Perhitungan Kekuatan Box Culvert: UKURAN: 2000x2000mm. T 40cm L 2.0m Rev: BEBAN: Axle Load 70 Ton Date
Perhitungan Kekuatan Box Culvert: UKURAN: 2000x2000mm. T 40cm L 2.0m Rev: BEBAN: Axle Load 70 Ton Date
1m REV : 00
UKURAN : 2000x2000mm. T=40cm L=2.0m
BEBAN : Axle Load 70 Ton DATE : 29/12/2021
PTM
Gwd
D
t2
H
Hf H
Hf
t3
t1 B t1
3 Load calculation
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
5) ground reaction
Acting Load (tf/m2)
Wbot=fDL.(t3*BT+Hf2)*gc/B0 Wbot= 1,39
Wtop .fDL Wtop= 1,39
Ws=fDL.Wsw*2/B0 Ws= 1,92
Pvd.fLL Pvd= 0,77
Pvt1.fLL Pvt1= 39,41
Pvt2.fLL Pvt2= 0,00 hiw: internal water depth 0,25 m
Wiw=(hiw*B-2Hf^2)*gw/B0 Wiw= 0,19
Up=-U/B0 U= -1,98
Q= 43,09
summary of resistance moment
Item V H x y M
(tf/m) (tf/m) (m) (m) (tf.m/m)
Self weight top slab 3,34 - 1,20 - 4,01
side wall (left) 2,30 - 0,00 - 0,00
side wall (right) 2,30 - 2,40 - 5,53
invert 3,34 - 1,20 - 4,01
load on top slab Pvd 1,84 - 1,20 - 2,21
Pvt1 94,57 - 1,20 - 113,49
Pvt2 0,00 - 1,20 - 0,00
soil pressure side wall (left) - 6,65 - 0,88 5,88
side wall (right) - -6,65 - 0,88 -5,88
internal water 0,46 - 1,20 - 0,55
uplift -4,76 - 1,20 - -5,71
total 103,41 124,09
5) ground reaction
Acting Load (tf/m2)
Wbot=fDL.(t3*BT+Hf^2)*gc/B0 Wbot= 1,39
Wtop.fDL Wtop= 1,39
Ws=fDL.Wsw*2/B0 Ws= 1,92
Pvd.fDL Pvd= 0,64
Pvt1.fLL Pvt1= 64,67
Pvt2.fLL Pvt2= 0,00
Wiw=fDL.(hiw*B-2Hf^2)*gw/B0 Wiw= 0,19 hiw: internal water depth 0,25 m
Up=-U/B0 U= -1,98
Q= 68,22
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
5) ground reaction
Acting Load (tf/m2)
Wbot=fDL.(t3*BT+Hf^2)*gc/B0 Wbot= 1,39
Wtop.fDL Wtop= 1,39
Ws=fDL.Wsw*2/B0 Ws= 1,92
Pvd.fDL Pvd= 0,64
Pvt1.fLL Pvt1= 39,41
Pvt2.fLL Pvt2= 0,00
Wiw=fDL.(hiw*B-2Hf^2)*gw/B0 Wiw= 1,63 hiw: internal water depth 2,00 m
Up=0 U= 0,00
Q= 46,38
summary of resistance moment
Item V H x y M
(tf/m) (tf/m) (m) (m) (tf.m/m)
Self weight top slab 3,34 - 1,20 - 4,01
side wall (left) 2,30 - 0,00 - 0,00
side wall (right) 2,30 - 2,40 - 5,53
invert 3,34 - 1,20 - 4,01
load on top slab Pvd 1,54 - 1,20 - 1,84
Pvt1 94,57 - 1,20 - 113,49
Pvt2 0,00 - 1,20 - 0,00
soil pressure side wall (left) - 1,27 - 1,24 1,57
side wall (right) - -1,27 - 1,24 -1,57
internal water 3,92 - 1,20 - 4,70
uplift 0,00 - 1,20 - 0,00
total 111,32 133,58
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
5) ground reaction
Acting Load (tf/m2)
Wbot=fDL.(t3*BT+Hf^2)*gc/B0 Wbot= 1,39
Wtop.fDL Wtop= 1,39
Ws=fDl.Wsw*2/B0 Ws= 1,92
Pvd.fdL Pvd= 0,77
Pvt1.fLL Pvt1= 64,67
Pvt2.fLL Pvt2= 0,00
Wiw=fLL.(hiw*B-2Hf^2)*gw/B0 Wiw= 1,63 hiw: internal water depth 2,000 m
Up=0 U= 0,00
Q= 71,77
summary of resistance moment
Item V H x y M
(tf/m) (tf/m) (m) (m) (tf.m/m)
Self weight top slab 3,34 - 1,20 - 4,01
side wall (left) 2,30 - 0,00 - 0,00
side wall (right) 2,30 - 2,40 - 5,53
invert 3,34 - 1,20 - 4,01
load on top slab Pvd 1,84 - 1,20 - 2,21
Pvt1 155,20 - 1,20 - 186,24
Pvt2 0,00 - 1,20 - 0,00
soil pressure side wall (left) - 78,87 - 1,20 94,69
side wall (right) - -78,87 - 1,20 -94,69
internal water 3,92 - 1,20 - 4,70
uplift 0,00 - 1,20 - 0,00
total 172,25 206,70
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
k1 = 1,0
k2 = H0t23/(B0t13) = 1,0000
k3 = H0t33/(B0t13) = 1,0000
qA = -qD qB = -qC R =0
qA = -9,60351 qC = -9,47851
qB = 9,47851 qD = 9,60351
MAB = k1(2qA +qB) - CAB = -11,2699 tf・m
MBA = k1(2qB+qA)+CBA = 10,4733 tf・m
MBC = k2(2qB+qC) - CBC = -10,4733 tf・m
MCB = k2(2qC+qB)+CCB = 10,4733 tf・m
MCD = k1(2qC+qD) - CCD = -10,4733 tf・m
MDC =k1 (2qD+ qC)+CDC = 11,2699 tf・m
MDA = k3(2qD+qA) - CDA = -11,2699 tf・m
MAD = k3(2qA+qD)+CAD = 11,2699 tf・m
c) Bending Moment
MA = MAB = -11,270 tf・m
MB = -MBA = -10,473 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 4,5367 -4,9680 x + 0,9150 x2 , x = 4,268
1,162
Bending moment at x = 1,1618 m is;
Mmax = SABx - w1x /2 - (w2-w1)x3/(6L) + MAB
2
= -8,874 tf・m
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -10,473 tf・m
MC = -MCB = -10,473 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1,200 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 19,454 tf・m
c) Bending Moment
MC = MCD = -10,473 tf・m
MD = -MDC = -11,270 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 2,1161 -0,5760 x -0,9150 x2 , x = -1,868
1,238
Bending moment at x = 1,2382 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -8,874 tf・m
c) Bending Moment
MD = MDA = -11,270 tf・m
MA = -MAD = -11,270 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 52,1835 -43,4862 x , x = 1,200
k1 = 1,0
3 3
k2 = H0t2 /(B0t1 ) = 1,00000
k3 = H0t33/(B0t13) = 1,00000
qA = -qD qB = -qC R =0
qA = -7,87529 qC = -7,75030
qB = 7,75030 qD = 7,87529
MAB = k1(2qA +qB) - CAB = -25,0616 tf・m
MBA = k1(2qB+qA)+CBA = 24,2650 tf・m
MBC = k2(2qB+qC) - CBC = -24,2650 tf・m
MCB = k2(2qC+qB)+CCB = 24,2650 tf・m
MCD = k1(2qC+qD) - CCD = -24,2650 tf・m
MDC =k1 (2qD+ qC)+CDC = 25,0616 tf・m
MDA = k3(2qD+qA) - CDA = -25,0616 tf・m
MAD = k3(2qA+qD)+CAD = 25,0616 tf・m
c) Bending Moment
MA = MAB = -25,062 tf・m
MB = -MBA = -24,265 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 43,3367 -37,3013 x + 0,9150 x2 , x = 39,570
1,197
Bending moment at x = 1,1969 m is;
Mmax = SABx - w1x /2 - (w2-w1)x3/(6L) + MAB
2
= 0,613 tf・m
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -24,265 tf・m
MC = -MCB = -24,265 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1,200 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 23,758 tf・m
c) Bending Moment
MC = MCD = -24,265 tf・m
MD = -MDC = -25,062 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 40,9160 -32,9093 x -0,9150 x2 , x = -37,1695
1,2031
Bending moment at x = 1,2031 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0,6126 tf・m
c) Bending Moment
MD = MDA = -25,062 tf・m
MA = -MAD = -25,062 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 82,3423 -68,6186 x , x = 1,2000
k1 = 1,0
3 3
k2 = H0t2 /(B0t1 ) = 1,00000
k3 = H0t33/(B0t13) = 1,00000
qA = -qD qB = -qC R =0
qA = ####### qC = -9,93250
qB = 9,93250 qD = 10,16520
MAB = k1(2qA +qB) - CAB = ####### tf・m
MBA = k1(2qB+qA)+CBA = 9,95784 tf・m
MBC = k2(2qB+qC) - CBC = -9,95784 tf・m
MCB = k2(2qC+qB)+CCB = 9,95784 tf・m
MCD = k1(2qC+qD) - CCD = -9,95784 tf・m
MDC =k1 (2qD+ qC)+CDC = 10,64674 tf・m
MDA = k3(2qD+qA) - CDA = ####### tf・m
MAD = k3(2qA+qD)+CAD = 10,64674 tf・m
c) Bending Moment
MA = MAB = -10,647 tf・m
MB = -MBA = -9,958 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 0,9014 -0,4800 x + -0,0200 x2 , x = -25,750
1,750
Bending moment at x = 1,7503 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -9,840 tf・m
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -9,958 tf・m
MC = -MCB = -9,958 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1,200 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 19,878 tf・m
c) Bending Moment
MC = MCD = -9,958 tf・m
MD = -MDC = -10,647 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 0,3658 -0,5760 x + 0,0200 x2 , x = 28,15
0,650
Bending moment at x = 0,6497 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -9,840 tf・m
c) Bending Moment
MD = MDA = -10,647 tf・m
MA = -MAD = -10,647 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 52,0299 -43,3582 x , x = 1,200
k1 = 1,0
k2 = H0t23/(B0t13) = 1,00000
k3 = H0t33/(B0t13) = 1,00000
qA = -qD qB = -qC R =0
qA = -8,49842 qC = -8,26572
qB = 8,26572 qD = 8,49842
MAB = k1(2qA +qB) - CAB = ####### tf・m
MBA = k1(2qB+qA)+CBA = 23,81105 tf・m
MBC = k2(2qB+qC) - CBC = ####### tf・m
MCB = k2(2qC+qB)+CCB = 23,81105 tf・m
MCD = k1(2qC+qD) - CCD = ####### tf・m
MDC =k1 (2qD+ qC)+CDC = 24,49994 tf・m
MDA = k3(2qD+qA) - CDA = ####### tf・m
MAD = k3(2qA+qD)+CAD = 24,49994 tf・m
c) Bending Moment
MA = MAB = -24,500 tf・m
MB = -MBA = -23,811 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 39,7014 -32,8133 x + -0,0200 x2 , x = ########
1,209
Bending moment at x = 1,2090 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = -0,494 tf・m
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -23,811 tf・m
MC = -MCB = -23,811 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 1,200 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 24,304 tf・m
c) Bending Moment
MC = MCD = -23,811 tf・m
MD = -MDC = -24,500 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 39,1657 -32,9093 x + 0,0200 x2 , x = 1644,3
1,191
Bending moment at x = 1,1910 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = -0,494 tf・m
c) Bending Moment
MD = MDA = -24,500 tf・m
MA = -MAD = -24,500 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 82,4959 -68,7466 x , x = 1,200
As-2 As-2
As-3 Steel #3
Steel #1 Steel
As-1 As-1 Steel #4
Steel #2
As-4'
As-4
Steel #2
As-1' As-1'
Item Side wall Side wall Top slab Invert Side wall Side wall Top slab Invert
Point bottom top end end middle middle middle middle
Side outside outside outside outside inside inside inside inside
Notation As-1' As-1 As-2 As-2' As-4 As-4' As-3 As-3'
Minimim Steel Area 819 785 1.216 1.247 0 0 1.357 1.400
(mm2)
Actual Steel Design 3.368 3.368 4.032 3.501 2.174 2.174 2.970 2.970
(mm2)
Status OK OK OK OK OK OK OK OK