Professional Documents
Culture Documents
TA2860 RHI SI ZZ DR N 3001 Pipe Hydrant Piping Route Site Layout Temporary
TA2860 RHI SI ZZ DR N 3001 Pipe Hydrant Piping Route Site Layout Temporary
Hydrant (FH)
N Sprinkler (SPR)
ay
SprinklerDrain (SDR)
m
30
See Portable Fire Extinguisher Layout Ground Floor
r=
Reffer To Dwg No : TA2860-RHI-B11-00-DR-N-3001
PIPING PIPE SIZE
XX - XXXX - XXX - XXXX
See Fire Hydrant & Portable Fire Extinguisher Layout at Ground Floor
POS
Reffer To Dwg No : TA2959-RHI-B09-00-DR-N-3001
B9.01
B11 B9.02
45 PRESSURE RATING
PIPING MATERIAL CLASS
m
SERVICE IDENTIFICATION
30
150- :-900
B09
BOP
PIPE SIZE
r=
FF-C
PLN ROOM
B.11.00.001 B9.B
27.4 m²
+0.200
S
STORAGE WASTE B3
+0.200
BA.00.009 BA.00.010
CB2
from road level OHB LEGEND : REFER TO DWG : -TA2860-RHI-XX-XX-DR-M-0201
SCV
FD FD
B9.A
150-FF-CS 150-FF-CS 150-FF-CS -TA2860-RHI-XX-XX-DR-N-0201
BOP:300 BOP:-900
FD
BOP:-1100
100-FF-CS
CB3
150- :-900
BOP
CB3 SUMPIT
OTISTA ROAD
150-FF-CS
BOP:300
FF-C
B10.C
SECURITY
ROOM
+0.300
12
13
B10
from road level
PANEL & CCTV
ROOM
1
TOILET
-0.070
B10.A
CAR
PARKING See Fire Hydrant & Portable Fire Extinguisher Layout at 2nd Floor
150-FF-CS
BOP:300
SCV
SCV
m
GUEST
30
PARKING
r=
B4.01
6 UNITS
5235
05
6
B4.B
B4.A
WATER TANK
TARGET CAPACITY CB1
150 M3
150-FF-CS
BOP:-800
CB2 CB1
150- :300
.0
5
BOP
OHB
FF-C
CB1
SALON AREA LAUNDRY/ FABRIC HOME
MEETING ROOM
FUTU (617.99
See Fire Hydrant Installation Layout Ground Floor
PANTRY CARE
150-FF-CS
S
Reffer To Dwg No : TA2860-RHI-B03-00-DR-N-3001 CB2A BOP:-800 CB2
B02 = 2ND FLOOR OFFICE JIC BUILDING
CB1 STORAGE
B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
RE R
CB2A B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
PERSONAL WASH B09 = WASTE STORAGE BUILDING
CLINIC B10 = SECURITY BUILDING
m
VIEWING FGD ROOM 19.6 M2
CB2A R. EVALUASI
TOILET
B11 = PLN BUILDING
30
GAS 29.4 M2
OAD 2)
B01
FOR MAN
ROOM
BOTTLE
150-FF-CS
21.2 M2
BOP:-800
STORAGE
r=
MAIN ENTRANCE STABILITY ROOM
B11B09
MAINTENANCE TOILET
WIDE
LOUNGE &
m
150-FF-CS
RECEPTIONIST
BOP:300
150-FF-CS
ENTRANCE 22.2 M2
BOP:-800
B03 LABORATORY
NING
PANTRY +0.300 PREP. ROOM TESTING ROOM
from road level 15.7 M2 18.6 M2
B10
MVMDB shaft FEMALE SCV
TOILET
VACANT ROOM
OFFICE STAFF SOAP LAB COLLECTING B02
38.9 M2 38.3 M2
Jala
53.9 M2 PIT
OHB B04
OFFICE MANAGER
MALE TOILET 15.9 M2
TRAFO
BLDG SETBACK
ROOM
GV 150-FF-CS B03
CB1
CB1 BOP:300
CB1 CB1
KEY PLAN
150-FF-CS
BOP:300
© 2013 HaskoningDHV Nederland B.V. All intellectual property rights among which the copyright related to this drawing shall vest
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior
I&B
Drw.Nr. TA2860-RHI-SI-ZZ-DR-N-3001
in
2/7/2022 2:33:30 PM
BIM 360://TA2860 IFF Relayout Otista JKT/TA2860-RHI-SI-ZZ-M3-V-0001_Site.rvt