BU Quality Review - Jan 19 Ver 1
BU Quality Review - Jan 19 Ver 1
January 2019
Content
2
2.CQA update
BU Quality Update-MH
1. Highlights/Lowlights
2. Warranty MH Tires Global
3. Quality Goals
4. Action status
1. Highlights/Lowlights : MH
Month Highlights 4
QIS pilot: Project is in the Hypercare stage raising 7 support tickets and 6 has no been closed. The latest version of the QIS
application launch across users. Brief leadership team about the pilot project for best use of its intention and PED in particular
Assembly as part of PDP: We managed the initial framing of the project for assembly process & Scoping document drafted which
will then goes for team approval and include to Ops plan.
Visual RR workshop: Reviewed all tire factory progress towards eliminating type 1 & 2 errors of our FQC employees and establish
as a regular test to perform twice a year followed by corrective actions for employees score >90% RR.
14 CIMs reported for Last 12 months and response time recorded as 9days against target of 15 days.11 CIMs are completed, zero
CIMs reported for the month
Claim Response
time 3 days for
January 2018
Top Cims:
AIR 775 18.00-25
Noisy tires APAC
region
RES ML issues
• Overall claim ratio = 0.11% for the month of January 2018. Actions ongoing in
• 3 months trend line indicate mainly a stable trend. the factory
• YTD value increased due to 25” ind. pneumatic tire claims
(+10% related to 12 month rolling)
3. QUALITY GOALS : MH - January’19
6
Category # Type of Waste_Scrap Unit ETD 1 ETD 2 CV KTD CWD
Scrap II. Bead & Inner heal scrap % of prod. cost 0.00 0.006 0.05 0.04
Scrap III. Green Tire scrap % of prod. cost 0.01 0.061 0.12 - N/A
Scrap Cost
Scrap IV. Flash % of prod. cost 0.99 1.56 1.38 0.31
Total scrap Sc I + II + III + IV + V % of prod. cost 1.13 1.85 2.46 0.50 0.04
K$ 156 90 36 37 -
Full Cost of Quality
4. Actions : MH
Current month
February priorities Target Activities
7
Previous month
January priorities Target Activities
√
Ops plan & KPIs
2 MH SLK Leadership team workshop Alignment with factories
QIS strategy
• Casted wheel supplier, Xinjida visited Loadstar to resolve the Quality issues and pending claims.
• Conducted three supplier audits , two carbon black (Philips and Himadri) supplier and one reclaim supplier (Sun Exim) in India.
• Jantsa supplier visited Loadstar to resolve recurring Quality issues in fabricated wheel.
• Successful BOTR & JLG customers visit with new business opportunities created for market growth.
2. Internal Quality Audit Summary
(rolling 12 months cumulative, Feb18- Jan19)
10
Factory ETD1 ETD2 KTD WMD Total
No of audits conducted 10 10 12 11 43
Target – 84%
2. Internal Quality Audit Summary
(rolling 12 months cumulative, Feb18- Jan19)
Internal Audit Plan Adherence
11
100
98 98 97 97
96 95
93 94 94 94
92 91 91 92 92 92
90 90 90
87 88
83
80
%
70
60
50
18-Feb 18-Mar 18-Apr 18-May 18-Jun 18-Jul 18-Aug 18-Sep 18-Oct 18-Nov 18-Dec 19-Jan
Achivement Target
2. Internal Quality Audit Summary
(rolling 12 months cumulative, Feb18- Jan19)
ETD1 ETD2
100 100 12
94 93 92 92 94 92 92 92 91
90 90 89 90 88 88 88
84 86 84 84 83 84 84
80 81 81 82 82 83 83
81 80 81 81 82 82 83 83
80 80 80 80 79 80 80 80 80
70 70
60 60 61
%
%
50 50
40 40
30 30
20 20
10 10
0 0
18-Feb 18-Mar 18-Apr 18-May 18-Jun 18-Jul 18-Aug 18-Sep 18-Oct 18-Nov 18-Dec 19-Jan 18-Feb 18-Mar 18-Apr 18-May 18-Jun 18-Jul 18-Aug 18-Sep 18-Oct 18-Nov 18-Dec 19-Jan
KTD WMD
100 100
96 96 96 96 95 94 95
94 90 93 92
90 89 90 91 90
89
83 84 84 83 81 82 82 84
83 83 84 84
80 81 81 82 82 83 80 80 80 80 80 81
80 80 80 80 80
76
73 70
70
65
60 60
%
50
%
50
40 40
30 30
20 20
10 10
0 0
18-Feb 18-Mar 18-Apr 18-May 18-Jun 18-Jul 18-Aug 18-Sep 18-Oct 18-Nov 18-Dec 19-Jan 18-Feb 18-Mar 18-Apr 18-May 18-Jun 18-Jul 18-Aug 18-Sep 18-Oct 18-Nov 18-Dec 19-Jan
13
Counter measures
ETD1 7 2 5
KTD 5 5
ETD2 2 1 1
WMD 2 2
Important Changes
• Reduce black compound volume of constructional risky PID s. in order to
mitigate risk of product rejection due to black compound layer distortion. – Initiate
by ETD 1
• Implement vent less Segmented mold with 2 parts for each half. Separation
created to release air but not flash. No drilled vent holes. 15x41/2-8 MAGNUM -
Initiate by ETD 2
• 1st side of the band machining changed to vertical lathe machine form
conventional lath – Initiate by WMD
© 2011 Camoplast Solideal Inc. All rights reserved.
15
16
1. Highlights/Lowlights
2. Quality Dashboard
3. Key issues
4. Action status
1. Highlights/Lowlights : ETD1
Month Highlights YTD Highlights 17
• Introduced 1mm wider line as shown in the bellow • Positive tread on scrap Tires
picture to identify the turn mold.
Implemented size :
21x8-9 Xentra
18
3. Key Issues : ETD 1
19
4. Actions : EDT 1
Current month 20
3 Complete the mounting test for 23x12-12 with 28/02/19 Conduct the test.
6 Beads.
Previous month
January Priorities Target Activities
1 Initiate the Loop 10 world class PFMEA . 31/01/19 Identify the elemental level activities. √
2 Validate the line one new closing press 31/01/19 Track the existing defectives.
√
3 Conduct the barnstorming sessions to identify 31/01/19 Consider the repetitive process issues.
the error proofing devices at Loop 10. √
21
1. Highlights/Lowlights
2. Quality Dashboard
3. Key issues
4. Action status
1. Highlights/Lowlights : ETD2
22
• Modification of 6 presses in cured on line were completed • Scrap tire 0.179% which is 19 % lower than the budget
23
3. Key Issues : ETD2
24
Previous month
1. Highlights/Lowlights
2. Quality Dashboard
3. Key issues
4. Action status
5. Scrap Overview
1. Highlights/Lowlights : CV
Month Highlights YTD Highlights 27
29
High crack quick scrap Manual unloading / machine Problem solving for Crack quick in 8 inch ( weekly basis Project On going
rate of 8 inch (18x7-8, Vent hole position FU )
16x6-8) Quick core design
Demolding speed Reduce demolding speed form 2 to 6 second ( positive
result )
Previous month
January Priorities Target Activities
1. Highlights/Lowlights
2. Quality Dashboard
3. Key issues
4. Action status
1. Highlights/Lowlights : KTD
33
16.9x28 and 18.4x26 bead braking – trials are success and need to be Successfully completed the customer visit (JLG, and BOTR)
take the decision to implement best solution .(Out flaw )
34
Scrap I. Raw Material Cop 0.02 0.02 0.020 0.02 0.01 0.50 1.33
Scrap III. Green Tire scrap Cop 0.01 0.01 0.000 0.01 0.00 - -
Scrap IV. Flash+Trimmed dust Cop 0.31 0.29 0.31 0.31 0.31 1.00 1.09
Scrap V. Scraped tires Cop 0.15 0.13 0.14 0.14 0.14 1.00 1.08
Total scrap Sc I + II + III + IV + V Cop 0.52 0.49 0.51 0.51 0.50 0.98 1.05
FTY ( First Time Yield ) % 98.08 98.08 98.19 97.95 98.65 1.01 1.00
Repair ( In flaw ) % 1.81 1.75 1.75 1.81 1.35 0.75 1.00
Claims ( Out flaw ) ppm 460 430 536 460 523 1.14 1.25
CIM response Time days 4 15 4 15 3 0.20 0.27
BIQ Level II Compliance % 66.5 85 71 70 77 0.91 0.84
Claim out flaw - Total claims -16 ; Solid- 3 (1400x24 MG thermal explosion) ), Air -13 ( 16.9x28 /18.4x26 -Bead braking out-10., )
Actions - bead braking out ; 2 trials are performed well in 2 option final decision take on next week
1. Add the nylon fabric to bead area as the reinforcement - life time is not changed failure were changed to the side wall(cost increased by
.9% 1.37$)
2.Increased the no of ply in the carcass (2plies) - life time is doubled (cost increased by 3.4% (5.2$))
3. Key Issues: KTD
• 18.4 - 26 IND / 12 PR SL R4 CAMSO,18.4 - 26 IND / 12 PR SL R4 CAMSO 35
No Action Status
Add the nylon fabric to the bead area – need to be re
1
validated the change Done and positive the result
2
Increased no of ply in the carcass (2 plies ) Done and positive the result
3
Implement the best solution Pending
3. Key Issues: KTD
36
Steal Band (40x16x30)receiving over 1. Not functioning 2ndery 1.Introduce the gate -06 inspection at steal band Done
the diameter and 3 tires over the max inspection issuing (WMD)
diameter 1. Assume that when 2. (a) Add more free space slots in to the
inadequate collapsing the core expandable parts.
bands get scratch and
accumulate in-between band
and core .
AWP rubber + metal bonding open on Investigation going on 1 . Trial done ( side edge grinding after the tire Done
wheel edge get cold ) result is positive
2. Introduce the solvent to clean the side edges Going on
to improve the detection @ FQC
4. Actions : KTD
Current month
37
February Priorities Target Activities
1 Action implementation for BIQ project – shop floor Remaining people to be completed
people awareness and WSS completion
2 Continue the PFMEA Activities Action proposal for high RPN CFT weekly meeting
3 Actions for bead breaking issues of the 16.9x28 Implement the Corrective action Final decision to be taken
and 18.4x26
4 Action for over expanding the band of 40x16x30 Implement the Corrective action Stopper to be added , increase the c
tires
Previous month
January Priorities Activity Status
1 Action implementation for BIQ project – shop floor More 50 people done , WSS
people awareness and WSS completion 80% completed
2 Continue the PFMEA Activities Action proposal for high RPN 2 Session done
3 Actions for bead breaking issues of the 16.9x28 Implement the Corrective Trials are completed
and 18.4x26 action
4 Action for over expanding the band of 40x16x30 Implement the Corrective Adding extra slots are
tires action completed
38
1. Highlights/Lowlights
2. Quality Dashboard
3. Customer Complain
4. Key issues
5. Action status
6. Supplier COPQ & Other issues
1. Highlights/Lowlights : WMD/WAD/WPD
39
• Supplier quality review process started and • Material (steel ) quality issues of Essar
process continued to control block stock of RM 16/14/12mm due to surface quality – 47 tons in
• Quality circle project continued with focusing blocked stock
COQ • Product audit test : application test are not
• Discussions are continued with R&D and project continued due to que/priority @ R&D
team to included tyre assembly process for • Slow moving paint rejection rate high, due to
PDP forecast / low demand and MOQ –
2. Quality Dashboard: WMD/WAD/WPD-January’19
40
3. Customer Complain- WMD/WAD/WPD
41
Source of
# Date Description Corrective action Status
complaint
BOTR has send Acceptance criteria to
Pin holes in 15 X 5 - Acceptance criteria implemented follow @ the inspection and request to
CIM 666 30.09.2018 BOTR cured on (Casted - FQC record sheet attached on the attached visual inspection report in each
wheel) palate (as customer request) pallet
Acceptance criteria
Note : rejection rate around 2% -3% and discussion going on with supplier to simplify
inspection criteria.
4. Key Issues: WMD/WAD/WPD
42
Organized program on 12,13 and 14th for and 100 nos, staff and other plant team
selected front line production team
2 Conduct session for coating operator Feb’19 Organized training session for 3rd batch
qualification process @ painting line
Previous month
January Priorities Target Activities
1 BIQ – CAMP Feb’19 4 workstations arranged to discuss BIQ focus areas
Propaganda has been organized for shop floor + TQM
campaign on BIQ in Feb’19
2 Prepare corrective actions for external audit Jan’19 - Organize CFT meeting
findings of ISO 9001 & ISO 3834 - Finalize action plan
3 Review incident reporting process and actions Jan’19 - Discussion with production and HR team to
to strength the process action follow up process for incident reporting by
PQC
4 Continue PFMEA process for Painting, assembly Jan’19 - Band welding process action plan prepared for
and rim forming areas + Action finalize for band high RPN and discussion will be planned with plant
welding process management team
6. Supplier COPQ & Other issues
COPQ – Raw material CWD
44
45