KC Me Eer 031 Rev. 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

1 2 3 4 5 6 7 8 9 10 11 12 13 14

19 20 21 22 23 24 25. 26
A 1" A
4-Ø
01
BR
5000 5000 5000 5000 5000 5000 5000 C- CONECTA A LINEA DE AIRE
SA COMPRIMIDO EXISTENTE
SAC-BR014-Ø1"

MAQUINA RECARD SA
E A C C-
BR
01
3-Ø SA
1" C-
BR
D D 01
2-Ø
1"
0.00 SAC-BR013-Ø1"

CONECTA A LINEA DE AIRE


B 1" B
COMPRIMIDO EXISTENTE 2-Ø
01
BR
VIENE C-
SA
SAC-BR014-Ø1" LINEA SAC-BR001-Ø1"

1470
PLANO: KC-ME-EER-026
ÁREA DE TALLER DE
CALDERAS ELECTRICISTAS
686 1333 SA
C-

1091
BR
01
2-Ø
1"
C C

SAC-BR010-Ø1"
SAC-BR014-Ø1"

C C
7606

3870
0.00 1"
5520

SA
C- -Ø
BR 10
01 B R0
TUB. DE AGUAS
1-Ø C-
CALDERO #3 CALDERO #2 CALDERO #1
1" SA
RESIDUALES DN150
5000

BONO 2 BONO 1 APIN

154
EXISTENTES 1"
0-Ø
01
BR

495
-
S AC VIENE
SA LINEA SAC-BR001-Ø1"

154
154 C- " PLANO: KC-ME-EER-026
BR
01 1- Ø1
616

SAC-BR014-Ø1" SAC-BR013-Ø1" 1-Ø 01

SAC-BR010-Ø1"
1" BR
C-
SA
122 635

D B SAC-BR013-Ø1" SAC-BR012-Ø1"
B D

270
D 1178 1927 3634 280 4720
1033 280 D
VISTA 3D

1995
11739 0.00
E

CALLE FACIALES
16763
15000
5000

370
SAC-BR012-Ø1"
ALMACEN DE
MAESTRANZA

SAC-BR010-Ø1"
E PLATAFORMA E

12089
DE ACCESO

A A
10401
0.00
MAESTRANZA
7365

662 650

TANQUE DE
PETROLEO
5000

OFICINA DE
SAC-BR012-Ø1"

SAC-BR011-Ø1"
0.00
CALDERAS
F VALIDO PARA F

CONSTRUCCION
X X
671

671
SAC-BR012-Ø1" SAC-BR011-Ø1" SAC-BR011-Ø1" SAC-BR011-Ø1"
B 650 14450 5260 671
B
CALLE LAS BOBINAS
21321 100 190
A C
G 5000 5000 5000 5000 5000 5000 5000 PLANOS DE REFERENCIA : G
KC-ME-EER-026 PIPING DE SUNISTRO DE AIRE COMPRIMIDO ISLA DE COGENERACION

19 20 21 22 23 24 25
25. 26
LEYENDA:
BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1
PLANTA NIVEL -0.00 SEGUN CLASIFICACION AASHTO e = 150 mm
ESCALA 1: 75
CARPETA ASFALTICA EN CALIENTE e = 150 mm
H GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
SOLADO
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)

TIERRA ORIGINAL

TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE


100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm

PIPING DE SUMINISTRO DE AIRE COMPRIMIDO


I I
NOTAS:
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88
DE AIRE COMPRIMIDO
ENTR.
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR PLANTA DE PAPEL
DIBUJÓ ---
FECHA 0 06.12.2018 VALIDO PARA CONSTRUCION APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 3 1 1 --- KC-ME-EER-031 1/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

A A

D C B A X
5020 5000 5000 5000

B B

C EXISTENTE PROPUESTA C

10402

2366 8036

269 1996 370 7365 671


MANIFOLD
EXISTENTE
5.82 SAC-BR012-Ø1" SAC-BR012-Ø1" SAC-BR012-Ø1" 5.82

D D

700

840
5.12 SAC-BR012-Ø1"

PLATAFORMA
DE ACCESO
SAC-BR012-Ø1"
SAC-BR012-Ø1"

E E

5819

5819
CALDERO #1
APIN

5119

4979
ESCALERA DE
ACCESO

F VALIDO PARA F

CONSTRUCCION
0.00 0.00

PLANOS DE REFERENCIA :
G SECCION A-A G
ESCALA 1: 40 KC-ME-EER-026 PIPING DE SUNISTRO DE AIRE COMPRIMIDO ISLA DE COGENERACION

LEYENDA:
BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1
SEGUN CLASIFICACION AASHTO e = 150 mm
CARPETA ASFALTICA EN CALIENTE e = 150 mm
H GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
SOLADO
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)

TIERRA ORIGINAL

TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE


100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm

PIPING DE SUMINISTRO DE AIRE COMPRIMIDO


I I
NOTAS:
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88
DE AIRE COMPRIMIDO
ENTR.
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR PLANTA DE PAPEL
DIBUJÓ ---
FECHA 0 06.12.2018 VALIDO PARA CONSTRUCION APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 3 1 1 --- KC-ME-EER-031 2/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

22 23 24 25 26
5000 5000 5000 5000

A A

21321
15390 5931
SAC-BR012-Ø1"
650 14450 100 190 5260 671 154
5.82
840

B B
4.98 4.98
SVP-BR012-Ø6" SVP-BR011-Ø6" SVP-BR011-Ø6"

EQUIPOS A REUBICAR

1979
POR INTERFERENCIA
DE TUBERIAS
SAC-BR011-Ø1"

SAC-BR011-Ø1" SAC-BR001-Ø1" 3.00


C C

4976
SAC-BR010-Ø1"

2997
VIENE
D LINEA SAC-BR001-Ø1" D
PLANO: KC-ME-EER-026

0.00 0.00 0.00

SECCION B-B
ESCALA 1: 40

E E

X A B C D

5000 5000 5000

F VALIDO PARA F

CONSTRUCCION
SAC-BR011-Ø1"

4.98
TUB. DE AGUASRESIDUALES
DN150
EXISTENTE
TUB. CONTRA INCENDIO
SAC-BR011-Ø1"

DN 100

G
EXISTENTE 16763
PLANOS DE REFERENCIA : G
1979

671 15000 1091 KC-ME-EER-026 PIPING DE SUNISTRO DE AIRE COMPRIMIDO ISLA DE COGENERACION
12089 154 495 154 3870

3.00 SAC-BR011-Ø1" SAC-BR010-Ø1" SAC-BR010-Ø1" SAC-BR010-Ø1" 3.00


LEYENDA:
BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1
4976

SEGUN CLASIFICACION AASHTO e = 150 mm


CARPETA ASFALTICA EN CALIENTE e = 150 mm

SAC-BR010-Ø1"
H BANDEJA GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
2997

2997
SOLADO
CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)
VIENE
LINEA SAC-BR001-Ø1" TIERRA ORIGINAL
PASES PARA PLANO: KC-ME-EER-026
BANDEJAS TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE
0.00 0.00 100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm

PIPING DE SUMINISTRO DE AIRE COMPRIMIDO


I I
CANALIZACION
DE TUBERIAS
NOTAS:
SECCION C-C 1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
ESCALA 1: 40
2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88
DE AIRE COMPRIMIDO
ENTR.
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR PLANTA DE PAPEL
DIBUJÓ ---
FECHA 0 06.12.2018 VALIDO PARA CONSTRUCION APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 3 1 1 --- KC-ME-EER-031 3/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

19 20 21 22

A A

11739

1178 1927 3634 280 4720

SAC-BR013-Ø1" SAC-BR012-Ø1" 5.12

B B

SAC-BR013-Ø1"

2080
3.42 SAC-BR014-Ø1"

SAC-BR014-Ø1" SAC-BR013-Ø1" 3.04

588
2.83

211
2.83

5119
SAC-BR014-Ø1"
C C

3417

2828

2828
CALDERO #3 CALDERO #2 CALDERO #1
0.00 0.00
D D

SECCION D-D
ESCALA 1: 40

D C B
E E

F 7606 VALIDO PARA F

1470 5520 616 634 122


CONSTRUCCION

SAC-BR013-Ø1"

5.12

4.75

364
G PLANOS DE REFERENCIA : G
KC-ME-EER-026 PIPING DE SUNISTRO DE AIRE COMPRIMIDO ISLA DE COGENERACION

SAC-BR013-Ø1"
SAC-BR014-Ø1"

1716
3.53
3.42 3.42
LEYENDA:
115

BASE DE AFIRMADO O SUELO GRANULAR TIPO A-1


3.04
588

SEGUN CLASIFICACION AASHTO e = 150 mm


691

211
SAC-BR014-Ø1" SAC-BR014-Ø1" CARPETA ASFALTICA EN CALIENTE e = 150 mm
2.83

5119
H GRAVA MUY GRUESA 32-64 mm PARA DE DRENAJE NATURAL H
CONECTA A LINEA DE AIRE SAC-BR014-Ø1"
COMPRIMIDO EXISTENTE SOLADO
3532

CONCRETO ARMADO f'c=280 kg/cm2 (27.5 MPa)


3417

2828

2828
TIERRA ORIGINAL
2726

TIERRA ORIGINAL CERNIDA Y COMPACTADA EN SUBCAPAS DE


100-150 mm CON ELIMINACION DE PIEDRAS MAYORES A 75 mm

PIPING DE SUMINISTRO DE AIRE COMPRIMIDO


I 0.00 0.00 I
NOTAS:
1. LAS DIMENSIONES ESTAN EN MILIMETROS (S.I.C.)
SECCION E-E 2. LAS COTAS SON RELATIVAS, CON NIVEL 0.00 CORRESPONDIENTE AL
ESCALA 1: 40 PISO TERMINADO DE CIRCULACION EN LA ISLA DE COGENERACION

DIB. PROYECTO
M.SANTIAGO PROYECTÓ ---
Solange Freyre
Kimberly Clark Perú SRL INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

Av. José Gálvez Barrenechea N° 223/225 CON.


San Isidro - Lima 27 - Perú CIP. N° 157182 REVISÓ ---
OBRA DETALLE
Teléfono: +51 1 - 224 82 94 Dr. Roland Schmidt
J +51 1 - 224 91 11
CIP. N° 1993-T APROBÓ --- INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO J
Telefax: +51 1 - 226 71 88
DE AIRE COMPRIMIDO
ENTR.
1 30.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR 8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR PLANTA DE PAPEL
DIBUJÓ ---
FECHA 0 06.12.2018 VALIDO PARA CONSTRUCION APM SAM SCR
LUGAR: LIMA NUMERO DEL PLANO REVISION
: DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO REV. FECHA MO D IF ICA C IO N ES EJECUTÓ REVISÓ APROBÓ
FECHA: 30.01.2019 K C ME E E R 0 3 1 1 --- KC-ME-EER-031 4/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

N
A A

B B

C C

D D

E
VALIDO PARA E

CONSTRUCCION

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
ENTR.
1 31.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO
0 06.12.2018 VALIDO PARA CONSTRUCCION APM ITP ITP PLANTA DE PAPEL
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 06.12.2018 K C ME E E R 0 3 1 1 REV. FECHA MODIFICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-031 5/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

N
A A

B B

C C

D D

E
VALIDO PARA E

CONSTRUCCION

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
ENTR.
1 31.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO
0 06.12.2018 VALIDO PARA CONSTRUCCION APM ITP ITP PLANTA DE PAPEL
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 06.12.2018 K C ME E E R 0 3 1 1 REV. FECHA MODIFICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-031 6/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

N
A A

B B

C C

D D

E
VALIDO PARA E

CONSTRUCCION

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
ENTR.
1 31.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO
0 06.12.2018 VALIDO PARA CONSTRUCCION APM ITP ITP PLANTA DE PAPEL
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 06.12.2018 K C ME E E R 0 3 1 1 REV. FECHA MODIFICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-031 7/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

N
A A

B B

C C

D D

E E

VALIDO PARA
CONSTRUCCION

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
ENTR.
1 31.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO
0 06.12.2018 VALIDO PARA CONSTRUCCION APM ITP ITP PLANTA DE PAPEL
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 06.12.2018 K C ME E E R 0 3 1 1 REV. FECHA MODIFICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-031 8/9

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14

N
A A

B B

C C

D D

E
VALIDO PARA E

CONSTRUCCION

F F

G G

H H

I I

DIB. M. APACLLA PROYECTO

CON. Solange Freyre


INGENIERIA DE INTEGRACION DE DETALLE
PLANOS AFINES

CIP. N° 157182
OBRA DETALLE
Dr. Roland Schmidt
J CIP. N° 1993-T J
INTI COGENERACION PUENTE PIEDRA PIPING DE SUMINISTRO
ENTR.
1 31.01.2019 MODIFICACION DE LISTA DE MATERIALES APM SAM SCR
8MW (10KV) Y 6.2 Ton/h (16.2 barg) DE VAPOR DE AIRE COMPRIMIDO
0 06.12.2018 VALIDO PARA CONSTRUCCION APM ITP ITP PLANTA DE PAPEL
LUGAR: LIMA NUMERO DEL PLANO REVISION
DIBUJÓ PROYECTÓ CONTROLÓ APROBÓ FECHA PLANO N° LAM.
NUMERO PLANO DETALLE PLANO
FECHA: 06.12.2018 K C ME E E R 0 3 1 1 REV. FECHA MODIFICACIONES EJECUTÓ REVISÓ APROBÓ
KC-ME-EER-031 9/9