Professional Documents
Culture Documents
Piping Daily Progrss Report MMGP: Gulf Asia Contracting Company LLC
Piping Daily Progrss Report MMGP: Gulf Asia Contracting Company LLC
MMGP
PIPING DAILY PROGRSS REPORT
Area: P, P1, M, J1, J2, F, G, H, K, K3, T, L, C, Y, V1, V2, N3, N2, W, 3220, 3310, 3640, 3670, 3210, 39EJ & 39WL Date: 09-02-2022
Pipe Size Spool Erection
SL. No Activity Line No Joint No. Spool No. Support-ID Material Support REMARKS
Installation (Kg)
Inch LM IM
89 Fit Up 150-3750-WRS-AA02-75009-NI 6 12 CS
90 Fit Up 150-3750-WRS-AA02-75009-NI 6 14 CS
91 Fit Up 150-3750-WRS-AA02-75009-NI 6 16 CS
92 Fit Up 100-3660-CWS-AA02-66021-NI-F 4 10 CS
93 Fit Up 80-3660-CWS-AA02-66441-NI-F 3 1 CS
94 Fit Up 150-3750-PSL-AA05-75052-NI-F 6 1 CS
95 Fit Up 150-3750-PSL-AA05-75052-NI-G 6 1 CS
96 Fit Up 150-3750-PSL-AA05-75052-NI-H 6 5 CS
97 Fit Up 50-39EJ-WDW-AQ08-93058-NI-H 2 8 SS
Todays Progress
Total Spool Erection (LM): 322.09
Total Fit Up: 550.50" Welding(ID): 489" Total Support Installation (Kg): 0 Total Bolt Torqueing (ID):