demand is dependent.
For many end-use items, demand is
independent.
Key Differences among
Approaches to Managing Inventory
Of the inventory management processes in
this chapter, JIT, MRP and MRPII are
generally associated with items having
dependent demand.
Alternatively, DRP and the EOQ models are
generally associated with items exhibiting
independent demand.
Key Differences among
Approaches to Managing Inventory
Pull versus Push
Pull approach is a “reactive” system, relying
Q = √ 2 RA or Q = √ 2RA or Q = √ 2RA
VW or S VW S
Fixed Order Quantity Approach
(Condition of Certainty): Simple EOQ
Model
Q= √ 2 RA or Q= √ 2RA or Q= √ 2RA
VW or S VW S
√ 2*3600*$200 √ 2*3600*$200
$100*25% $25
intentions.
Examine out Figure 7-9.
Note the variability in lead times and
demand.
Figure 7-9 Fixed Order Quantity Model
under Conditions of
Uncertainty
Fixed Order Quantity Approach
(Condition of Uncertainty)
Reorder Point – A Special Note
With uncertainty of demand, the reorder
100 0 10 20 30 40 50 60
110 -10 0 10 20 30 40 50
120 -20 -10 0 10 20 30 40
130 -30 -20 -10 0 10 20 30
140 -40 -30 -20 -10 0 10 20
150 -50 -40 -30 -20 -10 0 10
160 -60 -50 -40 -30 -20 -10 0
Table 7-3 Possible Units of Inventory
Short or in Excess during Lead Time with
Various Reorder Points
Reorder Points
Actual Proba-
Demand bility 100 110 120 130 140 150 160
Q= √ 2 R(A + G)
VW
√ 2 * 3600 * ($200 + 8)
$100 * 25%
approximately 6.5%.
The greater the dispersion of the probability
interval approach.
“C” items best suited to a irregular
Planning)
DRP (Distribution Resource Planning)
Time-Based Approaches to
Replenishment Logistics: JIT
Definition and Components of JIT Systems - designed
to manage lead times and eliminate waste.
Kanban - refers to the informative signboards on
location
Quality stressed throughout supply chain
chain
Time-Based Approaches to
Replenishment Logistics: JIT
Examples of JIT Successes:
Apple Computer’s increase in IT from 10 weeks
to 2 weeks resulted in 18-month $20 million
payback on plant.
GM increased production by 100%, but
inventories increased by only 6%.
Norfolk Southern mini-train hauls direct from
one GM plant to another without switching
delays.
Ryder handles all inbound logistics for Saturn.
Figure 7-12
The Orderly Pickup Concept
Time-Based Approaches to
Replenishment Logistics: MRP
A Materials Requirements Planning (MRP)
system consists of a set of logically related
procedures, decision rules, and records
designed to translate a master production
schedule into time-phased net inventory
requirements for each component item
needed to implement this schedule.
MRPs re-plan net requirements based on
changes in schedule, demand, etc.
Time-Based Approaches to
Replenishment Logistics: MRP
Goals of an MRP:
Ensure the availability of materials,
MRP program
1 Egg Timer
1 Gram of Sand
Table 7-7 Inventory Status File:
MRP Egg Timer Example
Gross
Product Inventory Net Req. Lead Time
Req.
Egg Timers 1 0 1 1
Ends 2 0 2 5
Supports 3 2 1 1
Bulbs 1 0 1 1
Sand 1 0 1 4
Figure 7-15 Master Schedule: MRP
Egg Timer Example
Time-Based Approaches to
Replenishment Logistics: MRP
Principal advantages of MRP:
Maintain reasonable safety stock.
demand.
Coordination of materials ordering.
production schedules.
Time-Based Approaches to
Replenishment Logistics: MRP
Principal shortcomings of MRP:
Computer intensive.
fluctuations in demand.
Frequently become quite complex.
Where:
n = number of existing facilities
1
Structure of ECR
Grocery industry estimates U.S. savings at
approximately $30 billion.
“Ultimate goal is a responsive, consumer-driven
system in which distributors and suppliers work
together as business allies to maximize consumer
satisfaction and minimize cost. Accurate
information and high-quality products flow through
a paperless system between manufacturing and
check-out counter with minimum degradation or
interruption…”
Figure 7-19 Efficient Consumer
Response: Broad Operating Capabilities
Tailored to Each Unique Partner
Chapter 7:
Summary and Review Questions
Students should review their knowledge of the chapter
by checking out the Summary and Study Questions
for Chapter 7.