This assessment task consists of six (6) practical demonstration activities.
Activity 1: Plan team outcomes
Activity 2: Prepare work plan
Activity 3: Conduct a coaching session
Activity 4: Support ICT team during the implementation of the project
Activity 5: Prepare action plans based on the individual and team performance
Activity 6: Monitor the outcomes of action plans.
You will receive your feedback within two (2) weeks, and you will be notified by your
trainer/assessor when your results are available.
You must attempt all activities of the project for your trainer/assessor to assess your
competence in this assessment task.
Applicable conditions:
This skill test is untimed and is conducted as an open book assessment (this means you are able
to refer to your textbook or other learner materials during the test).
You will be assessed independently on this assessment task.
No marks or grades are allocated for this assessment task. The outcome of the task will be
Satisfactory or Not Satisfactory.
As you complete this assessment task, you are predominately demonstrating your skills,
techniques and knowledge to your trainer/assessor.
Your trainer/assessor may ask you relevant questions during this assessment task
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 1 | 55
Resubmissions and reattempts:
Where a student’s answers are deemed not satisfactory after the first attempt, a resubmission
attempt will be allowed.
The student may speak to their trainer/assessor if they have any difficulty in completing this
task and require reasonable adjustments.
For more information, please refer to the Training Organisation’s Student Handbook.
Location:
☐ a classroom
☐ learning management system (i.e. Moodle),
☐ workplace,
☐ or an independent learning environment.
Your Trainer/Assessor will provide you with further information regarding the location for
completing this assessment task.
The purpose of this assessment task is to assess the student’s knowledge and skills essential to lead and
facilitate a team in a range of contexts and industry settings.
Skill to assign tasks to team members with appropriate instruction and considering any required
contingencies
Skills to provide feedback and assistance to team members
Skills to collate feedback on individual and team performance
Skills to identify and implement development opportunities for others
Skills to manage conflicts and challenges according to organisational requirements.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 2 | 55
Simulated Environment
These instructions are to be followed if the student is unable to complete the assessment in a workplace
environment.
This assessment task will be completed at your training organisation or a simulated environment prepared
by your training organisation.
The simulation environment consists of both the physical space and its contents (such as the equipment
and participants etc. The simulated environment is very much like a learning environment where a student
is able to practice, use and operate relevant industrial equipment, techniques, practices under realistic
workplace conditions.
The trainer/assessor will ensure that the simulated workplace environment is sufficient to complete this
assessment task.
The training organisation as the workplace where the student will be required to complete their job-
related tasks and activities.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 3 | 55
The standard operating/workplace procedures related to the training organisation
The trainer/assessor will provide the student with assistance throughout the assessment activity.
Gain experience in the challenges and complexities of dealing with multiple tasks
The following resources, tools and equipment will be made available by the training organisation at the
workplace to complete this assessment task:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 4 | 55
o Work team
You are working as a team leader in the ICT department of your training organisation. You are leading and
facilitating a team in the training organisation while handling the ICT project.
As part of your job role, you have the following job responsibilities:
Prepare performance plans and assign tasks to team members with appropriate instruction and
considering any required contingencies
Coordinate team and individuals and provide the required feedback and assistance to team
members
Support team to complete the work activities
Monitor team performance based on the work plans
Collate and provide feedback on individual and team performance
Identify and implement development opportunities for others
Manage conflicts and challenges according to organisational requirements.
Task requirements
This assessment task requires you to demonstrate skills to lead and facilitate a team. You need to complete
the following activities:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 5 | 55
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 6 | 55
Workplace Environment
These instructions are to be followed if the student is able to complete the assessment in an actual workplace.
Workplace requirements
The assessment task can be completed in the workplace if the student is currently working or has access to
a workplace meeting the assessment criteria.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 7 | 55
Gain experience in the challenges and complexities of dealing with multiple tasks
The following resources, tools and equipment must be available at the workplace to complete this
assessment task:
o Work team
Workplace scenario
You are working as a team leader in the ICT department of your workplace. You are leading and
facilitating a team in the workplace while handling the ICT project.
As part of your job role, you have the following job responsibilities:
Prepare performance plans and assign tasks to team members with appropriate instruction and
considering any required contingencies
Coordinate team and individuals and provide the required feedback and assistance to team
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 8 | 55
members
Support team to complete the work activities
Monitor team performance based on the work plans
Collate and provide feedback on individual and team performance
Identify and implement development opportunities for others
Manage conflicts and challenges according to organisational requirements.
Task requirements
This assessment task requires you to demonstrate skills to lead and facilitate a team. You need to complete
the following activities:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 9 | 55
Assessment Task 2: Skills Test
Skills Test:
This assessment task requires you to lead and facilitate a team for an ICT project.
During this assessment task, you are required to complete the following activities:
This assessment task will be completed at your workplace or a simulated environment prepared by your
training organisation.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 10 | 55
Assessment activities
Activity context
Management wants you to plan team outcomes for the ICT project. The purpose of planning team outcomes
is to ensure that the team members are clear regarding the following:
expected outcomes
goals
behaviours
This activity requires you to plan team outcomes. You are required to complete the following:
Part A: Identify the common objectives of a workplace team, responsibilities and required outcome
Part B: Develop an individual performance plan
Part C: Develop a team performance plan
Part D: Prepare a contingency plan
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 11 | 55
Part A: Identify the common objectives of a workplace team, responsibilities and required outcome
This part of the activity requires you to identify the ICT project details and the objectives of the workplace
team, responsibilities and required outcomes for the project.
Template 1:
The goal is to develop a online clothes shop website for clients. In order to do this, we need to set up a web
team. We need to bridge the gap between innovative and new digital products with unfamiliar audiences.
Before any products or digital services can be offered, the web team must make edits and check for
quality. Though digital, web content is still maintained by web team.
Julia Zheng (LEAD DESIGNER) When it comes to web teams, a lead designer is someone who is
capable of performing in various roles of design and is not limited
by tools or media. The disciplines involved in being a web lead
designer include UI/UX developing, visual and graphic design,
interactive design and information structuring. Though they feature
different methods and serve different purposes, these groups still fall
under the umbrella of design. Working with the web manager (and
other team members), the lead designer provides support and
material to meet the manager’s objective. One thing that designers
must be careful of is trying to utilize all of the digital design
elements at once.
James Wong(LEAD The lead developer must still report to those of a higher rank
DEVELOPER) (usually the web management head) while still leading lower-ranked
developers and technical staff members. This role is diverse because
of what it entails and what must be produced under the guidance of
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 12 | 55
the developer. One of the main functions of a lead developer is to
set the standard for which all the coding will be written. They must
be knowledgeable of the analytics required and understand core
digital development principles like digital infrastructure, web
design, and user engagement.
Andy Song (WEB MANAGER) The web manager can be thought of as the general manager of the
web team and the last point of contact before the more corporate
roles. They oversee all of the other departments on the web team
and because of this will have some general knowledge on how to
work the majority of them. There might be a variation of what this
position is called (like Web Product Manager or Webmaster) but the
purpose remains the same: ensure quality content and functionality
of the web content and lead a successful web team.The web
manager can be thought of as the general manager of the web team
and the last point of contact before the more corporate roles. They
oversee all of the other departments on the web team and because of
this will have some general knowledge on how to work the majority
of them. There might be a variation of what this position is called
(like Web Product Manager or Webmaster) but the purpose remains
the same: ensure quality content and functionality of the web
content and lead a successful web team.
Well Designed and Functional. The website site reflects the company, products, services and
ultimately the brand.
Easy to Use.
Optimized for Mobile.
Fresh, Quality Content.
Readily accessible contact and location.
Clear calls to action.
Optimized for Search and the Social Web.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 13 | 55
This part requires you to develop an individual performance plan for a team member using the performance
plan templated provided with this unit.
To develop an individual performance plan, you are required to engage in discussion with the team member.
When engaging in discussion with the team member to prepare a performance plan, you are required to:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 14 | 55
Communication guidelines for the manager
• Work through the discussion prompts below, focusing on issues that you want to discuss.
• During the discussion, you can positively influence the discussion by:
o keeping honest communication going
o being respectful
o taking a positive approach and focusing on the future
o having realistic and reasonable expectations of each other
o seeking and confirming that you both understand what the other is saying by summarising
key points and agreements
• Confirm what has been agreed including any actions such as who will do what and by when.
• Decide what will be recorded and how it will be recorded.
Prepare the performance plan by recording the main points and what was agreed using the template
provided.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 15 | 55
Discussion prompts
What are your objectives, responsibilities and key activities for the year
ahead?
1. Roles and
responsibilities
What elements of your work are you going to focus on improving this
year?
What skills and knowledge will be important to your role this year?
How will your new skills and knowledge be applied to the job?
5. Support Required What challenges might you experience that your manager may need to
be aware of, or assist you with?
What resources/support do you need to get the job done (other than
learning and development activities addressed earlier)?
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 16 | 55
How can your manager assist you to do a good job and possibly perform
even better?
Date: January 5, 2021
Reason: Two website module creation deadlines missed, and complaint received from Department of Coding
who did not receive a response to an email sent twice. Due to poor performance, I am issuing this
performance improvement plan.
Expectations: To effectively manage workload on a daily basis, meet deadlines efficiently, prioritise tasks
and respond to emails in a timely manner. Measured by management observation of performance of tasks.
Suggestions: Operate daily ‘To Do’ check list and a diary. To respond to emails received within 3 working
days. Training in Outlook task lists and calendar. To work shadow colleague James in prioritising his daily
tasks.
Schedule: Outlook training completed every day. Daily to do lists being written. Responding to emails faster,
but further improvement needed. Work shadowing will continue. Review in 2 weeks.
Consequences: Failure to meet the expectations set within this plan by February 7 will result in immediate
termination. If requirements are met by February 7, but the full quota is still not reached by the end of the
following period, you will be written up. There will only be one write-up. Failure to meet expectations in the
third period will result in termination. Standard expected to be achieved within 8 weeks.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 17 | 55
individual performance plan for James Wong
Date: January 5, 2021
Reason: Repeated inaccuracy of research data within 2 weeks, which involving typing errors when
transferring raw data into reports. Due to poor performance, I am issuing this performance improvement
plan.
Expectations: To produce accurate data and to enable meaningful analysis and for research publications.
Suggestions: Employee to double check own work before submission, Keeping records of research carried
out to refer to. Supervisor to also check data against records. To be reviewed during next research project.
Schedule: Further training in writing research papers and handling complex data. Time management training.
Consequences: Standard expected to be achieved within 6 months. Failure to meet the expectations set
within this plan by February 7 will result in immediate termination. If requirements are met by February 7,
but the full quota is still not reached by the end of the following period, you will be written up. There will
only be one write-up. Failure to meet expectations in the third period will result in termination.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 18 | 55
Supervisor Name: Victoria Sun, Human Resources Manager
Date: January 5, 2021
Reason: Last month, you committed to creating 15 new pieces of content but only produced 8, citing
insufficient time and resources. Additionally, you missed deadlines for submission of copy to editors on 4
occasions. This significantly slowed down the creation of assets and content for advertising initiatives.
Expectations: Document your progress on current work items daily, keeping editors and manager informed.
Reduce production time of new copy to 3 hours per 1000 words. Meet all deadlines on time, with a goal of
submitting at least 1 hour in advance.
Suggestions: Take caution in data entry tasks and make sure that all inputs reflect data accurately. Ensure
that data is properly processed and visualizations are accurate. Employee will be required to undergo time
management refresher course.
Schedule: A bi-weekly 1:1 meeting will be scheduled with your manager to discuss initiatives, until the
conclusion of the performance improvement plan in 3 months time. Any further resources needed can be
discussed with your manager.
Consequences: Standard expected to be achieved within 6 months. Failure to meet the expectations set
within this plan by February 7 will result in immediate termination. If requirements are met by February 7,
but the full quota is still not reached by the end of the following period, you will be written up. There will
only be one write-up. As a part of the performance improvement plan you will be accountable for the
following goals over the next 90 days:Determine with your manager a reasonable volume of content to
produce on a monthly basis (suggested 10 pieces of content).
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 19 | 55
Part C: Develop a team performance plan
This part requires you to develop a team performance plan using the performance plan templated provided
with this unit.
To develop a team performance plan, you are required to engage in discussion with the team.
When engaging in discussion with the team to prepare a performance plan, you are required to:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 20 | 55
Communication guidelines for the manager
• Work through the discussion prompts below, focusing on issues that you want to discuss.
• During the discussion, you can positively influence the discussion by:
o keeping honest communication going
o being respectful
o taking a positive approach and focusing on the future
o having realistic and reasonable expectations of each other
o seeking and confirming that you both understand what the other is saying by summarising
key points and agreements
• Confirm what has been agreed including any actions such as who will do what and by when.
• Decide what will be recorded and how it will be recorded.
Prepare the performance plan by recording the main points and what was agreed using the template
provided.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 21 | 55
Discussion prompts
What are the team objectives, responsibilities and key activities for the
year ahead?
1. Roles and
responsibilities
What elements of work is your team going to focus on improving this
year?
What skills and knowledge will be important to the team’s role this
year?
What skills and knowledge do the team need to focus on developing this
3. Knowledge and year?
skills
What learning and development activities will you undertake this year?
How will your new skills and knowledge be applied to the job?
5. Support Required What challenges might your team experience that your manager may
need to be aware of, or assist you with?
What resources/support do the team need to get the job done (other than
learning and development activities addressed earlier)?
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 22 | 55
How can your manager assist you to do a good job and possibly perform
even better?
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 23 | 55
2. Andy Song 21/01/2021 31/01/2021
Monitoring James Wong
position
performance
for self and
stakeholders to
determine
congruence
with
standards,
mission and
goals.
Maintaining a
safe and
affirming
climate
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 24 | 55
Expected Outcome Meets essential functions with highest quality and
(manager/supervisor‘s expectations on timeliness while showing initiative in taking on
the outcome based on the data) more than expected.
Outcome if goals and objectives are not The website design need to be postponed, a new
reached individual performance plan need to be created, a
(identify the consequences and further new performance goal need to be set. Poor
steps if the team fails to satisfy the performance employee need to be reviewed by
standards set by the performance plan) their manager.
This part of the activity requires you to plan for contingencies that could impact the team. To do so, you are
required to prepare a contingency plan using the template provided.
Contingency plan
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 25 | 55
Clients cancel at the last moment Ask a guest speaker to fill in, Project manager
reschedule another time for the
client.
Activity context
Management has approved the performance plans. They have decided that an implementation plan with
regular follow-ups will be the best option to ensure the team is actively involved. The work plan will enable
the new manager, (you), to monitor that the team and individuals are working towards the KPIs and goals
established in the performance plan, mitigate any unforeseen risks at an early stage, and address any
performance issues.
This activity requires you to meet with the ICT team to develop the work plan.
You must prepare the work plan using the template provided.
Before preparing the work plans, you are required to identify the following based on the outcomes of
Activity 1:
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 26 | 55
Facilitate open and respectful communication and collaboration between team members, considering
the needs of those from diverse backgrounds
Discuss the following to prepare the work plan:
o Goals/activities
o Responsibilities
o Success criteria (KPIs) to measure success
o Timeframe to complete the task
o Resources required
Agree on the work plan.
Submit the completed work plan to the trainer/assessor.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 27 | 55
Work plan template:
Action plan
1 Design the logo Manager Director and website No copyright 1 weeks Customise the logo
design manager are responsible design based on client’s
to monitor the design of the Innovative needs.
logo.
Attractive
Photoshop
AutoCAD
2 Create a site design and Project Manager: This person Work smoothly 2 weeks HTML
navigation structure. leads the project team.
No error 3rd Party Resources
Develop functionalities like a
blog, an e-commerce store, or a All browsing support GitHub
CMS successfully. the website
3 Code/ database design Website Design manager Design page 2 weeks GitHub
elements such as
Set up a sandbox server. buttons, call to
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 28 | 55
Managers need to check coding actions, testimonials, JavaScript
run successfully. etc.
4 Organize content and create a Design pages based on layout Review pages with 1 week MS offices
content list. styles and content. clients and get
necessary approvals. Marketing Research
Editors need to take
responsibilities
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 29 | 55
Activity 3: Conduct a coaching session
This activity requires you to conduct a coaching session with the ICT team. The purpose of the coaching
session is to:
To conduct the coaching session, you are required to complete the following two (2) parts:
This coaching session requires you to prepare to conduct the coaching session. To do so, you are required to
identify the following requirements of the coaching session.
Coaching plan
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 30 | 55
Cross collaboration Use the group Slack channel regularly to stay connected, create a collaborate
opportunities that can be status update document or task board
implied to enhance
workplace culture Build strong employee relationships.
KPIs to measure the Check in after one week to se how Slack and status updates are going
achievement of the goal
of the coaching session After Woody’s training session in two weeks, access communication skill
improvement
(any two)
(50-100 words) Disputes can grow from the smallest of issues. Something as inconsequential
as taking someone else’s lunch from the fridge can escalate into accusations of
poor work performance. Once you have an impression of a colleague from a
particular incident, you will look for other examples, however small, to
reinforce that opinion.
Managers find this type of problem difficult to resolve, although there is value
in identifying underlying tensions before things become serious.
3. Communicate respectfully.
Asking people for their co-operation rather than giving instructions, enquiring
about people’s weekends and thanking others for help they have given you
will help you to maintain positive relationships with others.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 31 | 55
Part B: Conduct a meeting to coach the team members
This part of the activity is a continuation of part A. This part of the activity requires you to conduct a
meeting with the ICT team to coach the team members.
The agenda of the meeting is to coach the team members to enhance the workplace culture.
Before the meeting, you are required to prepare a meeting agenda using the template provided.
After the meeting, you are required to complete the meeting minutes template provided.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 32 | 55
Meeting agenda template:
Date/Time: 11/12/2020
Ethan Wa
Topic?
Nei 11/12/2020
Topic?
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 33 | 55
Nei 11/12/2020
Topic?
Decision/s
Action/s if any
Warning letter
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 34 | 55
Meeting Objective:
Woody has struggled with communication and keeping the team updated on his tasks. This has resulted
the lack of visibility and workflow issues, so the coaching session goal is to help Woody develop friendly
relationships with co-workers and move visibility on what Woody is working on
Decision/s
Attendees:
Woody Wu
Nei Zhe
Ethan Wa
Venue:
Sydney Office
Date:
11/12/2021
Ethan Wa Andy Wa
Activity context
The implementation of the ICT project has started. As a manager, you have the responsibility to support the
ICT team during the implementation of the project.
This activity requires you to support ICT team during the implementation of the project. To do so, you are
required to conduct two (2) fortnight meetings with the team members during the implementation of the
project.
The purpose of the meeting is to monitor the implementation of the project and support the team in achieving
team goals.
Minutes of Meeting
Meeting Objective:
Discuss the progress of the project, Support individuals in the achievement of the common team goals
Attendees:
Woody Wu
Nei Zhe
Ethan Wa
Venue:
Sydney Office
Date:
11/12/2021
Ethan Wa Andy Wa
Task-related issues and Actions taken to resolve the task-related issues and inefficiencies
inefficiencies identified (any two)
Stay constructive
Prioritize wisely.
Challenges faced by the team Actions taken to deal with the challenges faced by the team
members (any two) members
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 39 | 55
. Engaged team members who are interested in what they do are
committed to the team mission and willing to going the extra mile.
Low engagement. They are there in body as well as mentally and emotionally. The key
to engagement is involvement; by involving others you make it
impossible to stay detached.
Denial/resistance
Emotional
Hopeful
Commitment
Each stage is needed but how long someone stays at each stage can
be managed and kept to a minimum.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 40 | 55
Meeting minutes template (Fortnight meeting 2):
Minutes of Meeting
Meeting Objective:
Discuss the progress of the project, Support team in the achievement of the common team goals
Attendees:
Woody Wu
Nei Zhe
Ethan Wa
Venue:
Sydney Office
Date:
11/12/2021
Ethan Wa Andy Wa
Task-related issues and Actions taken to resolve the task-related issues and inefficiencies
inefficiencies identified (any two)
Set yourself blocks of time to focus on a task and don’t move onto
something else until you’ve finished. Methods such as the
Pomodoro technique can be a really effective way of helping keep
your focus.
Work from home results working As much as home working is convenient for many as they can coop
inefficiency up in their bed or couch, it becomes challenging to resist the
temptation of sleep with our not-so-healthy sleep routine.
That way, you can either give in to your lethargy - which is highly
demotivating - or decide to come out of the enticement of your
typical home setting. The latter is always better and more
productive.
Challenges faced by the team Actions taken to deal with the challenges faced by the team
members (any two) members
. Not going in the same direction Spend time on this with team. This clarity provides a framework and
reason to be that can rally a team to work together. Keep in mind
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 42 | 55
that visions need to be compelling and purposes meaningful. People
respond to the importance of both.
Lack of trust Team members absolutely need to know each other, both
professionally and personally. Otherwise they won’t understand
each other and they won’t want to engage because they havent made
that human connection so they won’t fully trust each other.
Activity 5: Prepare action plans based on the individual and team performance
Activity context
Management has asked you to evaluate the performance of the team members and provide them with
performance feedback.
This activity requires you to conduct a performance review meeting with the ICT team. This meeting will be
conducted after the second-fortnight meeting conducted during the implementation of the project (Activity
4).
Evaluate the performance of a team member and the ICT team based on the outcomes of activity 4.
Measure the team member’s and team’s performance against the performance plans prepared in
Activity 1.
Identify specific learning and development opportunities to improve the team and individual
performance and behaviours
Prepare a meeting agenda using the template provided.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 43 | 55
Discuss the specific learning and development opportunities to improve team and individual
performance and behaviours.
Prepare an action plan in consultation with the team member and the team. Include the following
details:
o Performance issues
o Learning and development opportunities
o Success criteria (KPIs) to measure success
o Timeframe to learning and development opportunities
o Resources required
Agree on the action plan.
Submit the completed individual action plan to the team member and the trainer/assessor.
Submit the completed team action plan to the ICT team members and the trainer/assessor.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 44 | 55
Individual action plan template:
Performance issues Learning and development Success criteria (KPIs) to Timeframe Resources
opportunities measure success
Lack of knowledge Online learning such as GitHub Yes 11 days Online learning websites
of coding
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 45 | 55
Lack of knowledge development activities such as Yes 5 days Online learning websites
of designing learning HTML
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 46 | 55
Team action plan template:
Performance issues Learning and development Success criteria (KPIs) to Timeframe Resources
opportunities measure success
App Bug Find out the bug area and re-do Yes 8 days Experienced app designers
it
Team commitment Set up bonus if the team can Yes 5 days Internal commitment
complete tasks on time meetings
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 47 | 55
Behind the Improve tasks and distribute to Yes 22 days Slack and Gannt chart to
timeframe right employees again improve timeframe and
tasks
Work Quality Managers need to monitor and Yes 18 days Hardware improvement
check work quality regularly
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 48 | 55
Activity 6: Monitor the outcomes of action plans
Activity context
Management has decided that the manager will a meeting with the team members/team to monitor the
outcomes of the implementation plans. This will help the manager to:
Ensure that the team and individuals are working towards the KPIs and goals established in the action
plan
Evaluate the success of learning and development opportunities.
This activity is a continuation of activity 5. This activity will be conducted after 15 days of the
implementation of the action plan prepared in Activity 5.
The agenda of the meeting is to monitor the outcomes of the action plan and evaluate the success of learning
and development opportunities.
Before the meeting, you are required to prepare a meeting agenda using the template provided.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 50 | 55
Meeting agenda template:
Date/Time: 19/02/2021
(Agenda item 1)
Topic?
Topic?
Topic?
Decision/s
Action/s if any
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 52 | 55
Minutes of Meeting
Meeting Objective:
Discuss if everyone and the whole team complete tasks on time, any further improvements need to
take
Attendees:
Venue:
Sydney Office
Date:
20/02/2021
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 53 | 55
What were the pitfalls?
What will be the further course of action?
What help do you require from the organisation?
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 54 | 55
tasks.
BSBXTW401 Lead and facilitate a team - Assessment 2 - (Updated: September 2021, V. No. 1.0)
P a g e 55 | 55