFF D5 STAFF ICU-FF-RM-33 ICU-FF-RM-32
1.58c -RM-24 UTILITY
LIFT TOILET TOILET D27 LIFT
(LS3) 1.65c 1.55c 1.53c (LS4) AHL 10
1.66c
AHL 03 3 1.62c 1.57c AHC0
AHC0 OFFICE OFFICE
-RM-39 1.69c OFFICE HOUSEKEEPING OFFICE 1.50c 3
E ICU-FF 1.60c PUBLIC ICU-FF-RM-30 1.48c ICU-FF BRIDGE
BRIDG ICU-FF-RM-35

N
1.71c

OBSER NURSE
ICU-FF-RM-29 OFFICE -RM-26

VATIO
M-40 OFFICE ICU-FF-RM-36 AIDS

OBSER
M-51
-R OFFICE LOCKERS TOILET ICU-FF-RM OFFICE ICU-F
FF-R ICU-FF ICU-FF-RM-34 -28 1.46c F-RM
AHL 09

1.77c
1.73c -37 ICU-FF-RM-31

NURS ON
AHL 02 ICU-FF-RM
ICU- ICU-FF -13
CCU -RM-27 1.44c 1.
17c
D16

1.43c
OFFICE
1.27c ENT OFFICE -38
VATI 1.76c ICU-FF-RM D15 EQUIP ICU R.D.-F
M OFFICE MENT F-RM
LINEN E
EQUIP c
1.28 AIR 22 OFFICE D14 D20 1.
WHE 16c
AHC -23
ELCHHC 33ELCH RACK
AHL 01 CLEAN RM-09 WHE A AGE ICU-FF STOR AIR
ICU-F AGE
AHL 08

02
-FF- STOR -52 -RM-25
ENDY
ICU-F
F-RM

IPS
D63
D10
INTENSIVE CARE UNITS D24

D35
F-RM
-12

IPS

D62 5 D6 D28 AHC0 D34


AHC0
WHEE
5 LC
CRASH HAIR/

05
1.29 M

ROO U

1
ST. AHC
ICU-F

c IC

M-1
CART
NEUM
O AHC0 20
ROO

IPS
IPS

ST
c ICU

-FF-R
1.15
ICU: 6 U. ICU: 6 U.
F-RM

8
-FF- RM-0
ENDY R.D.-F

ICU
.
-53

F-RM
M. ST
IPS

-22
SOILED -07
MED
EQUIP ICAT
-FF-RM PREP ION

IPS

E
CCU: 5 U. PICU: 5 U.
ENDY .

IPS
IPS
IPS
IPS

ST .
GA STRO B2 B22
1.30 OM

ROO U
SS
DRE
ICU

c IC

-10
RO

M
M
ROO
c IC
-FF

-RM

IPS
PREP OVERY

1.14
IPS

-R

-FF
U

05
REC
END

M-5

ICU
B1
ARA

04 SS B23 AHC

E
4

DRE
Y-FF-

AHC 20
IPS

M NU
ROO
TION

D61 D37 WOR RSE

02
R

KRO

IPS
M-0

STAT OM/

IPS
IPS
/
6

D60 D36 ION

S
HAIR
ET
E

L
TOIL 06 AHC

ENA
AHC 19
END

S
STA DIALYSI
S//C

E
10 R

TION
IPS
IPS

CLE
A
UTIL N
OSC

R.D ITY
ISO ROO 5

N
.-FF

M
CCU

1.3 ION
EQU -FF-RM-0

ISO .13c
PIC LATIO
-R

E
END

OO
ICU

M-2
LAT M
CLE ENT

9
1
1c

M-0
B4 B24

UR
1
-FF

UPS

IPS
Y
IPM

R.D

F-R
IPS
AN

.-FF
-RM

-RM
-2
A 24-02-2020 FINAL DESIGN SUBMISSION

-F
PAT 0
-5

ICU
D59 IE
OPY

D39 TOIL NT
5

ET
IPS

IPS
UPS

E
B3 B25

IPS
IPS

06 D58 D38 AHC


AHC PAT 19
Rev NO. DATE DESCRIPTIONS BY

NU ROOM
IE
WO URSE -56

TO NT

WO 1.10c
1.3 OOM

AHC

-08
R.D
.-FF ILET
C07
ICU

ET
RKR

RSE
N

18
TOIL AH
4c

-RM
-RM
UNI

RK
-FF

-19

-FF
-R M

ICU

E
PAT
IE
LOC NT
SS
DRE M KER
S REVISIONS:
ROO
T

1.33c
PRE ECOVE M-04

NURSE
1.11c
R
PAR RY

SS
EN

STATION
DRE M NURSE
DY

ROO
ICU-FF-RM-57
CLIENT :
ATIO

E
D57 STATION
-F

B6 D41 B26
F-R

SOIL
N/

UTIL ED
R.D ITY
E

T
ILE
.-F
WO TEAM M-58

F-R
TO
E

AM M
1.3 ROO

BAGHDAD GOVERNMENT
-18
D56

TE ROO
RK c
RK

D40
ICU

WO 1.12
2c M

7
M-0
-FF

EQ
AH UIP

-R
-R

B5 08 C1 STO MENB27

-FF
7 A HC 7 RA T AH

ICU
C0
R.D
E

GE C1

IT
.-F
AH IPS
IPS
E
I
P

Care
Medical

Fresenius
F-R
M-1
8
E
I

P
Care
Medical

Fresenius
IMA ORA M-03

WA

UN
TR TER

OM U
1.3 ROO M-5
EN

E
ST -FF-R

RO PIC
GE GE

R.D ATM
UPS

03
6c M
D

IC

6
.-F
F-R NT
Y

M-0
U-F

8c
DA

CC

M-1

1.0

F-R
F

7
U
TA

-R

IPS
CONSULTANT :
IPS

D55

U-F
D43
STA LET

SIS
IC
TO

9
FF
I

SO
B8 B28 UT ILED
IPS

ILIT PE
R.D RIT

EMPRIBAR COMPANY

LY
STA NGE

RE AREA

IPS
EN

LO

.-F Y EX ONE
IPS

IPS
F -R
D54 AM AL
DY

CE

D42
U

M-1 R.D
FF

5 .-F R.
-FF

PT

F-R
-RM

M-1

DIA
IO

AH
09 C1
6
N
-02

B7 F-R
M-0
1
A HC
06 6

B29

OM U
1. ROO RM-

Y-F /

RO c PIC
NT
37 M 60

D EX
EN
ME
R.D
IC

A
cC

8 M AH

L
GE
.-F
U-

C0 F-R R.

5
07
C1
NA TOR

-0
CU
F

AH 7

1.
F-

RM
CL M-1
MA DOC

NA
U EA 4

F-
G D53 D45 R.D TILIT N
CONTRACTOR :

F
ITIN
IPS

U-

IPS
IPS

IPS

.-F Y
WA REA EX

IC
F R.D AM
-R
22.09.2017 Complete Submission all Floors
IPS

A M-1 .-F
F-R R.
2

RE
M-1

OM CU
3
1. ROO -RM-

DRYING
38 M 61

RO c PI
ROOM
IC
IPS

cC

4
IPS

IPS
U-

-0
R.D
06
B10 D44

RM
CU

D52
F

RE.-FF-RM-20 1. B30 .-F


F

RAYAT AL ALAMAIN CO. LTD


NC F-R

IPS
-
FF
1. O M-1
OF IC/..
0
04 U-
IPS

M-2 1

IPS
AH
IC
IPS

F-R c FIC .
GYM .-F C 10 C1 E
RE 5
AH
RE

AG E
OR UR
E
ST RAT
SOILED IPS

9
R.D
IPS

D51

MEREDI GROUP

M-0
IPS
HA

E
M-2 STORE D47 SO .-

LIT
IPS
CIA FF-R

-R
F-R

04 01
M-1

F
B9 .-F RE.-FF-RM-19 L B31

.-F
RE OF WO 0

R.D
IPS

FIC RK
E ER
B

9 AH
C0 C1
OM ICU
1. RO -RM

1.35c 1.09c
ILI

AH 6
39 OM -6

RO c P

CONSULTANT CONSULTANT R
c

HO DIA ENA
IC

-0

1.
CC

05
U-

RE.-FF-RM-18 c ROOM ROOM 03 ME LY L


F

-R
1.

41
U
F

SANITARY c R.D SIS


FF

D50 1. D46 R.D .-F TR


TA

ICU-FF-RM-64 ICU-FF-RM-01
U-

.-F F- AIN
IPS

SERVICE/CHANGE
IC

RM I
PO F-RM
2

-0 NG
IPS

R. R
IPS

- 8
RE.-FF-RM-16 B12 FA AH B32 R TA 06
11 MI C1 DI ENA BLE
TI

LINEN C LY L ST ALY L
RE R.D
AH MI PA Y L 4 NA .-FF
STORE FA &
c GE Y M
-6
3 IC
U- N OU
FF TR NG
OR SIS
PA AG
L S -R
M
LA TUD -07 PROJECT DESCRIPTION:
ON

RE.-FF-RM-17 40 N R F-R 7 E
IPS

Y B
1. LOU ANT U-F IES
IPS

-R E
IPS

TREATMENT M &

AL-SHAAB HOSPITAL
P C
IPS

I -0
2 PH
ROOM AR

2
-0
OF MA

RM
R.D
FIC CIS
UN

VISITORS/PATIENTS

F-
1.85c .-F
VISITORS/PATIENTS

E T
.-F (200 BEDS)
RE.-FF-RM-15 F-
VISITORS-LIFT R.D RM
STAIRS (SV2)

-0
LIFTS (LV2)

B33

-0 I.
B11 STAFF LOBBY 5

RM O
OS OR

F- F T
CLEAN

3
IL ILY

ROOM
FA ILE

CL NIT
I

ET

.-F AF
TO AM
ET

STORE
TO

AH
MI T
T

10
JA

R.D ST

DI
F
LY

E C
A HC RE.-FF-RM-13 OF TIC 15
RE.-FF-RM-14
2 AH R.D FIC IAN
EXAM C1 C1 .-F E
AH 3 F-
ROOM B14 B34 RM
-0
CONTROL & UN 4
IT
INFORMATION D
OF IRE
DESK FI CT
CE O
RE.-FF-RM-12 R.D
.-F R
MEDICAL RE F-
DOCTOR C RM
CO EP
ROOM EQUIPMENT
STORE
RE.-FF-RM-10
CO NT TIO
UN RO N/
TE L
-0
1
BAGHDAD GOVERNORATE REPUBLIC OF IRAQ
R
RE.-FF-RM-11 B37 LOCATION: AL SHAAB- BAGHDAD-IRAQ
EA G

B13 B35
AR ITIN

OFFICE
A

ROOM
PLOT NO.: 6 / 2927 / 5m
W

AH
11 C
C B16 14
AH RE.-FF-RM-09 WHEEL
NURSE R. CHAIR
SHEET TITLE :
DAYWARD
ROOM
STORE
RE.-FF-RM-07
01 FIRST FLOOR PLAN
RE.-FF-RM-08
RE

SANITARY
SERVICE/CHANGE
H AB
CO RE
UN CE
TE PTI
AC LAYOUT
B15 R. R ON
RE.-FF-RM-06
B18
PHASE: DISCIPLINE: CLASS:
12

N
RE
HA
C

BI
LIT
AH

AT
IO

04
N
RO
MEKKAH

C A DEP
OM

REHABILITATION
TO P.
T
ILE

GE

ROOM
D
RI

RE.-FF-RM-05
4
-0

rB
M

42
-R
TO P.
R T
FF

1.

DATE :
ILE
E.-

430
DRAWN :
B21 ---- FEBRUARY 2020
3
K
-0

B17
C
M
RA
R

FIRST FLOOR PLAN


F-
.-F

W
RE

AI
TI
NG
04

AR
SCALE : SHEET SIZE PROJECT NO.:
L

EA
AH

B20

RE
A1: 1/300 A3: 1/600 A1
1) TS

CE

SC:1/300
(LV IEN

PT
IO
TS AT

N
DRAWING NO. REVISION:
LIF RS/P

B19
ITO
.

AH
ST

L0
AC-102
VIS

A
RE
H.

.-F 7
AC F-
LC

RM
1

CO
M-0
5

EE

-0
UN 2
L0

S
F-R

SV NT
WH

TIN
AH

.-F

S ( TIE

G
R/

1)
RE

AIR PA
TE

PURPOSE OF ISSUE :
ST RS/
LIT

B36
ITO
VIS

FINAL DESIGN SUBMISSION


L 06
AH
NOTES:

· USEFUL SURFACE AREAS MAY VARY WHILE THE WORK IS BEING CARRIED OUT
· ALL MEASUREMENTS WILL BE CHECKED ON SITE BEFORE THE WORK BEGINS. IN
THE EVENT OF
DISCREPANCIES WITH THE GRAPHICAL DOCUMENTATION PROVIDED HERE, THE
PROJECT AND SITE
MANAGER WILL BE CONSULTED

This Project is constituted by an indivisible and coordinated group of original


documents and plans (which are open ended), graphical documentation, reports,
technical and management briefs, descriptions of budget items, budgets and
measurements, the official book of orders and attendance, and the work-site book.
They must all be taken into consideration by the construction company.

The only valid back up for these documents are the originals duly signed and
stamped by the Architect or Engineer who has drawn them up.
RESIDENTIAL
AR 12 AR 13 AR 15 IT files, verbal orders or notifications, email messages, physical and computer
AR 10 AR 17
R13
AR 18 document management system contents, printouts, photocopies, faxes or any other
AR 08
AR 07
R9
AR 19 kind of reproduction, as well as any original document unsigned or not stamped by
RESIDENTIAL the Architect or Engineer responsible in each case can never be considered to
LIFTS (RL1) RESIDENTIAL R16
AR 06
APARTMENT
APARTMENT
APARTMENT STAIRS
AR 20 constitute part of or backup for the documentation of the Project or any part of it,
L
R5 RESIDENTIA 2.11
2.09 (RS2) whether they refer to processes, dates, or traceability.
STAIRS T 2 F-FLAT-08
nd 2.07 APARTMENT R18
APARTMEN 2.27
AP.-

AC-00
(RS1) 2.05

AC-00
AP.-2nd F-FLAT-06 AR 21

000CFM
AR 05 2.13

000CFM
AP.-2 F-FLAT-07
nd
AP.-2nd F-FLAT-05

AC-00
ENT 2.28

AC-00
R27 R28 R29

000CFM
APARTM

000CFM

AC-00
All documents must be considered as part of the Project taken as a whole, and

000CFM
R3 R26
1.15 AP.-2ndF-FLAT
-04 APARTM R20
ENT

AC-00
APARTM checks must be made to ensure they coordinate adequately. Moreover, checks must

000CF
2.03

AC-00
CORRIDOR ENT AR 01

000CF
AR 01

M
nd -FLAT- 09 R30 AP.-2 nd
AP.-2 F 2.24 F-FLAT 2.01 AR 2

M
AR 0
4
.-2 T
nd F-FLA
T- 10 -03
AP.-2 nd 2 be made on site of all the measurements, dimensions and specifications.
T EN

AC-00
APM F-FLAT

FM
APAR

AC-00
-02

000C
KITCH

FM
EN
KITCH
R1 1.17 R25 R22

000C
EN

AC-0
AC-0
R31

000CFM

000CFM
2.20 2.22

AC-00
In the event of discrepancies, omissions, or inconsistencies, the Architect or

000CFM

0
AC-00

AC-00
000CFM

000CFM

AC-0
000CFM
AC-00
RACK/

000CFM
AC-00
Engineer must be consulted in writing. Otherwise, the documentation provided will

000CFM

0
R24 AP.-2 F-FLAT-15
nd
AP.-2 F-FLAT-16
nd
JANITOR ELEC. APARTMENT R32
APARTMENT APARTMENT

AC-00
be considered to be understandable and sufficient.

000CF
2.26 2.25

AC-00
AP.-2 ndF-FLA
APARTMENT

000CF
2.12 2.10 nd T-19

M
14 2.14 APARTMENT AR 02

AC-0
AR 02
nd -FLAT-

000
0
AP.-2 F

M
AP.-2 F-FLAT-17

000CFM
2.08

AC-0

CFM
ENT 2.06

AC-00

0
APARTM

FM
AP.-2ndF-FLAT
-18

000C
AC-00
ENT R11 R12 AP.-2 nd

FM
T-11 APARTM 2.16 R10 R14 F-FLAT

000C
LA
2 F-F
nd -01
AP.-
G 2.18 R8 R15 APARTM LIVIN
LIVIN ENT
APARTM
AP.-2 nd
F-FLAT G The Intellectual Property rights inherent to the documentation of the Project are
2.23

AC-0
000
13 2.04
2.21 12
nd -FLAT-
AP.-2 F AP.-2 ndF ENT
-21

CFM
F-FLA
T- R7 -FLAT-20
held by the Architect or Engineer and can be employed once only, and exclusively
nd
AP.-2 R17 2.02

0
AR 14
T AR 11 AR 16
TMEN
APAR R6 AR 09 for the location assigned. The work must be executed in accordance with the
1.19 R19
documents produced as regards both the technical and aesthetic aspects involved.
R4
R21
The project cannot be modified or transferred without the express agreement of
R2
AR 03
AR 03 R23 the Architect or Engineer responsible.

This drawing is indicative of architect visual requerements only. The contractor will
be fully responsible for the detail design and coordination of the insulation.

Detail and shop drawings are only valid if checked and released by the architect.

A36 A41
A31 A46

23555 CFM
AHU
GF
A26 A51

A21 A56
ABLE
AVAIL 3100 CFM
3100 CFM

M
RM -01

14630
nd
-2 F-

5 CF
STICS LOG. 1ST
LOGI ICAL AHU
PAT
RACK RAC
1ST
ED AHU
AHU
.
BIOM K

1222
T AHU PA

CFM
PMEN
EQUI INA16 nd -RM
-02
GF A61TH.-2 ndF-RM STAF
.-2 F TOIL F
G GF
ISTICS HOLD LOG -18
LOG ANCE PAT
TEN ET
MAIN IPMENT LOC .
CS EQU IVING KE

3100 CFM
-03
ISTI
LOG ICAL RECE nd -RM
.-2 F
PATH ROO R

1ST
AHU
ED
BIOM ENANC
E LOG .-2 nd
F-R M

3100 CFM
CS T -04 M-1

AHU
7

1ST
ISTI MAIN OP F -RM F
LOG ICAL STAF
nd
SH .-2
LOG

12 30
ED
STAIRS

29
BIOM RTA11 A66

28
S

13
5 STAFF
M-0

17
PA
ISTIC
S
ROO
M nd F-R
(SS6) A42
LOG DICAL G.-2 STAIR

27
LO A37 S
ME (SS7
BIO CTRIC . -06 )
ELE /CALIB M F A47
S nd F-R STAF A32
ISTIC AIR LOG
.-2
LOG ICAL REP LIFT
BIO
MED E
-07 (LS8) STAFF

25440 CF
IC

14
OFF nd F-R
M
LIFT A27 A52
ICS
25 16
.-2 A57
IST AL -08 LOG (LS10) AHU
34
M F
LOG DIC F-R STAF A71

26
A6

33
nd
.-2

M
ME LOG 1ST

CFM
LIFT AHU

27625 CF
M
BIO COIC S
ISTIC
AHU
(LS9)

5220
N01 E S LOG ITIES 1ST GF AHN
ISTIC
ICS
AHN OFFIC M-09
F-R LOG ITIES FACIL COLL. A17
32 MEP STA
FF
01

31
A62 LIFT

15
IST
nd
.-2 IL H
LOG DICAL
ME LO
G FAC NT T R AS
M (LS1
PLA ANCE ROO M-34 1) P

3000 CFM
BIO FILE
AUT AT.

18

1ST
AHU
S TEN IN-2
nd F-R OMA
ISTIC MAIN NTROL ADM
IST
ICS
LOG DICAL LOG ITIES CO TER 5 LAB TED
IL PA
ME FAC LLITE CEN-2nd F-RM
-3 AHU TH.- nd
BIO RARY S
LIB ICS IS TIC T E IN
1ST 2 F
-R
LOG ITIES SA ARMA12 A38 M-1
ADM
AHU
IST L AHU A43 A67
VAV
6
LOG EDICA

T
1ST 3125 CFM
AL nd -RM-36
1ST
IL
FAC TRAL A48

MEN
A1 BIOM IN. A33 A76
ADM Y IN-2
F 3100 CFM

CEN ECURIT
3100 CFM
ADM AHU

M/S
1ST

AGE
-10 -37
M
BLE A R M A28 A53
nd
.-2
F-R
ILA M-38 AL nd F-R
S AHU 3100 CFM
ISTIC
-2
AVA
G
LO MIN 5 CFM
1ST
nd -R
2 F AD LOG ITIES 11610
N
- 1945
MIN CFM
AD

A FACIL TION/
16660 CFM
3100 CFM

BLE M-39 A7 S
ILA
AVA IN-2nd F-R
S M LOG ITIES
ISTIC P
RECE ORDER
A23 AHU
2ND
A58
AHU
A72

STIC
ACIL
35
AHU
ICS CH K
WOR nd F-RM-33 GF P
GIST IES F GIN.TE MICR AT.
M
E AD 2ND

M
B L L O - 2 OSC
ILA ILIT EN BICLE IN

14640 CF
AVA -2nd F-RM
-40

GI IST
ICS
FAC CCESS
/A
CU IN-2nd F-
ADM
A18 AVAIL
ABLE GF A63
SLID OPE
E

LO
MIN nd F-
KEY NTROnd L ADM M-32 ICS AHU LAB
AD
MIN
-2
LOG ILITIES E CO MIN-2 F-
R
GIST PATH
AD M-29
S A C A G IC S LO DMIN. .-2 nd
F-R
HEM PAT.
R IC F R T

37
D VA
IST
1 A
STO
M-1
A
GIS RS
-3 V
F RM 2
LOG . STAF FILE MIN-2nd F- S LO DMIN. USTOME ATO
IL AD M-30 ISTIC A C ICE L
LAB OGY
A2 FAC OILET R LOG MIN. DMIN SERV -2nd F- PAT
A77
ICS AD TER A BICLE ADMIN

CFM
T AH
2 ICS
H .-2 nd
N0 IST FF TA13 U RM-2
1 A68 F-R N0

11
AH G IS P C U nd F-
2
LOG MIN.
M-1
LO .STA COM OM IN-2 A44 3

15055
ICS IL ADM -22 A39 HO P
IST S FAC UNGE -28 S AD OOM RO -2nd F- RM AHU RM AT.
ISTIC A34
LOG ILITIE S E R 2nd F- A49 2ND
IN 2.21 PAT.
LO nd F-RM S LOG MIN. F IL ADM M-23 1 ADMIN. ON
O
FAC AGER
-2 IC - R 2 ADMIN. LAB LOG

ADMIN-2nd F-RM-01
MIN IST AD IC IN
OFFICE FILE

BATHROOM
ADM M-24
4 ADMIN.
PA Y
AD
LOG MIN.
TH
N
MA FFICE -41 NCO E R A29 OFFICE A54 .-2 nd

ADMIN.
D 6 AD MIN. E MANAG. 2.19 PAT. STORAGE PA F-R
A OF FIC 2.02 PAT.
O nd F-RM FF FFIC-2nd F- E MANAG. REPRO RO PA TH.-2 F-R LAB T.
M-1

36
S T A / O AD MI N. OF FIC G. ROOM SHIPPING/RECEIVING OM
nd
M-22 4
-2 A8 ERS M IN 8 MANA ROOM TIS A73
MIN ICS K AD M-25
E NA G. PATH.-2 nd
STOR SUE BAC PA
T C FIC TER T.
AD R A24 MA F-RM-23
IS FF LO ILETnd - N. OF ROOM
nd
ADMIN-2 F-RM-02 PAT. A59
10 ADMI
S PATH.-2 F-RM-24 nd
AG
LOG .STA ISTIC
nd

TO IN-2 F LOG IN. MANAG. ROOM nd


ADMIN-2 F
-RM-04
ADMIN-2 F-RM-03 PAT. AREA E IO
ICS IN E OFFICE COMPUTER PAT. LAB LOGY
ADM OUNG
PATH
IST S
M
AD M-26 ADM RY/ IN. G. ROOM
nd -RM-05
F ADMIN .-2 nd PA
T
G IE L -27 R
A A D M MA NA ADMIN-2 ROOM CENTRAL F-R H.-
LO ILIT 2 ndF
VAV
M T 1 M-1
nd F-R
S CRE RS A RY -2 F-RM
nd -06 CUBICLE PATH.-2ndF-RM-21 STORAGE 1
PA -RM
C E -2 IC S E IT OM
T
MIN -15
FA IVAT AD
M IN
IST O
VISIT-2nd F-RM-2
0 A19 MIN. SAN RO AD
MAN T.
PR ICE -42 S LOG IN. 2 AD RY SERV
ICE 2 F-R
nd M-07 PATH.-2nd F-RM-20 PAT. A64
UA
OFF2nd F-RM ISTIC ADM OM ADM
IN
A 08 ADMIN-
LAB L
SANIT E
nd -RM-
LOG MIN. BIOHAZARD
Y RO ADMI
N-2 F PAT
COP -2nd F-RM-1 IC
- 9 H.-2 nd
AD
MIN
S AD TY SERVnd M-09 STORAGE F-R

ATION
IC M-1
E
PATHO
IN
IST SAF E ADM IN-2
F -R PATH.-2nd F-RM-01
PAT. PATH.-2nd F-RM-19
0
S LOG MIN. IC ADM PAT. PAT.
A3 TIC OFFnd F-RM-18 A14 IN. 3ADMIN. PAT. A78

ISTR
AD RIAL ADMIN. DIRECTOR PRIVATE DEC PA A69
ADM GE
N0
3 GIS
LO MIN. MAT AFF
E IN-2 5 ADMIN. OFFICE ADMIN. SECRETARY PATH.-2ndF-RM-02
LPO OFFICE
LOGY ONT T. AH VCD

ADMIN
A OFFICE A N0
AH AD IST. IS TIC
S
T
ADM
IN . S TOR nd M-10 7 ADMIN. OFFICE MANAG. SECRETARY
WAITING PATH.-2ndF-RM
-03 WAS M/GLAS MIC PA 3
S ADM Y
PATH.-2 ndF-RM
LOG MIN.
F-R
LOG CTOR -43 F F ICE M-17 M IN-2
AD MI N. OF FIC E MA NAG . ROOM
-04
PATH
HING S RO T.
B
AD ICAL O -2nd F-R COP A D 9
IR E nd F-RM . E NA G. M
.-2 nd
F-R
VAV
ME IOLO
D -2 S IN IN M OFFIC MA ROO A40 M-0 DIU GY
ADM TER ROO nd F-RM-11
M
PHY RITY -16 AD A45 9
MIN ROOM
nd
A35 2 F-RM-57 M
AD U PU T ADMIN. MANAG. ADMIN- A50 PAT.
SEC -2nd F-RM A9 M IN-2 2 F-RM-56
nd
O E D M IN- A74
IN. C ADM STAFF
RECORD
A PATH nd
ERN . ROOM -55
VA

1ADMIN L
.-2 F-
ADM EN
nd
MIN IN-2 F-RM
V

AD
. H nd - INT OM 2 FICE -54
ADM
A30 AHN 13 AHN 14 LOUNGEA55
RM-0
7
IN IT C R O -1 NC IA OF - 2 F-RM
nd
PAT.
ADM H K DMIN-2 3F
M
nd F-R
MIN. FINA M-53
AD MIN
AHN 12 AHN 15 PATH.-2nd
F-RM-06 BLOO
IN-2 E
2 AD IAL OFFIC 2 F-R
nd

BAT M A RM-1 ADM


NC
ADMIN-
A25 AHN 16 A60 BANK
D
IN. ROO-2nd F- FINA ICE nd -RM-
52 AHN 11 , CYT AT.
P
ADM OOM ADM ER
IN. OFF ADMI
N-2 F MEDIU O
R -1 5 ADMIN -14 M HIST LOGY
BED -2nd F-RM RM
IN. AG
MAN ANCE
nd F-RM
-51
2.35c AHN 17 REC LOGY
O /
MIN ADM G. IN ADM
IN-2
AHN 10 EIVIN
AD
MAN N.
A OF F -50
A20 BRIDGE A65 PAT
H.- nd G
nd -RM
ECH NT
2 F
. -2 F -R
. M IN T D MIN M-0
IN AD G. SIST
A A 8
ADM ING MA MA. N A A S
nd F-RM
-49
AHN
0 9 AHN
18
EET R IN-2
P
CYT AT.
000 CFM
A4 M OOM M-44 IN. PHA TANT ADM
A79
4 AHN 06 R nd F-R ADM G. IS
A15 A70 SCR OLOG AHN 21 AH FCU
N0 MIN
-2
MAN IS.
A ASS nd -RM-48 AHC27 AHC28 E
HIS ENING
Y N0
AH AD IN -2
F
TOL
4
ADM TANT
IN AHC29 /
IN. ADM 08 AHC26 AHN OG
ADM AG. IS
ASS nd F-RM-47 AHN 19 Y
MAN ING IN-2 AHC3
S
NUR TANT 6
DM
AA10 AHC25 D11 D17 0 A75
IN. IS
ASS -2nd F-RM
-4
ADM GER
A MIN D7 D21 AHN
MAN OM -45 AD
AHN
07
4 AHC3 20
RO nd -R5M AHC2
STAFF LIFT STAFF LIFT 1 AHN
-2N 0
F
INH (LS6) (LS7) 05
MA
AD VAV

10900

CFM
A5 23 AHC3 A80
AHC D3 STAFF D25 2
AHU STAIRS AHU

11885
CFM
1ST (SS5) 1ST
D1

AHC0
1
21 D12 D18 D29 AHC
01

20
D8 2.33c ST. D22

10 LIFT LOBBY
09
D32
22 D2
D4

2.21c GOOD LIFTS (LS5) 2.20c


D26

19
D31

FF
STA IRS
STA 3)
D64
AHC21 08 D13
07D19

D23
D30
AHC3
4
D33
STA
STA FF
IR
D9 (SS S
(SS 2 AHC0 4)
AHC0 2
STAFF
STAFF D5
LIFT D27 LIFT
(LS3) CFM
22340 (LS4) AHL 10
AHL 03 3 15840 CFM AHC0
AHC0 3
P. AHU
AHU TY TYP. AHL 09
AHL 02 CFM
ORED 19480 D15 D16
AHU
MONIT - AHU
AHC320660 C
2.51l ROOM 2 D14 D20 GF
AHC2 GF 2.32r
EXAM U TYP
. 3 FM RACK AHL 08
AHL 01 T & AH C.P.-2 nd

05
EC

02
F-RM-
SUBJ OM D10 13985 C D24 64
VER RO 14895 CF
M
FM AHU
OBSER nd F-RM-01 TYP.
C.P.-2 D63 D35
D62 AHC0 2.31r
5 D6 D28 D34
l
2.52 R/ AHC0
EPTO
PREC LT R.
N SU
CO -2nd F-RM-02
2.50l
AHC0
4 MEP 5
MEP AHC
20
2.34
C.P. 2.33 r ST
r ST
TOIL AFF LOUN AFF
-04 ETS GE
l F-RM
2.49 DENT
C.P.
nd
2
C.P.- -2 nd F-RM
ATE l RESI OM -62
PRIV E 2.48 RO
OFFIC EXAM B22 C.P.
WAIT

B2 -2 ndF
-RM-63

EA
-0 3
ING

nd F-RM

AR
C.P.-2 l
2.47 Y
AREA

ING
ETAR 5
E

SECR 2.3
TREA 0r
B1 B23 AHC

WAIT
-0
04 2 F-R
M
AHC 20
nd
l C.P.- DMIL
2.46 Y D61 D37 C.P. L
-2 ndF
ENC -R
RESID RAM
M-61

PROG TOR
C
DIREnd -RM-06
C.P.-
2 F 2.44
lr
AHC
06
D60

05 02
D36
AHC
19
2.29
r
NCO OFFIC -07

REC EA
C.P

2.42 DS

VEN 2.27r
RES

GAS TILATO
AR
.-2

2
RESP .28r
IC/L

OR
THE 2nd F-RM-0

CYLI R &
nd F-R
2.4 O/LPO

C.P

2.43 ORY
C.P

PIRA IST

STO NDER
RAG S IR
CLEA ATORY
.-

C.P E
.-2

5l
CP

RA

.-2 nd
nd F-R

F-R
-09
l

NING
T

M-5
P

9 C.P
.-2 nd
E

B4 B24 F -RM
M

-60
2.2
8

D59
SOIL 6r
UTIL ED PU 2.25r
A 24-02-2020 FINAL DESIGN SUBMISSION
PRIV ICE

D39
C.P

2.4 TE

L
OFF

240 ITY
CFM INH MONAR
.-2

30 C C.P
1l

75
A
nd F-R

.-2 nd AL
B3 247 FM RM
-58 -
F
CU ATION
Y B25
GF,1 AHU
C.P BICL AHC
Rev NO. DATE DESCRIPTIONS BY
M-1

AHC
06 D58
AHU1st S D38
FLOT & 2N
.-2 nd
F-R E
19
,
0

GF 2ND M-5 2.2


OR D 7 PU
LMO 4r
2.4 NAGER 1

& AHC
C07 18 N
MA nd -RM-1

AH FUN ARY
C.P

0l N

2.2 C
38l 2r TES TION
.-2

2. TIN
URS
F

C.P
.-2 nd G
F-R
REVISIONS:
E

M-5
6
ARE PU 2.21r
EC LM
OM ATOR FU ONAR
9l H
PRO FICE 2

AN NTION Y
C.P

2.4 ER

2.3 ORDIN E
OFnd -RM-1

ALY
IC PU 2.23r CLIENT :
.-2

.
CO OFF M-13
VID

CA

.-2 nd ZER
0l

C.P
D57 LM
F

YS
nd F-R D41 F
.-2 B6 B26 -RM
SCR ONA
-54
C.P EEN RY
C.P ING
EQ 2.20r
.-2 nd
RD

F-R
PE UIP M-5
SCO ST MEN 5

BAGHDAD GOVERNMENT

AR
7l SH D56 C.P ORA
3.3 D40 T
UPS

WAnd -RM-14 .-2 nd


F
GE
IO

F -RM
B5 .-2 AH -53 B27
C.P C08 C1

ON
AH . 7
C0
7
6l PY TY
P AH
UT EQ 2.19r AH
C 18
AH 2.3 SCO U U
O AH 148
YP
. STO IPME
PU

CH DURE .32
l
C FM 40 2.1
8
R
CLE AGE T
N
ON
C.P
2 60 CF .-2 nd r
BR ROCndE -RM-15 &

LM
128 M 2.1 A
.-2 nd NUP
F C.P
P F
.-2 7r -RM-51 F -RM
C.P S
AR CRU -52
LM

EA B
6
L/
23 CONSULTANT :

PU
ET M-1
RO N
D55 D43
T OIL .-2
nd F -R
NT 2.1
35l CO ATIO
03
C.P 5r
2. 3l
ON

24 U CLE
V 2.1
2.3 BSER B8 B28
C.P TI
.-2 nd LIT
AN 6r
O F-R Y S STER
4l C.P UPP

EMPRIBAR COMPANY

IO
2.3 ERY LY IL
06
M-4
T .-2 nd
ILE
9
V D54 D42 2.1 F
CO TO WER
-R
AR

4 M-5
RE OOM 1l O G CA r CA 0
R 2.3 H SH SSIN

RD
T RD
E

AH C.P H I
I T R E 09 C1 .-2 nd NS
IA
HC TR C
7
W DD M-1 A 6 F-R
YS

AN .-2nd F
-R M .
R, -48
KE C.P

CA
B7 B29
MA ENT CA 2.1
CE CO RDIA 3r
8 PA UIPM GE 2.1 AH
C0 EQ ORA M-18 9l 2r MP C C1
.

AH 2.2 ON SYS 7
ST nd F-R C.P
EN .
WA

D53 D45
CONTRACTOR :

A
.-2 nd
0l T

E
.-2 , 10 F-R
M-4 R.

AR
2.3 AKER
ITIN

C.P M 62
CF 5C 22.09.2017 Complete Submission all Floors

G
7
M 05
G

ITIN
CE 1 AH FM
PA ICD OG.
AR

25 T 2
CO .11r
1S & GU 1S

WA
EA

R
E R SS F& N
INT RE G F T RO TRO
ST HU C.P
.-2 nd OM
L
8l G B10 D52 A D44 B30
2.2 EK MIL 9
EA
D
TR 2nd F-R
L
M-1
.- .-2
nd
l F-R
.
M-2
0

HC
1 0
04 AH
C1
UPS

UPS
UPS
F-R
M-4
6 RAYAT AL ALAMAIN CO. LTD
C.P 27 IO A 5
C.P 2. ARD
C DS
HO OR E
EC REC RAG
O
D51
D47
MEREDI GROUP

UP
S
ST
EC

B9 12 2.1 B31
CA 0r
HO VIE nd F-RM

5 l R
EX CAT DIAC
2. DIOG
CA WI

09 2.2 AH
26

C1
R NG 1

PO H
C.P

C
l RAP

AH RO SUR 6
UPS
.- 2

O
NU M E
l
23 Y D50 0C
FM

01 25 D46 ST RS
-2

A
2. VER 2.42c 2.41c MI TIO E
H

16 , 88
25 GF 5C

l
NI

09
CO A 3 U
1S AHU
C.P MA N,
E

RE ARE -RM-2 AH 1ST FM

2.
B12 1 AH B32 .-2 nd L
EC C.P

1 T& G C1 F
nd F
HC 2N F -R
HO .-2

M-
.-2 D 4
C.P
A 45
PROJECT DESCRIPTION:
CA nd F-R
2. DIOG 22

2
24

AL
UP

VI .09
R

E
l RAP

EW r
AG R.
PH PH
C.P R
.-2 nd OO
IN
AL-SHAAB HOSPITAL

UPS
G
M-

SO A M
SE OGRM-24
F -R
H

A N I M
-4
VISITORS/PATIENTS

-R
TR RD 2nd F
(200 BEDS)
VISITORS/PATIENTS

4
2l CA .-
STAIRS (SV2)

B11 2.2 HO C.P 1l 2. B33


LIFTS (LV2)

2 07
EC 2. 2.46c r 2.
08 AH
10 ST r N
E

A U C
HC PE
C.P
.-2 nd TIO RS
15
A AH PA 2.05
CO . 2 N E
C1 T r
C1 F-
lS R 6 PR IEN R M
AH 3 C.P
19 SH -2 B14 B34 .-2 nd EP T -4
2. WA nd F-RM
3
RE 2.0
EC

CONTROL & F- .
2. CAR R. M-25

2. C 6r
HO

2 RM
C.P CU OV
20 D

.- 04
C.P T INFORMATION -4
E
IL .-2 nd BL
l S IO

1
UT r C IC RY
lT E
TR GR

DESK C.P LE
C.P

F-
18 L .-2 nd ILI AN RM LE
2. TAB ING -27
ES AP

TY
.-

-4
2
nd F

F-
S H

2
ST RM RM
E

BAGHDAD GOVERNORATE REPUBLIC OF IRAQ


-R

TE nd F- -4
0
.-2 2.
C.P 02
r

B13 LT 2.
1 6l B37
2.
C.P UT SO
01
r
.-2 nd ILIT ILE
EQ 2.
U 0
LOCATION: AL SHAAB- BAGHDAD-IRAQ
DU G F- Y
D
C.P T
S IPM 3r B35
O

C
11 .
l A NIN -28
17 EE -RM
2 CR nd F
l
14 OG
Y
2. IOL R. B16
RM
-3
8
.-2 nd R
F-
RM E
E
AG NT
-3
AH
C
14
PLOT NO.: 6 / 2927 / 5m
AH S .-2 9
9

C.P RD AM
-2
M

CA EX
R

SHEET TITLE :
F-

01
-2 nd

CA CRA 3l
SH
1
.

SECOND FLOOR PLAN


.P

.
2.

RM .-2 nd AL
C

l
15 IC
C.P RT

-3 F-

2. ATR ING
1
UT OIL 2r

DI EN
IL ED
S .1
0
-3

RM .-2 nd TY
2

PE RE nd
M

AC LAYOUT
R

I
F-

SC
-3 -F
.-2
.P

2
P
C

l
C.

09

-3 F-
2.

RM .-2 nd
PH SPE nd F-R

8
2. MA AR 3

B15
E C.P
DI .P.-2

11 C Y
AR NS M-3

AG ER
l Y
C

PHASE: DISCIPLINE: CLASS:


OR TT

B18
ST l LI
12

N
08
C
AH

MEKKAH
2.

C A DEP
ILE P.

AC
T
TO 07l

2.
C.P CO 10
2.

.-2 nd UN l

04
6

F- TI
-3
ILE P.

RM

RM N
G
C.P T

F-

DATE :
TO 06l

-3
.-2 nd

4
DRAWN :
2.

---- FEBRUARY 2020


F- AC
K

B21
5
-3

B17
.-2 nd l R
RM
05

793

SECOND FLOOR PLAN


2.

2.
04
C.P

lW
04

794 AR AIT
EA IN SCALE : SHEET SIZE PROJECT NO.:
L

G
AH

B20

A1: 1/300 A3: 1/600 A1


1) TS
(LV IEN

RE 2.0
SC:1/300
TS AT

CE 2l
LIF RS/P

PT
IO DRAWING NO. REVISION:
ITO

B19 N
AC 2
VIS

AH
CO .03
UN l 797 L0
7
AC-103 A
.

TI
T

NG
F-R .S
5

EE 01l

7
L0

-3
.-2 nd LCH

S
M

SV NT
WH 2.
AH

S ( TIE
1)
AIR PA

PURPOSE OF ISSUE :
C.P

ST RS/

B36
ITO
VIS

FINAL DESIGN SUBMISSION


6
L0
AH
NOTES:

· USEFUL SURFACE AREAS MAY VARY WHILE THE WORK IS BEING CARRIED OUT
· ALL MEASUREMENTS WILL BE CHECKED ON SITE BEFORE THE WORK BEGINS. IN
THE EVENT OF
DISCREPANCIES WITH THE GRAPHICAL DOCUMENTATION PROVIDED HERE, THE
PROJECT AND SITE
MANAGER WILL BE CONSULTED

This Project is constituted by an indivisible and coordinated group of original


documents and plans (which are open ended), graphical documentation, reports,
technical and management briefs, descriptions of budget items, budgets and
measurements, the official book of orders and attendance, and the work-site book.
They must all be taken into consideration by the construction company.

The only valid back up for these documents are the originals duly signed and
stamped by the Architect or Engineer who has drawn them up.

IT files, verbal orders or notifications, email messages, physical and computer


AR 13
AR 10
AR 12 AR 15
AR 17
document management system contents, printouts, photocopies, faxes or any other
AR 18
R13 kind of reproduction, as well as any original document unsigned or not stamped by
AR 08 R9
AR 07 AR 19 the Architect or Engineer responsible in each case can never be considered to
RESIDENTIAL
LIFTS (RL1) RESIDENTIAL R16
constitute part of or backup for the documentation of the Project or any part of it,
AR 06 AR 20
L APARTMENT
STAIRS whether they refer to processes, dates, or traceability.
R5 RESIDENTIA APARTMENT APARTMENT (RS2)
STAIRS T-08 3.09
rd
AP.-3 F-FLA R18
3.11 3.07
APARTMENT

AC-00
(RS1)

AC-00
AP.-3rdF-FLAT-06 APARTMEN AR 21

000CFM
AR 05

000CFM
AP.-3 F-FLAT-07
rd
AP.-3rdF-FLAT-05
3.13 T All documents must be considered as part of the Project taken as a whole, and

AC-00
AC-00
R27 R28 R29

000CFM
3.05

000CFM

AC-00
000CFM
R3 R26
APARTM
ENT
rd
AP.-3 F-FLAT
-04 APARTM
ENT
R20 checks must be made to ensure they coordinate adequately. Moreover, checks must

AC-00
000CFM
3.15

AC-00
3.03 AR 01 be made on site of all the measurements, dimensions and specifications.

000CF
AR 01 rd -FLAT- 09 R30
AP.-3 F AR 2

M
4 10 APARTM
AR 0 rd F-FLAT- AP.-3rd 2
AP.-3 ENT F-FLAT AP.-3rd ENT

AC-00
APARTM
F-FLAT

FM
-03

AC-00
3.01
-02

000C
EN KITCH

FM
KITCH
R1 3.17 R25 R22
In the event of discrepancies, omissions, or inconsistencies, the Architect or

000C
EN

AC-0
AC-0
R31

000CFM

000CFM
3.02 3.01

AC-00
000CFM

0
AC-00

AC-00
000CFM
Engineer must be consulted in writing. Otherwise, the documentation provided will

000CFM

AC-0
000CFM
AC-00
000CFM
AC-00
000CFM
AP.-3 F-FLAT-16
rd

0
R24 rd
AP.-3 F-FLAT-15
APARTMENT JANITOR
RACK/ APARTMENT R32 be considered to be understandable and sufficient.

AC-00
000CF
APARTMENT APARTMENT

AC-00
ELEC. AP.-3rdF-FLA
3.12 3.10

000CF
T-19

M
rd -FLAT-14 AR 02

AC-0
AR 02

000
AP.-3rdF-FLAT-17 3.08

0
AP.-3 F 3.14 APARTMEN

M
000CFM
AC-0

CFM
T T
APARTMEN

AC-00

0
FM
AP.-3rdF-FLAT 3.06
-18

000C
AC-00
3.16 R11 R12 AP.-3 rd

FM
T-11 R10 R14 F-FLAT

000C
rd F-FLA ENT APARTM The Intellectual Property rights inherent to the documentation of the Project are
APARTM
-01
AP.-3 R8 ENT
G R15 LIVIN
LIVIN 3.18 3.04 AP.-3 rd
F-FLAT G
held by the Architect or Engineer and can be employed once only, and exclusively

AC-0
13 3.01

000CFM
-21
3.02 rd F-FLAT-
12
rd -FLAT-
AP.-3 F R7 AP.-3rdF
-FLAT-20 APARTM
AP.-3 ENT R17 ENT

0
AR 14
APARTM AR 11 AR 16 3.02 for the location assigned. The work must be executed in accordance with the
3.19 AR 09
R6
R19 documents produced as regards both the technical and aesthetic aspects involved.
The project cannot be modified or transferred without the express agreement of
R4
R2 R21 the Architect or Engineer responsible.
AR 03 R23
AR 03

This drawing is indicative of architect visual requerements only. The contractor will
be fully responsible for the detail design and coordination of the insulation.

Detail and shop drawings are only valid if checked and released by the architect.

STAF
F
STAIR
S
(SS7
)

VCD

PATIENT 000 CFM


FCU

AHC27 CORE 90m² AHC28


AHC29
AHC26

AHC3
AHC25 D11 D17 0

SURG.-3rdF-RM
D7 -21 D21
4 3.20 3.18 AHC3
AHC2 STAFF STAFF
ON CALL
1 VAV
ISOLATION LIFTS LIFTS 3.17 ISOLATION
3 BED 26 (LS6) (LS7) BED 25 AHC3
A HC2 D3 STAFF 3.16 SU D25 2
RGERY -22
STAIRS 3.19 O.C. SURG.-3rdF-RM-20
rd
SURG.-3 F-RM RG
3.21 SU 3.83 BEDS ERY 3.15 SU
(SS5) BATHR. 24
Y BED 27 3
TYPE UNIT SURGERY BEDS: D1 RGER
3.22 SU 28 SURG.-3
rd F-RM-2 SURG.-3rd
F-RM-1
RG
BEDS ERY
23
20 TYPE UNIT SURGERY BEDS:
21
9
BEDrd F-RM-24 D12 D18 SURG D29 AHC
1
AHC0
.-3 rdF-
SURG
.-3 RM-18 01
3.14
ERY SU
25 BEDS rd RM-2
.-3 F-
6
SURG
3.23 BED 29 -25
G.-3
M
rd F-R
D8 D22
SUR
BEDSRGERY
G
.-3 rd
22
F-RM
SURG
.-3 rdF-
25 BEDS
22
-17 RM-1
SURG SUR 3.13 6
D32 IP
V V D31
3.24 ERY SURG IP
SINGLE ROOMS 8 SURG 30
BED
D2
D4

3.61
3.60
TRASH &
GOODS
LIFTS (LS5)
3.57 3.56
D26

19 E
BED 21RY SINGLE ROOMS 8
3.62 NOURISHM. 3.53
DOUBLE ROOMS 8 AHC21
3.71
3.67
3.66
RACK/
3.65 EQUIPM
RAGE
STOD13
ROOM & GAS
.
TREATM.R.
WHEELCH.S. LINEN/COL.
rd
WD.-3 F-
rd
WD.-3 F-
RM-11 RM-10
rd
WD.-3 F-
CENTER
WD.-3rdF-
TREATM.R.
WD.-3rdF-
3.51 EQUIP
STO
D19
ROOM &
RAGE
M.

X-RAY
3.50
RACK/ 3.48
CLEAN L. 3.47 WD.-3 rd
D30
AHC34 DOUBLE ROOMS 8
D64 CLEAN L. ELEC. RM-12 RM-09 RM-08 ELEC. F-RM D33
CART AL MEDICD23
-01

ISOLATION ROOM 1 D9 TION CART AL.


ISOLATION ROOM 1
rd WD.-3rdF- 3.44
WD.-3 F-
3.72 MEDICA N rd RM-07 WD.-3rdF- . PREP ATION 3.42 AHC0
WD.-3 F- RM-13
rd F-
2 IO ARATIO SOILED
AHC0 WD.-3 9
RM-1 3.74 SOILED PREPAR
AT rd F-
RM-14 RM-06 WD.-3 rd N 3.43 AUTO 2
WD.-3 MEDIC M.
UPS

Y F- UTILIT CLEA
rd F-RM-2
7
CLEA
N UTILIT WD.-3
rd F-
RM-15 WD.-3rdF-
RM-05 WD.-3 rd
F- Y N DISP. INE
SURG
3.75 D5 SUPP .-3 rdF-
UPS

RM-04

TREATMENT ROOM 1 TREATMENT ROOM 1


.-3 LY RM-16 RM-26 WD.-3 rd UNIT 3.12 RM-1
SURG ERY R. SUPP WD.-3
rd F- rd
WD.-3 F- 3.55 WD.-3rdF- LY +D27 SURG 5
SURG LABO 7 rd 3.59 WD.-3rdF- RM-03
F- CRAS
RM-1 WD.-3 F- RM-28 H E STAFF
L. RM-24 3.58 BED 20RY
WD.-3 rd
STAFF 3.25 31
rd F-
SATE WD.-3 8 CONSULTANT F- CAART
CONSULTANT
3
UPS

3.54 OF. RM-29


BED RM-23 HCA.0
AHC0
RM-0
S 3.63 OF. STAIRS
UPS

RM-1 rd
FAMILY WAITING & WD.-3rd 3
STAIR
F- 2
3.52 OF.
3.64 OF.
WD.-3 ROOM F-
RM-22 NCOIC ROOM NCOIC RM-30
(SS3) . NURSE
rd PLAY ROOM NURSE ADMIN
(SS4)
ADMIN WD.-3 F- WD.-3rdF- 3.49
3.68
. R RM-27 SUPERVISO CUBIC .
SUPERVISO
LE rd F- RM-25 PRIVAT 3.45 WD.-3 rd
E
ERY CUBIC WD.-3 0 3.69 ST ERS PRIVAT D15 D16 R E TOILET ST. RM-3
F- LE 3.11
SURG RM-2
+LOCK OFFICE D20 OFFICE +LOCKE 2 SURG
3.26 32
AHC2
2
3.73 ST
. TOILET D14 3.82 RS 3.41 ST AHC3
3
ER
BED 19 Y
BED YS. 3.46 PH LOUN .
LOUNGE
8 SURG
rd F-RM-2
3.76 OL 3.70 PH D10 D24 CHARTI .
YS GE .-3 rdF-

WARD SUPPORT 450m² 3.


RG.-3 RM-1
SU
CHARTI
NG CONT40 4
C ONTR rd F- WD rd
NG
.-3 F- ROL
D63 WD.-3
RM-21
RM-31 D35
D62 5 D6 D28 AHC0 3.10 D34
ERY AHC0 5 SU
SURG BED RGERY
3.27BED 33 9 AHC
WARD TERRACE 503m²
4 SUR 18
AHC0 -2 rd F-RM G.-3 rd
20
G.-3 F-RM
SUR -13

WARD FLOOR 2.694m² (total)


-30 SUR
rd F-RM
G.- rd
G.-3 3.09 3 F-RM-1
SUR ERY
BED SURGE
G 2
SUR -35
3.28EDS 34 rd F- SUR
S 16 RY
-17
B D61
G.-3 D37
G.-3 rd
SUR M-31 RM
-11
F-
R
D60 D36
3.77 P. 3.39
TOILET P.TOILET AHC
06
AHC 19

RY 3.0
8
RGE 7 BED SURG
9 SU 6-3 S 14 ERY
3.2 EDS 3rd -RM-32
Total number of beds 25/ward - 50/floor - 200/hospital
SU
RG
.-3 rd -15
B .-3 F
SUR
G
F-R
M-1
0 A 24-02-2020 FINAL DESIGN SUBMISSION
D59 Ward: D39

D58
1 isolation + 8 single beds = 36.0% = 9 single rooms = 53.0% D38
Rev NO. DATE DESCRIPTIONS BY
AH
C07 RG
.-3
rd F-R
RY
M-3
3
16 double beds = 64.0% = 8 double rooms = 47.0% 7
SU
3.0 .-3 rdF-R
M-0
RG
AHC
18
SU GE BED SUR 9
UR 9 S 1 GER
0 S 38-3
3.3 EDS
B
= 17 rooms in facade 2-1 Y
3 REVISIONS:
3.78 SOILED .-3
RG 4
rd F- 4 single rooms; can either be used as single or double rooms, SU
RG
RM .-3 rd
-08 F-
3.38 SOILED
UTILITY S. SU RM-3 UTILITY S.
and this layout is repeated on all ward floors. CLIENT :
D57 D41

3.0

D56
GE
UR -41
RY
1 S 40 M-35
3.3BEDS 3rd F-R
RG
.-
SU
RG
BE 6 SUR
DS G
1 E
.-3 rd 0- RY
F
-R
11
M-0
D40

AH
BAGHDAD GOVERNMENT
C08 SU 7
C1
AH 7

S
25

ED
SU

YB
R GE

R
6 SU
GE
rd F-R
M-3 3.0 RG.-3 rd CONSULTANT :
RY

RY
23 BE 5 SU -RM-0
F
.-3
UR

RG GE D55 D43
SU UR -43 DS RG 6
BE

2 S 42 08 ERY
S

-09
3.3 BEDS

24
D

25

EMPRIBAR COMPANY
S

D54 D42

9 AH
C0 C1
AH 3.
6
Y 0
ER BE 4 SU
RG -45 7 SU
RG S
D R G
SU 44 M-3 .-3 rd 06 ER
33 EDS 3rd F-R F- -07 Y

You might also like