Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

GULF ASIA CONTRACTING COMPANY LLC

MMGP
PIPING DAILY PROGRSS REPORT
Area: Pipe Rack P Date: 23-05-2021
Pipe Size Spool Support
SL. Joint No. / Spool
No Activity Line No No. Support-ID Material Erection Installation
Inch LM Kg

1 Pipe Fitup 200-39AA-IAS-AQ08-97035-NI_P 8 4 - SS - -

2 Pipe Fitup 200-39AA-IAS-AQ08-97035-NI_P 8 18 - SS - -

3 Pipe Welding 150-39EJ-WDW-AQ08-93017-NI-P 6 5 - SS - -

4 Pipe Welding 200-39AA-IAS-AQ08-97035-NI_P 8 4 - SS - -

5 Spool Erection 200-39AA-IAS-AQ08-97035-NI_P 8 S10 - SS 1.4 -

10

11

12

13

14

15

16

17

18

19

20

Total Fit Up: 16" Welding(ID): 14" Total Spool Erection (LM): 1.4 Total Support Installation (Kg): Total Bolt Torqueing (ID):
Remarks
Manpower
SL No. TRADE MANPOWER
1 PIPE FITTER 7
2 PIPE FABRICATOR 1
3 RIGGER 4
4 HELPER 1
5 PIPING FOREMAN 1
6 PIPING SUPERVISOR 2
7 MATERIAL CONTROLLER 1