The document outlines 9 proposed priority development projects for the municipality of Culaba in Biliran province, Philippines for budget year 2022, with a total estimated budget of 21,525,734.80 Philippine pesos. The funds for the projects would come from the 20% development fund allocated by the local government unit from its net tax allotment of 107,628,674 Philippine pesos for budget year 2021. The proposed projects include establishing a water reservoir, a core shelter assistance program, constructing a pasalubong center and solar lights, repairing roads and buildings, and loan amortization.
The document outlines 9 proposed priority development projects for the municipality of Culaba in Biliran province, Philippines for budget year 2022, with a total estimated budget of 21,525,734.80 Philippine pesos. The funds for the projects would come from the 20% development fund allocated by the local government unit from its net tax allotment of 107,628,674 Philippine pesos for budget year 2021. The proposed projects include establishing a water reservoir, a core shelter assistance program, constructing a pasalubong center and solar lights, repairing roads and buildings, and loan amortization.
The document outlines 9 proposed priority development projects for the municipality of Culaba in Biliran province, Philippines for budget year 2022, with a total estimated budget of 21,525,734.80 Philippine pesos. The funds for the projects would come from the 20% development fund allocated by the local government unit from its net tax allotment of 107,628,674 Philippine pesos for budget year 2021. The proposed projects include establishing a water reservoir, a core shelter assistance program, constructing a pasalubong center and solar lights, repairing roads and buildings, and loan amortization.
(Funded by the 20% Development Fund by the LGU) Budget Year : CY 2021 Municipality : Culaba Estimated NTA : P107,628,674.00 Province : Biliran For Budget Year: CY 2022 20% of NTA : P21,525,734.80
Amount 1. Establishment of water reservoir Dept. of Tourism 3,400,000.00 for plant Sprinkler & other Farm DPWH tourism production 2. Core Shelter Assistance Program DSWD 500,000.00 Financial Assistance for Completion 3. Construction of Pasalubong DOT 3,500,000.00 Center (Phase II) 4. Solar Light/Plant Box for Baywalk 6,000,000.00 Pavement 5. Construction of Waiting Shed DILG 500,000.00 Bool West 6. Repair/re-blocking of road DPWH 500,000.00 Bool West 7. Purchase of Lot DILG/DPWH 1,800,000.00 8. Repair of social center roofing & DILG 500,000.00 installation of floor tiles of stage flooring 9. Loan Amortization 4,825,734.80 TOTAL 21,525,734.80