Installation Checklist FREE PORT1
RBS-6102
SECTOR: 1 UMTS-900 (U900 SERVICE) DATE OF HAND OVER________________________
Description Y N Remarks
Network Technology
1 Antenna reference: KATHREIN
2 Antenna numbers: KATHREIN
3 Antenna numbers: KATHREIN
4 Azimuth: OK
5 Mechanical Tilt: 0 OK
6 Existence of a mechanical tilting kit on Antenna? OK
7 Optical Fibre cables labelling Done? OK
8 Jumper connections Sealed with Waterproof? OK
9 Fibre optic cables routed through Feeder clamps to OK
prevent damage?
10 RRUS grounding installed and connected to site Main OK
Earth Terminal (MET)/Tower Leg?
11 RRUS properly aligned and Solar Shield facing Sun? OK
12 Antenna cables tightened and sealed? OK
13 Jumper connections sealed and Labelled as a required sector? OK
14 Optical cables properly connected, labelled, and OK
strapped to RRU*2219 and DUW?
15 Antenna system installed as specified by the N/A
Optimization sectional Data given?
16 Antenna brackets compatible with the mast or pole (no N/A
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly? OK
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 1/7
Implementation Checklist-U900 Phase-2- 2021
4 Azimuth: OK
5 Mechanical Tilt: 0
6 Existence of a mechanical tilting kit on Antenna? OK
7 Optical Fibre cables labelling Done? OK
8 Jumper connections Sealed with Waterproof? OK
9 Fibre optic cables routed through Feeder clamps to OK
prevent damage?
10 RRUS grounding installed and connected to site Main OK
Earth Terminal (MET)/Tower Leg?
11 RRUS properly aligned and Solar Shield facing Sun? OK
12 Antenna cables tightened and sealed? OK
13 Jumper connections sealed and Labelled as a required sector? OK
14 Optical cables properly connected, labelled, and OK
strapped to RRU*2219 and DUW?
15 Antenna system installed as specified by the N/A
Optimization sectional Data given?
16 Antenna brackets compatible with the mast or pole (no N/A
Network Technology
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly? OK
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 2/7
Implementation Checklist-U900 Phase-2- 2021
Network Technology
16 Antenna brackets compatible with the mast or pole (no N/A
risk for corrosion or falling?
17 RRU-2219 is terminated in the correct position and labelled? OK
18 Ground cable is connected to RRUS with M8 nut and tightened OK
using feeder clamps brackets/C-clamps?
19 Power socket is securely and correctly attached to RRUS OK
and sealed?
20 DUW in cabinet IDL cables labelled TO and Forth N/A
source?
21 RRU-2219 Power cables connected to earth via kits? OK
22 RRU-2219Power cable to Breakers terminated accordingly?
23 DUW/DUG F-port cable label to and forth? N/A
24 2nd DUW 4101 Label, Eg: U-900 DUW? N/A
25 Power source to 2ND DUW label from PDU? N/A
RBS-SECTION:
Description
1 RBS Type: 6102/6630
2 RBS configuration BB6630(GU900/1800 + U2100)+BB6620(L800+L1800)
3 RBS Serial Number
4 DUW TYPE: N/A
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 3/7
Implementation Checklist-U900 Phase-2- 2021
Network Technology
A Generator 1 N/A
1 Model: PERKINS 13.5KVA N/A
2 Serial number: N/A
3 Rating Power N/A
4 Hour meter: N/A
B Generator 2 N/A
1 Model: N/A
2 Serial number: N/A
3 Rating Power: N/A
4 Hour meter: N/A
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 4/7
Implementation Checklist-U900 Phase-2- 2021
Description Y N Remarks
1 Generator Hi temperature tested N/A
2 Generator low lube oil pressure tested N/A
3 Generator over speed tested N/A
4 Generator auto start tested (3 start) N/A
ATS Y: YES / N: NO
Description Y N Remarks
1 ATS install at correct position N/A
2 ATS cable connection done and proper. N/A
3 ATS tested correct N/A
4 ATS connected to ground N/A
DC POWER SUPPLY
Description
Network Technology
1 MAKER HAUWEI
2 MODEL IDU-300A MAX.
3 TYPE POWER CUBE 1000
4 # MODULES DU-48DCV
5 Battery type DCB-500B
6 MAKER AGISSON
7 MODEL R4850N
8 CAPACITY 500Ah-48VDC
9 QTY OF BATT. 48PCS.
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 5/7
Implementation Checklist-U900 Phase-2- 2021
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.
Network Technology
NAME: MTN-REPRESENTATIVES: GRD -INTEGRATOR
Signature: Signature:
Ref: U900- Hand-Over Checklist:……/.............2021 Site Name: FREE PORT 1 page 6/7
All rights reserved. Passing on or copying of this document, use and communication of its contents is not permitted without written authorization from Lone Star Cell MTN.
page
7/7
Network Technology