Professional Documents
Culture Documents
Bore Hole Problem
Bore Hole Problem
1.Calculate the apparent dip from the given true dip. given true dip amount
1:5 direction to-wards east. find the apparent dip amount along N40E, S70E
and S30E.
2. Calculate the true dip from given apparent dips. given apparent dip1:14
dueN45w and 1:20 due N20E
3. True dip direction is due S30E and apparent dip is 1:10 due S10W. What is
the amount of true dips
N
Given, SCALE
True dip(TD)= 1:5 due E 1 UNIT= 1 CM
To find out,
Apparent dip along
N 40 E = ?
40 °
S 30 E = ?
S 70 E = ?
W 1 2 3 4 5
E
70 °
Solution,
Apparent dip along
N 40 E= 1 : 8 30 °
S 30 E= 1 : 11.5
S 70 E =1 : 6
S
THREE POINT PROBLEM
1. In the featureless terrain three bore hole A< B and C are sunk to ascertain the attitude of limestone bed. At point
A limestone bed is reached at a depth of 600 ft, C is at 1800 ft due S10 E of A and limestone is reached at a
depth of 400 ft, B is 1500ft due S45 W of A and the limestone is reached here at a depth of 900 ft, determine
the attitude of limestone bed.
2. In a coal seam a number of drill holes were driven to ascertain the structure of the coal bed . Data are a follows
3. Bore hole were sunk of A, B and C are at the same altitude above mean sea level at the corners of equilateral
triangle which are having sides of 6000ft length . C being west of B, A is north of the mid point between B and
C , a coal seam was encountered at C , depth of 6000 ft in the bore A, 400ft in B , 200 ft in C. Draw a plain
country and determine the attitude of coal seam.
A
W E
75° 8 cm
11 cm 45 °
30 °
5 cm
C
B
S
Q) Three boreholes A, B and C were drilled for limestone reserve
calculation .Bore holes A lies at 600 m distance due N 28 E from bore
holes B. C lies at 400 m die S 10 W from B. The top and bottom of
limestone bed was excavated at the following depth of boreholes.
Calculate the thickness of bed.
A 200 260
B 220 280
C 240 300
N
A (N 28 E)
SCALE
1 CM= 100 m
B E
W 220
Solution,
Attitude of limestone bed strike= N 60 E/ S 60 W
C ( S 10 W) Dip direction= N 30 W
Dip amount,
Tan θ = Vertical distance = 10
Horizontal distance 1.6 *100
-1
θ = tan [10/(1.6*100)] = 3.57°≈ 4°
S Thickness of limestone bed (T)= Cos θ* VT
= cos (4)* 60
=59.8 m
Q) Three boreholes were drilled to find out stable location for dam
foundation of hydroelectric project. The apparent thickness of quartzite bed
was found 220m. The attitude of quartzite was 220/ 36 NE. Calculate the
true thickness.
Given,
Apparent Thickness= 210 m
Dip amount(θ) = 36° 210 m
Then,
True thickness(TT) = Cos θ* VT
= Cos(36)*210 36°
= 1.69 m
?
SCALE
1CM= 100M
Strike= N θ E
Dip amount= 71 SE
Tan θ = Vertical Thickness
Horizontal Thickness
= 50
2.8*100
θ = 10.125
C(100) D(250) True thickness= cos θ* Vertical
thickness