Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

CORPORATE SOSIAL

RESPONSIBILITY PROPOSAL FOR


CONSTRUCTION AND
COMPLETION OF NEW SIMPANG
PANCHING FLYOVER,
INFRASTRUCTURE, AND OTHER
FACILITY ALONG THE FLYOVER Group Project for:
CONSTRUCTION PROJECT
MANAGEMENT
(ECM 743)
Prepared by:
Mohd Farhan Bin Hasan | 2021746429
Muhammad Nurhaziq Bin Mokhtar | 2021588245
Nurul Nabila Binti Mohd Rusli | 2021122457
Azizul Asyraf Bin Abd Aziz | 2021132853
Nur Zayani Binti Zaharudin | 2021715841
Nur Fatin Azarina Binti Nor Affendy | 2021424362

Prepared for:
Profesor Madya Dr Sheila Belayutham

CONSTRUCTION PROJECT MANAGEMENT (ECM743) | CORPORATE SOSIAL RESPONSIBILITY PROPOSAL FOR CONSTRUCTION AND COMPLETION OF NEW SIMPANG PANCHING FLYOVER, INFRASTRUCTURE, AND OTHER FACILITY ALONG THE FLYOVER | GROUP 6 Page ##
INTRODUCTION TABLE OF CONTENT

Corporate social responsibility (CSR) is a


company’s commitment to manage the social,
environmental and economic effects of its 1.0 INTRODUCTION
operations responsibly and in line with public
expectations. In this contemporary era, most of
2.0 BACKGROUND OF PROPOSE PROJECT
the companies had practiced corporate social
and environmental responsibility with a broad
goal. The benefits of CSR such as company can
3.0 PROJECT DEFINITION / CHARTER

establish good reputations, attract positive


attention, save money through operational 4.0 PROJECT PLANNING
efficiency, minimize environmental impacts,
attract top talent and inspire innovation. There
5.0 CURRENT ADVANCEMENTS
are types of CSR and these include philanthropy,
environment conservation, diversity and labour
practices, and volunteerism.
6.0 CONCLUSION

CONSTRUCTION PROJECT MANAGEMENT (ECM743) | CORPORATE SOSIAL RESPONSIBILITY PROPOSAL FOR CONSTRUCTION AND COMPLETION OF NEW SIMPANG PANCHING FLYOVER, INFRASTRUCTURE, AND OTHER FACILITY ALONG THE FLYOVER | GROUP 6 Page ##
2.0 BACKGROUND OF PROPOSE PROJECT

Content (Arial, 12). Content (Arial, 12). Arial Black, 20


Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12). Content
(Arial, 12). Content (Arial, 12). Content (Arial,
12). Content (Arial, 12). Content (Arial, 12).
Content (Arial, 12). Content (Arial, 12).

CONSTRUCTION PROJECT MANAGEMENT (ECM743) | CORPORATE SOSIAL RESPONSIBILITY PROPOSAL FOR CONSTRUCTION AND COMPLETION OF NEW SIMPANG PANCHING FLYOVER, INFRASTRUCTURE, AND OTHER FACILITY ALONG THE FLYOVER | GROUP 6 Page ##

You might also like