ProMablocks1.2 ScopeStatement
ProMablocks1.2 ScopeStatement
Terms of use
As any other ProMablocks tool or
service, this document is subject to
terms of use. Using this document,
means agreement with the terms of
use in their current state. The contents
of the terms of use can change
What is this document about? without notice. It is the responsibility
The scope defines the functions and features of the final of the user, to maintain updated about
product (or service) of your project. the terms of use in its current state.
Consult the current state of the terms
of use, by clicking the following
button:
When and how should I use this document?
The scope statement is first defined in an early stage of
the project, so that right from the start it is clear what
should be achieved and what not. Besides a clear
description of what is included, the scope statement
also contains a description of deliverables, exclusions, Terms of Use
assumptions and constraints that might apply. All these
aspects of the scope can be described on the Statement
sheet. Make sure that all stakeholders agree on it, so
that future disagreement and conflicts can be avoided.
Throughout the project, changes can occur that affect The wedding of John and Lisa
the scope. Therefore, this document should be updated In order to make it easier to
whenever the scope changes. understand, you can find example
entries in certain parts of this
See comments on spread sheet cells for more specific document. These example entries
and detailed help. always relate to the wedding of John
and Lisa (considered as a project).
Hopefully, these examples give you a
quick insight and help you to get
started. Once understood, you can
delete these example entries of
course.
Inserting columns
Columns can be inserted anywhere, by
an inserted column will take the same c
your new column, this means that you w
Ratings
The following ratings classify this document in various ways.
Terms of Use
Level of required expertise
This rating indicates the level of project management expertise that
is needed for working with this document.
g rows
eet that does not contain any formulas (absence of dark red column headers), inserting a new row is easy.
t click on a selected row and choose insert.
eet that contains columns with formulas (presence of dark red column headers), inserting a new row is not
, since formulas are hidden and blocked from access. Nevertheless, you can follow the next steps if you
g rows
eet that does not contain any formulas (absence of dark red column headers), inserting a new row is easy.
t click on a selected row and choose insert.
eet that contains columns with formulas (presence of dark red column headers), inserting a new row is not
, since formulas are hidden and blocked from access. Nevertheless, you can follow the next steps if you
add a new line somewhere within an existing block of data:
he row where you want to insert a new line, select the existing data and copy it (not cut) one row lower.
u can not include formulas when you select data, you will have to repeat this step for the each block of
acent to columns with formulas.
ove the data in the row where your new line will be. Or just overwrite the data in this row.
g columns
s can be inserted anywhere, by a right clicking on a selected column and choosing insert. Keep in mind that
ted column will take the same characteristics of the column that precedes its. Depending on the content of
w column, this means that you will have to carefully choose where to insert it.
Deliverables
The following deliverables are included in the project:
· Invitation of guests.
· Arrangement of ceremony at town hall.
· Arrangement of reception at castle.
· Arrangement of transport for John and Lisa.
· Photo shooting session.
Acceptance criteria
All deliverables must meet the requirements, as agreed upon with John and Lisa.
Exclusions
The following activities are not included in the project:
· Organization of bachelor parties.
· Organization of honeymoon.
· Acquirement of wedding rings.
Constraints
The following constraints apply:
· The budget is 26.000 Euros.
· The maximum number of guests is 160.
· The wedding will be on 23 September 2017.
Assumptions
The parents of John and Lisa will cover for unexpected costs.