Professional Documents
Culture Documents
Setia Precast SDN BHD: Emergency Response and Preparedness Plan
Setia Precast SDN BHD: Emergency Response and Preparedness Plan
Effective date:15.10.20
Status:
1
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
TABLE OF CONTENTS
Item No. Title Page
- TABLE OF CONTENTS
1.0 SECTION 1 4
1.1 Project Information
1.2 Potential Emergency 4
1.3 Emergency Response Team (ERT) 4
1.4 Roles, Responsibilities and Authorities of ERT 5-6
1.5 Delegation of Authority for Interface ERP Activation during Emergency 6
Situation
2.0 SECTION 2
2.1 Emergency Contacts 7-9
3.0 SECTION 3
3.1 List of Emergency Equipment and Facility 9
4.0 SECTION 4
4.1 Emergency Communication Flow 10
4.1.1 Fire / Explosion 11
4.1.2 Landslide/ Structure Collapse 12
4.1.3 Evacuation Communication Flow 13
4.1.4 Major Chemical Spillage 14
4.1.5 Major Injury / Accident 15
4.1.6 General Accident/Vehicle Breakdown on Public Road 16
4.1.7 Flooding 17
4.1.8 Machinery Topple 18
4.1.9 Pandemic (Covid-19) 19-20
5.0 SECTION 5
5.1 Emergency Response Team O-Chart (Overall) i
5.1.1 Emergency Response Team O-Chart (Project) ii
5.1.2 Emergency Response Team Contact No. iii
5.1.3 ERP for Fire/Explosion iv
5.1.4 ERP for Landslide v
5.1.5 ERP for Chemical Spillage vi
5.1.6 ERP for Accident or Incident vii
5.1.7 ERP for Machinery Topple viii
5.1.8 ERP for Flooding ix
5.1.9 ERP for Pandemic (Covid-19) x
2
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
1.0 Emergency Response and Preparedness Amendment Record
3
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
1.0 SECTION 1
Any event such as fire explosion, evacuation, structure collapse, major injury or fatality from
accidents, major chemical spillage, Road Accident / Vehicle Breakdown, Flooding and Heavy
machinery breakdown.
The roles and responsibilities of identified personnel during emergency are clearly defined. The
ERT will be responsible for the following;
• Provision of immediate response to the emergency either to terminate or, if possible contain
the situation until the arrival of external emergency services or assistance;
• Acting as the focal point for the Setia Precast HSE Department emergency management
including imparting training to maintain a high degree of preparedness, conducting drills
and ensuring the effectiveness of the ERP
The project management had established an Emergency Response Team (ERT) comprise of
project staff from various functional areas. (Please refer to Appendix A – ERT Organization
Chart)
4
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
1.4 Roles, Responsibilities and Authorities of ERT
Members of the ERT are detailed in Appendix A. The team is led by the Emergency Manager who
is responsible on ensuring overall safety of the employees and the site. The ERP is initiated by
the Incident Controller. At the scene of the emergency, the Incident Controller is responsible for co-
coordinating the response strategy and he will take immediate actions to reduce or eliminate the
threats of the emergency. The roles and responsibilities for other members of the team are detailed
in the following section.
5
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
7. Alert others either verbally of in healer. Notify the OSC or security
personnal of the incident;
8. Seal of the area to keep other people away from the hazard, always
keeping a safe distance away from the release. Warn fellow workers
about the danger and prevent others from entering into the spill area;
and;
9. Provide first aid to any injured personnel, if able to do so.
7 Maintenance Team 1. Assemble near Fire Control Room.
2. Ensure fire equipments are in good order.
3. Accompany FIRE /SAR teams
8 Security & Traffic 1. In-charge of building security.
Controller 2. Operates from Fire Control Rooms.
3. Ensures vehicle movements are stopped.
4. Ensure clear access for emergency service.
9 Historian / 1. Operates from Fire Control Room.
Recorder 2. Ensures all incidents are recorded in Incident Book.
3. Ensure Incident Book & Training Log are updated.
1.5 Delegation of Authority for Interface ERP Activation during Emergency Situation
The ERP of Facilities Works Contractor should be activated and applied to rescue the victim
during emergency situation. However if the victim is a personnel of System of Works
Contractor, the relevant emergency contact personnel should also be notified.
6
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
2.0 SECTION 2
Project Participants:
7
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
Local Authority
8
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
Contractor
COMPANY NAME / / / FAX REPRESENTATIVE(S) & DESIGNATION
NO
Main Contractor Address: VISTAMORE SDN BHD Project Manager : Tan Chong Yen
NO 1-13, HILL PARK RESIDENCE, E-mail: Cytan@vistamore.com.my
JALAN 1 / 2, 43500, SEMENYIH,
SELANGOR DARUL EHSAN
3.0 SECTION 3
9
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
4.0 SECTION 4
1. Fire / Explosion
In the event of a fire emergency breakout, follow the communication flow attached
2. Landslide/Structure Collapse
Follow communication flow attached
5. Major Injury/Accidents
Follow communication flow attached
7. Flash Flood
In the event of flooding, actions to be taken are listed below:
i. Stop work and assemble all workers
ii. Report to the ER Team/Supervisor involved and alert security
iii. Inspect drainage condition and construct temporary drainage if necessary
iv. For localized flooding, secure all loose drainage if necessary
v. Construct temporary drains and retention ponds to alleviate flooding and prevent
sediment discharge into waterways
vi. Inspect silt trap after flood event and de-silt the silt trap
vii. Inspect and re-instate all damage embankments and also gabion walls
Follow communication flow attached
8. Machinery Topple
9. Pandemic (Covid-19)
Follow communication flow attached
10
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
FIRE / EXPLOSION COMMUNICATION FLOW
Activity Responsibility
Start
End
11
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
LANDSLIDE / STRUCTURE COLLAPSE COMMUNICATION FLOW
Activity Responsibility
Start
Initiate
: ERP and notify ERT members to carry out their
duties. Emergency Manager
.
Emergency Manager
Request first-aider to provide first-aid treatment to
Injured victim(s) Incident Controller
.
. Incident Controller
If required, contact Bomba immediately. Incident Controller
, .
End
12
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
EVACUATION COMMUNICATION FLOW
Activity Responsibility
Start
Evacuate all personnel and workers from the building / Evacuation Controller
premises / site immediately. Direct them to use safe
access and gather at the designated area.
.
Remain at the assembly area until further order from Fire / Floor Marshalls
Emergency Manager.
.
Where situation is safe, give the order to release all
personnel and workers to return to work area or Evacuation Manager
disperse, from the assembly area. .
End .
13
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
MAJOR CHEMICAL SPILLAGE COMMUNICATION FLOW
Activity Responsibility
Start
Emergency Response –
Evacuate all personnel and workers from the vicinity of Evacation Controller
Evacuation
accident .
End
14
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
MAJOR INJURY/ACCIDENTS
Activity Responsibility
Start
Initiate
: ERP and notify ERT members to carry out their
duties. Emergency Manager
.
. Emergency Response -
Evacuation
Evacuation Controller
End
15
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
GENERAL ACCIDENT / VEHICLE BREAKDOWN ON PUBLIC ROAD
Activity Responsibility
INCIDENT
Incident
Incident
End
16
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
FLOODING COMMUNICATION FLOW
Activity Responsibility
Start
Initiate
: ERP and notify ERT members to carry out their
duties. Emergency Manager
.
Evacuate all personnel and workers from the vicinity Emergency Response - Evacuation Controller
of accident. Evacuation
.
Construct temporary drains and retention ponds to Incident Controller
alleviate flooding and prevent sediment discharge.
, .
Inspect slit trap after flood event and de-slit the slit
Incident Controller
trap.
.
Inspect and reinstate all damaged embankments and
gabion structure
.
Improve the drainage system on site
End
17
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
HEAVY MACHINERY TOPPLE COMMUNICATION FLOW
Activity
INCIDENT
END
18
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
PANDEMIC (COVID-19)
19
EMERGENCY RESPONSE AND PREPAREDNESS PLAN
PANDEMIC ERP - Flow Chart to Handle COVID 19
20