CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 1 of 7 14.02.2022

Method Statement for Demolition

Document No Date
Project Doc Type Rev
14.02.2022
Police Club MS 00

List of Attachments
No Reference Description

Revision History

Rev Prepared By Reviewed By Approved By


Date Description
No Project Eng.
0 14.02.2022 Nikita Kasianov

Signature:

_______________________

1 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 2 of 7 14.02.2022

Contents

1.0 SCOPE...............................................................................................................................3

2.0 REFERENCES..................................................................................................................3

3.0 RESPONSIBILITIES.........................................................................................................3

4.0 RESOURCE REQUIREMENTS.....................................................................................4

5.0 METHOD & SEQUENCE OF Conventional Demolition.............................................4

6.0 EMERGENCY PROCEDURE.........................................................................................5

7.0 EMERGENCY PREPAREDNESS & RESPONSE PLAN...........................................6

8.0 EMERGENCY RESPONSE PLAN................................................................................6

9.0 WELFARE FACILITIES...................................................................................................7

10.0 SANITATION AND HYGIENE MEASURES...............................................................7

11.0 Risk Assessment............................................................................................................7

2 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 3 of 7 14.02.2022

1.0 SCOPE

The scope of this method statement is for all types of Demolition.

2.0 REFERENCES

 OSHAS18001:2007
 ISO14001:2004
 DM Code of construction safety practice
 Provision of local order no. (3) of 1991on construction activities
Regulations, in the Emirates of Dubai.

3.0 RESPONSIBILITIES

1. The Project Manager is overall responsible for the implementation of method


statement and ensures that his team of Engineers, surveyor and foreman are
aware of this method statement and all resources – human, material and
equipment’s are available to carry out the work as planned and without any delay.
The Project Engineer is responsible to carry out the work as per the approved
shop drawings, method statements, contract spec. and documents. Ensure job
sequence is done properly and within quality standards.
2. Construction Manager is responsible to plan the schedule of as-built surveys,
identify non-conforming i.e. out of tolerance structures and issue the report.
3. Project Engineer is responsible to ensure that all Safety precautions are in place,
and that all personal on site are using the required Personal Protective
Equipment’s like – Helmet, Gloves, Shoes, and Coveralls.
4. Coordinate with the Site Engineer and make sure sufficient manpower and
equipment are available for job execution.

4.0 RESOURCE REQUIREMENTS

3 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 4 of 7 14.02.2022

Equipment and Materials


1. Demolition equipment (Hammers, jack hammer)
2. Corrugated sheets or other similar material to protect existing floor

Manpower
1. Project Engineer
2. Civil Engineer
3. Chargehand
4. Helpers

5.0 METHOD & SEQUENCE OF Conventional Demolition

1. Place warnings signs in a prominent location on the structure and ensure that they
can be seen and read easily.
2. Existing structures, equipment, and appurtenances that remain prior to demolition
work commencement will be protected.
3. All safety measures will be provided in areas where demolition work shall be
performed and as directed by the Engineer.
4. Lights, barriers, and temporary passageways for free and safe access will be
provided and maintained.
5. All utilities will be disconnected and rebooted including AC diffusers, light
connection and piping.
6. Begin demolition.
7. Demolish and remove existing utilities, equipment, and appurtenances and hand
over to the client.
8. Systematic and progressive demolition of structure will start from partition walls.
9. Demolition operations will be conducted in such a manner as to avoid hazards to
workers.
10. Demolition works will be carried out promptly and expeditiously to minimize dust
and other inconveniences to others.
11. Noise levels will be restricted at reasonable times, as acceptable to the Engineer.
12. All rubbish, dirt and residues will be removed from the facilities in a manner that
minimizes the noise and spread of dust.
13. All waste products will be disposed of by licensed waste carrier.

4 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 5 of 7 14.02.2022

6.0 EMERGENCY PROCEDURE

All site personnel are briefed on emergency procedures and arrangements within their
safety induction. The daily attendance of all labor present at site will be taken. This is to
ensure that an accurate picture of who is present on site is always maintained and in
case of emergency all site based personal can be quickly accounted for.

Authorities Emergency Numbers

Police: 999
Ambulance: 998
Fire: 997
Electricity: 991
Water: 992

Dubai supply authority (Gas section): 8097211/8801999


Rashid Hospital: 04 2192000
RTA: 8009090

Project Emergency Numbers

Pawan Satwani (Project Director) 0506522784


Sajjad (Project Consultant) 0565929736
Nikita Kasianov (Project Engineer) 0503865509

7.0 EMERGENCY PREPAREDNESS & RESPONSE PLAN

5 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 6 of 7 14.02.2022

 Ensure that supervisors clearly understand their responsibility and role in the site
emergency procedures.
 Designate first aid and provide medical supplies and other material and
equipment that may be required for emergency use.
 Determine emergency evacuation routes for work areas and construction site and
designate safe assembly areas.
 Ensure that all site personnel & visitors clearly understand emergency warning
siren signals used at site and the safe assembly areas.
 Designate a supervisor to conduct a head count and give instructions to evacuees
as necessary.
 Post emergency information for each work area on the site.

8.0 EMERGENCY RESPONSE PLAN

Well organized sketch plan as per approved site layout plan of offices, working site
areas, including as necessary.
 Location of fire extinguishers,
 Emergency telephone number display boards.
 Location of assembly points,
 Evacuation route plans.
 First aid room location. Location of trash containers/dust bins, scrap bins & skips.
 Location of concrete truck mixer dump-off area and
 Site rubbish dumping area.
 Safety sign boards,
 Rest area
 Porto cabins, Stores
 Location of Main DB.
 Location of Diesel generator, Diesel storage, etc
 Washing area.
 Toilet., etc.
 Boundary fencing, etc.

9.0 WELFARE FACILITIES

6 of 7
CLIENT: CONSULTANT: MAIN CONTRACTOR:

Mounir Salon

Project Project
Emirates Towers Mounir Salon
Location: Name:
Ref. No:
Title: Method Statement for Demolition Page 7 of 7 14.02.2022

 Toilet and washing facilities shall be provided before the commencement of work
and shall maintain as per DM standard.
 Food shall only be consumed in designated properly shaded areas agreed with
the prior approval.
 No food shall be consumed within the work areas
 All food wastes shall remove immediately, in a hygienic manner, and shall not be
allowed to accumulate.
 Drinking water (cool water in summer) will be made available at site all time.
 Resting area should be provided near the work area with adequate seating
arrangements and ventilation facility.

10.0 SANITATION AND HYGIENE MEASURES

In order to provide adequate sanitary conditions for all personnel at site, the following
provisions as part of the temporary facilities to be provided.

 Garbage disposal and regular collection.


 Sanitizing materials will be made available at the site.

11.0 Risk Assessment