FROM: Stes Consultants India Pvt. Ltd. To: The Chief Engineer,
"KRISHNA" #58 2nd cross, PIU –Chief
The SHDP, Ground Floor, PWD Annexe,
Engineer,
Chetana colony, Vidyanagar, PIU – SHDP, Ground Floor, PWD Annexe,
Hubballi - 21 K.R.Circle, Bengaluru– 560 001
+9180-22224106 & +9180-22224107
Ladies/Gentlemen:
We, the undersigned, offer to provide the Consulting Services for the above Work in accordance with
your Request for Proposal dated 04/12/2018 22:04:44 and our Proposal. We are hereby submitting
our Proposals, which include this Technical Proposal, and a Financial Proposal through e portal.
If negotiations are held during the Period of Validity of the Proposal, i.e., 90 days. We undertake to
negotiate on the basis of the Proposed Staff. Our Proposal is binding upon us and subject to the
Modifications resulting from Contract Negotiations.
We understand you are not bound to accept your proposal you receive.
We remain,
Yours Sincerely,
Authorized Signature
Name of Firm:
Stes Consultants India Pvt. Ltd.
Address:
"KRISHNA" #58 2nd cross,
Chetana colony, Vidyanagar,
Hubballi - 21
3B CONSULTANT’S REFERENCES
Assignment Name: Consultancy Services for Survey Country:India
investigation and Preperation of DPR for Construction of By-
Pass to Hubli City Connecting NH-218, NH-63 and NH-4.in
Karnataka.
Location within country: Karnataka Key professional staff provided by your
firm/entity (profile): No. of Staff: 1 Team Leader, 1
Material Engineer, 1 Survey Engineer, 1 Highway
Engineer/Design Engineer, 1 Bridge Engineer, 1
Quantity Surveyor, 1 Contract Specialist.
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
1. Mr. G.A.Kadkol
2. Mr. M.F.Junjannavar.
3. Mr. Suresh.Biradar.
4. Mr. B. Pavankumar.
5. Mr. R.B Dixit.
6. Mr. Udaykumar Meti.
Narrative Description of Project: STES Consultants had provided necessary man power and was responsible for
Preparation of DPR for the Construction of By-Pass to Hubli City Connecting NH-218, NH-63 and NH-4.in Karnataka.
Description of Actual Services Provided by your Staff: 1) Team Leader. Over all in charge of the Preparation
of DPR of the Project.
2) Deputy Team Leader: Assisting team Leader in Various aspects in the Preparation of DPR of the Project
3) Highway/Design/Transportation Engineers: To conduct various traffic studies, alignment studies, finalization of
most suitable alignment, to prepare economic analysis.
4) Survey Engineer: To carryout topographic survey, demarcation of alignment, recording OGL’s, recording of L/S
and C/S for Hydraulic particulars of Water courses.
5) Material Engineer: To study and decide suitability of borrow area materials, to conduct necessary tests to
determine engg properties of soil along the alignment etc.,
6) Bridge Engineer: To design various structures on highway.
7) Quantity surveyor: To Prepare cost estimates.
8) Contract Specialist: Responsible for the preparation of Various interim reports as per TOR, Preparation of Contract
documents, compilation of DPR etc,.
Name of Associated Consultants, if any: India No. of months of Professional staff, provided by
International Infrastructure Engineers Ltd., BANGALORE Associated Consultants. N/A
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
1. Mr. G.A.Kadkol
2. Mr. Suresh.Biradar.
3. Mr. Basavaraj Sandigawad.
4. Mr. Ramesh Biradar.
5. Mr. Kashinath Kabadi.
6. Miss Gayathri Naik.
7. Miss Mallika Naik.
8. Miss Gayathri Shetty
9. Mr. Udaykumar Meti.
Narrative Description of Project: STES Consultants India Pvt Ltd had provided necessary man power and was
responsible for Preparation of DPR for the Construction of Roads and Drains in Bagalkot, Badami, Guledgudd, Ilkal,
Hungund and Kerur Urban Local Bodies of Bagalkot District.
Name of Client : The Executive Engineer Project Division No. of staff : 8 No,s
KRRDA, GOKAK
Address :The Executive Engineer Project Division No. of Staff-months, duration of assignment : 3
KRRDA, GOKAK months
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
1. Mr. G.A.Kadkol
2. Mr. Suresh.Biradar.
3. Mr. Basavaraj Sandigawad.
4. Mr. Ramesh Biradar.
5. Mr. Kashinath Kabadi.
6. Miss Gayathri Naik.
7. Miss Mallika Naik.
8. Miss Gayathri Shetty
9. Mr. Udaykumar Meti.
3B CONSULTANT’S REFERENCES
Assignment Name: Country:India
Consultancy Services for Survey investigation and
Preperation of DPR for Construction of Rural Roads in
Haveri District under NGNRY Ph-II (CMRRF)
Address : The Executive Engineer Project Division KRRDA, No. of Staff-months, duration of assignment : 3
HAVERI Months
Name of Associated Consultants, if any: :. N/A No. of months of Professional staff, provided by
Associated Consultants. N/A
Name of Senior Staff (Project Director/Co-ordinator, Team Leader) involved and functions performed:
1. Mr. G.A.Kadkol
2. Mr. Suresh.Biradar.
3. Mr. Basavaraj Sandigawad.
4. Mr. Ramesh Biradar.
5. Mr. Kashinath Kabadi.
6. Miss Gayathri Naik.
7. Miss Mallika Naik.
8. Miss Gayathri Shetty
9. Mr. Udaykumar Meti.
Narrative Description of Project: STES Consultants India Pvt Ltd had provided necessary man power and was
responsible for Preparation of DPR for the Construction of Rural Roads in Haveri District.
Immediately, the receipt of an work order, field team will be mobilized to conduct reconnaissance
survey, Road Inventory Survey & Structure Inventory Survey.
Simultaneously, as per the Contract Conditions required investigations like. Traffic Studies, Road
Condition Survey (BBD, Axel Load Studies) will be commenced.
Topographic Survey as per agreed methodology for proposed ROW will be carried out including
Recording Cross Section Levels etc.
Borrow areas for necessary construction materials will be identify, samples will be collected & tested in
laboratory.
After completion of field activities, Road Design work & Structures Design work will be completed by
adhering to specifications (IRC & IS Codes).
Quantities for various items of work will be computed & cost estimates will be prepared.
Draft DPR’s will be submitted & after scrutiny, we finalised DPR’s will be submitted to client for further
needful.
FORM - 3E
TEAM COMPOSITION AND TASK ASSIGNMENTS
2. Supporting Staff
Education:
Employment Record:
Languages:
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these Data correctly describe me, my qualifications, and my
experience.
Date:
Signature and full name of Staff Member: Authorized and full name representative of the firm:
10th
11th
12th
13th
14th
15th
2nd
3rd
4th
5th
6th
7th
8th
9th
1st
1 Reconnassiances Survey
Road Inventory, Structures
2
Inventory.
Topographic survey including
3 hydrologic survey at
structures location.
4 Other field studies
Preparation of raw data for
5 design of roads and
structures.
Geometric design of roads
6 and structral design of
bridges etc.
Cost estimation and quantity
7
surveying
Compiling report and
8
submission of draft report
Scrutiny and finalization of
9
DPR
Programme
Sl. No Reports
(date)
Inception Report on First
Day of Commencement of
Services containing full
details of deployment of
1 Inception Report office and personnel and
the time of their
mobilization.
Hubballi, 02/15/2022
Ladies/Gentlemen:
We, the undersigned, offer to provide the Consulting Services for the above Work in accordance with
your Request for Proposal dated 04/12/2018 22:04:44 and our Proposal (Technical and Financial
Proposals). Our attached Financial Proposal is for the sum of.
In figure :
In words :
Our Financial Proposal shall be binding upon us subject to the Modifications resulting from Contract
Negotiations, up to expiration of the Validity Period of the Proposal, i.e. 90 days
We undertake that, in competing for (and, if the award to us, in executing) the above Contract, we
will strictly observe the Laws against Fraud and Corruption in force in India namely “Prevention of
Corruption Act 1988”.
We understand you are not bound to accept your proposal you receive.
We remain,
Yours Sincerely,
Authorized Signature
Name of Firm:
Stes Consultants India Pvt. Ltd.
Address:
"KRISHNA" #58 2nd cross,
Chetana colony, Vidyanagar,
SUMMARY OF COSTS
9 Insurance Rs. -