HATs CASE STUDY-PIPELINE
Project Inspection Services of Pipeline PL394 Utilizing Hybrid Acoustic Technology System (HATs)
Result
HATs CASE STUDY – PRESSURE VESSEL
Project Technical Capability Trial For Detection Of Stress Corrosion Cracking On Vessel M3-931 Utilizing Hats
Client PETRONAS GAS BERHAD Location Project Gas Processing Plant, Kerteh
Result
Multiplicity of Crossed and Non-Crossed Multidirectional Multiplicity of Crossed Multidirectional Crack-Like Defects
Crack Like Defects Along Circumferential Weld C-1 of C-4, Near Weld C-6 of D-36
Findings No.1 - No.5
HATs CASE STUDY - TANK
Project Inspection services of tank inspection utilizing HATs at MLNG
Client MALAYSIA LNG GROUP OF COMPANIES Location Project MLNG Plant, Sarawak
Objective To identify damage mechanism occurrence on the tank including its roof, shell & bottom.
• 102 external anomalies (LML) were detected on tank’s elements, included: 45 anomalies on the shell, 26 anomalies on the
bottom, 4 anomalies on the annular plate and 26 anomalies on the roof.
• 3 major anomalies were identified to have 40-50% of metal loss. Verification has been conducted at these anomalies
located at the tank roof (DR-12) by using A-Scan and C-Scan UT.
Result
HATs CASE STUDY – TUBULAR
STRUCTURE (CAISSON)
Project Inspection Services of Caisson ME-4800B (C6) Utilizing Hybrid Acoustic Technology System (HATs)
Client REPSOL OIL AND GAS MALAYSIA LIMITED Location Project Bunga Raya-Echo Platform (BR-E)
Result
HATs CASE STUDY - PIPING
Project HATs Inspection Qualification On 10” Pigging Test Loop Facility
Client M&E, PETRONAS CARIGALI SDN. BHD. Location Project INSTEP, Kuala Terengganu
Objective To conduct HATs performance assessment includes, POD, POI and dimension tolerance.
• A total 91 defects with more than 10% metal loss were fabricated on the test spool via reverse CP method.
• HATs inspection was conducted to identify all the defects with tolerance detailed as below;
Methodology
& • Based on HATs inspection result, 86 anomalies were found. Evaluation has been made according to specified parameter as
Result below;
Performance Parameter Result
POD 94.50%
POI 85.70%
Distance From Start Point ±411.7 mm
O'clock Orientation ±12.9°.
External Internal
Surface Location
87.70% 0
• The result shows that HATs performance on detecting the anomalies is fairly good.
MMM CASE STUDY - VALVE
Project Provision Of Metal Magnetic Memory (MMM) For Valve Body Assessment At DL-A
Client PETRONAS CARIGALI SDN BHD Location Project DULANG –A & DULANG-B PLATFORM
Objective To determine SCZs area on the valve body utilizing Stress Measurement method
• Conducted on 8 choke valves & 9 Diverter valves at Header area.
• MMM findings, 6 valves out of 17 units found with Stress Concentration Zones
Methodology
&
Result
7
MMM CASE STUDY –
UNDERGROUND PIPING
Project Provision Of NCMD for detecting localised anomalies on portable water supply network for utility pipeline
Methodology
&
Result
8
MMM CASE STUDY – CUI PIPING
Project CMMM for Aboveground Insulated Piping at Tanjung Sulong Export Terminal
• To determine the area of concern which are prone to have potential failures due to existing Stress Concentration Zones
Objective (SCZs)
• To determine the highest SCZs which need to be further verified using other conventional NDT techniques.
• From the assessment, CMMM inspection shows 154 anomalies were found at insulated piping and verified by visual
inspection, UT Fllaw, UT thickness and Hardness Measurement. The result as per below:-
Methodology
&
Result
9
MMM CASE STUDY - WELDMENT
Project Provision Of Metal Magnetic Memory (MMM) For Weldment Inspection on Piggable Buried Pipeline
Contractor MedcoEnergi E&P Malaka, Acheh Timur Location Project Alur Siwah Central Processing Station (CPP)
• To determine the SCZs area exist on the weldment of 12inch gas pipeline
Objective
• To validate the selected SCZs using volumetric inspection technology such as UTFD and hardness testing
• CMMM was conducted on 5 welded joint in different locations. 36 anomalies were detected by CMMM and 13 selected
anomalies were conducted by UTM & UTFD for validation. CAT I : 6 anomalied were verified (Anomaly 2, 13,16,20,22 and
23), CAT II: 4 anomalies were verified (Anomaly 4, 9, 15 and 18), CAT III: 3 anomalies were verified (Anomaly 14,17 and
25)
• 4 welded joint were verified using UTFD:- WJ42 (Anomaly 16,17,18,20,22 & 23), WJ11A (Anomaly 9, 13,14 & 15), WJ16
(Anomaly 2 & 4), WJ64 (Anomaly 25). From 8 anomalies out of 13 anomalies are Incomplete Fusion (IF).
Methodology
&
Result
Internal 10
MMM CASE STUDY – FLARE
Project Provision Of Metal Magnetic Memory (MMM) For LPG LP Flare Stack S803
Client PETRONAS GAS BERHAD Location Project PGB-TANJUNG SULONG EXPORT TERMINAL
Objective • To determine the area of concern which are prone to have potential failures due to existing SCZs on Flare Stack S-803
• CMMM inspection were indicated that 35 anomalies were detected. CAT I:10 anomalies, CAT II: 13 anomalies, CAT III: 7
anomalies & CAT IV: 5 anomalies.
• 2 anomalies was found correlated with visual finding
Methodology
&
Result
Internal 11
MMM CASE STUDY – PRESSURE VESSEL
Project Provision Of Metal Magnetic Memory (MMM) For Pressure Vessel V-2030
Client PETRONAS CARIGALI SDN BHD-SK GAS Location Project B11P-A Platform
Methodology
&
Result
Internal 12
ULTRASONIC PEENING
TECHNOLOGY CASE STUDY
Project Ultrasonic Peening Field Trial
•To determine critical stress concentration zones (SCZs) area on the parent metal utilizing Stress Measurement method.
Objective •To conduct stress relief treatment on the critical SCZs location using Ultrasonic Peening.
•To determine the effectiveness of Ultrasonic Peening in reducing the critical SCZs location.
• UPS successfully to reduce stress concentration zone areas up to 80% on parent metal.
Methodology
&
Result
13
HYBRID VALVE INSPECTION
TECHNOLOGY CASE STUDY
Project Provision Of HVIT for Pressure Safety Valve PSV P802C
• To determine SCZs area on the valve body utilizing Stress Measurement Method
Objective
• To determine the internal condition of the valve by utilizing Valve Passing Testing
• HVIT sucessfully identified the significant findings of SCZs area and passing condition with an insignificant leak of 0.5 l/min.