Truss - 1 Detail 2: A B C D E F
Truss - 1 Detail 2: A B C D E F
F E D C B A
1 AOR2
8.45
50mm x 100mm x 2mm C-PURLINS
SPACED @ EVERY 0.60m O.C. AOR
7.45
5.90
TOB2
5.45
12mm THK. BASE PLATE PROVIDED
TOB1
WITH 20mmDIA. ANCHOR BOLTS WITH
HUTS AND4.60
WASHERS
2
TRUSS - 1
C-PURLINS
RAFTER - 1
3 TRUSS - 1 DETAIL
TRUSS - 1
RAFTER - 2 12mm ⌀ SAG RODS
2 1 : 100
5.90
RAFTER - 1 RAFTER - 2
75mm x 50mm x 20mm x 6mm THK.
C-PURLINS @ EVERY 0.60m
RAFTER - 2
4
TRUSS - 1
A B C D E
PRE-FABRIACATED STAINLESS
5.90
5 AOR
TRUSS - 1
7.45
TOB2
TOB1
RAFTER - 1
4.60
6
TRUSS - 1
RAFTER - 1 DETAIL
3 1 : 100
AGENCY PROJECT TITLE: SHEET CONTENTS: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHT.SET: SHT.NO:
21/10/2021 5:38:48 pm
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS (COVERED CONSTRUCTION COURT) CONCURRED BY:
QUEZON 3RD ENGINEERING DISTRICT REGION 4A
OFFICE OF DISTRICT ENGINEER ALMA JANE F. GOZO OLIVER P. FORNESTE FERDINAND Y. RICABLANCA MICHAEL P. ROSARIA JORGE C. PASIA
PROJECT LOCATION: Brgy. San Pedro, Mulanay, Quezon ARCHITECT II, PLANNING & ENGINEER II, PLANNING & CHIEF, PLANNING & OIC-ASSISTANT OIC-DISTRICT ENGINEER
CATANAUAN, QUEZON END USER AUTHORIZED REPRESENTAIVE DESIGN SECTION DESIGN SECTION DESIGN SECTION DISTRICT ENGINEER SCALE: AS INDICATED