This procedure provides guidance for conducting a qualitative task risk assessment and prioritization methodology dependent on the
knowledge, experience and professional judgment of those involved. In this methodology, risk is defined as the severity of the outcome of an
incident and the likelihood of that incident occurring. Tasks that have SIF potential must be effectively controlled by the application of
independent defense layers.
Severity of an Incident:
The Severity of an incident is defined based on its “worst credible outcome” as defined below:
Catastrophic Incident: An incident with one or multiple fatalities as a possible outcome.
Critical Incident: An incident with serious (life-threatening or life altering) disabling injury or occupational illness with irreversible
consequences as an outcome.
Significant incident: An incident with significant but reversible injuries or reversible occupational illness as outcome (often an LTA), (e.g. simple
fractures, 2nd degree burns, etc.)
Marginal Incident: An incident with minor reversible injuries or reversible occupational illness as an outcome (recordable), e.g. a minor
laceration, twisted ankle, etc.
Negligible Incident: An incident where no injury is expected but a minor first aid (non recordable) is possible.
Likelihood of Incident:
The likelihood of an incident is based on the probability of its occurrence. In addition, to using Cargill and industry historic data to estimate
likelihood, each location and BU should carefully evaluate its own incident and “near miss” data and exposures to SIF precursors.
Five likelihood categories for assessing task risk and priority are described below with bullets providing guidance for category selection.
Very likely:
These SIF incidents have been reported within Cargill, or in the same industry, on average once in two years.
The location and/or business unit has identified significant SIF potential incidents or “near misses” that have occurred within the last two
years.
Likely:
These SIF incidents have been reported within Cargill or in the same industry in the last 5–10 ten years.
The location and/or business unit has identified significant SIF potential incidents or “near misses” that have occurred within the last 5-10
years.
Possible:
These SIF incidents have been reported in Cargill in the last 25 years.
The location and/or business unit has not identified significant SIF potential incidents or “near misses” within the last 25 years.
Unlikely:
These SIF incidents have not occurred in Cargill.
They have occurred occasionally outside of Cargill.
Very unlikely:
These incidents have never occurred in Cargill and have not occurred outside of Cargill.
Catastrophic A1
potential
Fatality or multiple A2 A3 A4 A5
fatality
SIF
Critical B1
Life Threatening or B2 B3 B4 B5
Life altering
Significant C1
Significant but Reversible C2 C3 C4 C5
(Lost Time)
Marginal
Minor reversible D1 D2 D3 D4 D5
(Reportable)
Negligible
No Injury expected possible E1 E2 E3 E4 E5
minor first aid
For tasks identified as “High Risk” additional defense layers must be developed and implemented with high priority (preferably before the task
is performed). Note: SIF risk in the top left boxes needs to receive top priority and defense layers must be implemented before the task is
performed.
High Risk Medium Risk Reduced Risk
For task identified as “Medium Risk” additional defense layers must be developed and implemented.
Tasks identified as “Reduced Risk” may continue to be performed with existing safety processes and managed for continuous improvement.
Opportunities to further reduce risk may be required depending on the specific situation, country legislation or BU requirements.
Control Hierarchy Table:
The following table provides guidance on the application of controls (defense layers) to reduce overall task risk. Tasks indentified as “high risk”
for a SIF event will require the application of multiple independent defense layers, with priority and emphasis given to design changes or
engineering solutions, to eliminate or reduce task risk.
Note about frequency reduction: It is important that both routine and exceptional tasks be appropriately assessed to determine the “worst
probable outcome”. Although it is recognized that task frequency may impact the type of control implemented, multiple independent defense
layers from the above hierarchy must be evaluated and implemented where required. A reduction in task frequency alone is NEVER sufficient to
manage the risk of a possible SIF event task!
Control Hierarchy Table:
The following table provides guidance on the application of controls (defense layers) to reduce overall task risk. Tasks indentified as “high risk”
for a SIF event will require the application of multiple independent defense layers, with priority and emphasis given to design changes or
engineering solutions, to eliminate or reduce task risk.
Risk Reduction: May reduce severity or likelihood by one or two blocks on matrix
depending on their effectiveness to control hazard and reliability.
C Active Safety Active controls inhibit but do not prevent access to hazard. Examples include railroad
Devices: crossing gates, speed limiters, light curtains, pressure sensitive mats, moveable
barriers or barricades.
Risk reduction: May reduce the likelihood of an incident by one block on the risk matrix
depending on their effectiveness to control hazard and reliability.
D Significant Significant reduction in task exposure such as from daily to annual and the frequency
Reduction in of exposure is continuously monitored (See discussion below).
Frequency:
Risk Reduction: Frequency reduction may reduce the severity or likelihood of an
incident by a maximum of one block, provided the integrity of additional deployed
controls can be confirmed.
E Administrative Reinforced behavior-based controls
Controls Formal operator certification processes: Industrial truck operator licensing
(Including Formal behavior observation processes: Behavior based safety
Personal Specific disciplinary policy (e.g. Cardinal/zero tolerance safety rules)
Protective Behavior based controls
Equipment.) Passive warning systems: Signs, warning labels
Policy and procedures; Fall protection policies, confined space, lockout tagout
Training programs: Lockout tagout, elevated work, task training
Personal protection equipment
Risk reduction: Administrative controls are defense layers which in combination can
reduce the likelihood and, in the case of PPE the severity of an incident, by one block
on the riskthat
Note about frequency reduction: It is important matrix
both(basic ruleand
routine is that 3 of these
exceptional defense
tasks layers are needed
be appropriately assessedto to
move one the “worst
determine
block). that task frequency may impact the type of control implemented, multiple independent defense
probable outcome”. Although it is recognized
F abovePost
layers from the eventmust be
hierarchy Post event planning
evaluated should evaluate
and implemented whereon-site andAoffsite
required. emergency
reduction response and
in task frequency alone is NEVER sufficient to
planning
manage the risk of a possible SIF eventmedical
task! care capabilities.
For the purpose of this guideline it is assumed that post event planning is
appropriately organized. However, if significant gaps exist, incident outcome severity
would be adversely impacted, requiring the application of additional defense layers.
Example: An elevated platform railing, if designed and maintained properly, is very reliable in preventing someone from falling off an elevated
work surface. In addition, a well engineered fall protection system (anchorage point, lanyard and harness) can be very effective in preventing a
significant fall. However, its reliability is dependent on the worker using the fall protection system correctly every time. Training, inspections and
consistent enforcement of fall protection system use, are examples of l controls that can be deployed to improve fall protection systems
reliability.
Similarly a control strategy is more reliable when the defensive layers deployed are “independent” from each other. Ideally the control
implemented will prevent the adverse outcome independent of any other control defense layer implemented.
Business units and locations should conduct periodic assessment of control defense layer reliability by conducting careful analysis of location or
business unit incident and near miss history to validate that existing defenses are effective and that the correct defense layers have not been
deployed.
Effective Use of Policies, Procedures and Training as Controls:
Policies, procedures and training comply with Cargill and regulatory requirements.
Written task procedures are specific to the task identified and clearly specify the steps of the task, the risks involved with each step of the task
and countermeasures used for the hazards to control the risk. In addition, they are up to date and reviewed by knowledgeable people in the
BU and the location to ensure the reliability, accuracy and content of the procedures.
Safety training on high risk tasks clearly identifies the risks of the task and expected control measures in adequate detail to ensure
operator/employee understanding. Training is conducted by trained and qualified person (s) who understands the hazards and
countermeasures to control the risks. Training for high risk tasks includes a comprehension/verification process such as written tests and/or
field observations. Task observations are done to verify policies and procedure are accurate, being followed and are effectively controlling risk.
Safety training on high risk tasks clearly identifies the risks of the task and expected control measures in adequate detail to ensure
operator/employee understanding. Training is conducted by trained and qualified person (s) who understands the hazards and
countermeasures to control the risks. Training for high risk tasks includes a comprehension/verification process such as written tests and/or
field observations. Task observations are done to verify policies and procedure are accurate, being followed and are effectively controlling risk.
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Guard Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul Reviewed by: Mohd Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Restricted view Being struck by tanker A 3 A3 elimination
subsitution
Manage overall vehicle
Engineering
1 in/out movement in plant
area Padestrian crossing, plant traffic assessment being
Administration
publish,wisel
PPE PPE compliance (visibility strap) B 4 B4
Falling due to slippery ground Fall on tar, concrete cement C 2 C2 elimination
subsitution
Engineering
Administration BBS program, workplce inspection (drain, lighting) D 2 D2
PPE safety shoes, safety glass, safety helmet, visibiity strap
Falling due to dark area Fall on tar, concrete cement C 2 C2 elimination
subsitution
Engineering
Administration BBS program, monthly inspection (drain, lighting)
PPE safety shoes, safety glass, safety helmet, visibiity strap D 2 D2
snake bite faint A 3 A3 elimination
subsitution
Engineering
Perform plant perimeter workplce inspection, twice a month on pest control inspection,
2 Administration
inspection e.g clocking lighting
PPE safety shoes, safety glass, safety helmet, visibiity strap B 3 B3
exposure to hot weather heat stroke C 3 C3 elimination
subsitution
Engineering Good ventilation in the guard house, water dispenser provided C 4 C4
Administration
PPE
Ergonomic: walking for every hour Fatigue, fall at same level C 2 C2 elimination
subsitution
Engineering
rotate/buddy system, safety class - ergonomic, provide
Administration D 2 D2
drinking water at canteen
PPE
D 4 D4 elimination
Enforce the registration subsitution
system for outsider and
3 Engineering
permit issue for contractor-
PJHA Administration safety class - ergonomic, D 4 D4
PPE
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Guard Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul Reviewed by: Mohd Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Falling due to angore point weak Falling from height B 2 B2 elimination
subsitution
Proper platform and handrail to reduce the risk + Safety
harness and lifeline used with non-engineered anchorage
Engineering C 3 C3
point, which withstand 5000 pound or 22.2 kN, to walk on
equipment, platforms or roofs
Perform tanker seal
4 Administration
inspection
PPE
A 3 A3 elimination
Slipping from the gang way staircase Falling from height
subsitution
Engineering provide proper handrail and toe guard B 3 B3
Administration SOP+ safety harness training, daily pre-inspection
PPE PPE C 3 C3
Injury due to sharp object B 3 B3 elimination
subsitution
5 Workplace violence Engineering
Administration safety induction, hire from legal agency, cctv B 4 B4
PPE
losing controll hit by moving vehicle A 1 A1 elimination
subsitution
Engineering
6 Perform vehicle inspection
BBS program, Life savers assensment, vehicle stop area,
Administration
speed limit 15kmh,security training, safety induction, wisel
PPE safety helmet, safety glasses, safety shoes, visibility strap C 3 C3
miss comunication zone scene loss of property and live D 1 D1 elimination
subsitution
Emergency respond
7 Engineering
comunication
Administration mothly safety class, safety induction, D 2 D2
PPE
robery live treat B 3 B3 elimination
subsitution
8 Open cargill Office Engineering
Administration safety induction,wisel,CCTV, Notify Sift exec on duty
PPE safety helmet, safety glasses, safety shoes, visibility strap C 3 C3
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Operation Clerk Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Hit by the hard, sharp plate of
Falling due to slippery bridge C 3 C3 elimination
the w/bridge
subsitution
Engineering
Administration PJHA + contractor safety briefing
PPE PPE D 3 D3
Restricted view Being struck by tanker B 2 B2 elimination
subsitution
Engineering
Lead contractor for
1 Padestrian crossing, plant traffic assessment being publish +
weighbridge calibration Administration security guard in control during WIP,barricade work area,PTW
before work
PPE PPE compliance (visibility strap) C 3 C3
Heikal Norazman:
Hit by Standard weght (1mt) crush by heavy load B 2 B2 elimination
new
subsitution
Engineering
PTW,Safety briefing, certified contractor, work procedure,
Administration
barricade
PPE PPE C 3 C3
Ergonomic: eyes strain, hand, wrist &
C 2 C2 elimination
arm pain
subsitution
Engineering
Ergonomic chair + ergonomic class training, + workplce
Administration D 2 D2
inspection
PPE
Hit by the hard, sharp plate of
Falling due to slippery bridge B 3 B3 elimination
the w/bridge
Ensure the tanker properly subsitution
park on the weighbridge
2 Engineering
platform before capturing
the weigh Administration workplce inspection, housekeeping
PPE safety helmet, safety glass, safety shoes, visibility strap D 3 D3
Hit by the hard, sharp plate of
trip on the stumps B 2 B2 elimination
the w/bridge
hit by truck when fall on
subsitution
w/bridge
Engineering remove stumps + leveling of uneven surface B 4 B4
Administration
PPE C 3 C3
elimination
Ergonomic: eyes strain, hand, wrist &
C 2 C2 subsitution
arm pain
3 Print weighbridge ticket Engineering install dark tinterd C 3 C3
Ergonomic counter + ergonomic class training, workplace
Administration D 4 D4
inspection
PPE
elimination
Ergonomic: eyes strain, hand, wrist &
C 2 C2 subsitution
arm pain
Operate SAP system to
4 Engineering
weight product truck
Ergonomic counter + ergonomic class training, workplace
Administration D 2 D2
inspection
PPE
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Operation Clerk Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
elimination
Ergonomic: eyes strain, hand, wrist &
C 2 C2 subsitution
arm pain
Update schedule of product
5 Engineering
intake CPP plant
Ergonomic counter + ergonomic class training, workplace
Administration D 2 D2
inspection
PPE
elimination
Ergonomic: eyes strain, hand, wrist &
C 2 C2 subsitution
arm pain
6 Update turntime report Engineering
Ergonomic counter + ergonomic class training, workplace
Administration D 2 D2
inspection
PPE
elimination
Ergonomic: eyes strain, hand, wrist &
C 2 C2 subsitution
arm pain
Update monthly shipment
7 Engineering
report
Ergonomic counter + ergonomic class training, workplace
Administration D 2 D2
inspection
PPE
falling from stairs C 2 C2 elimination
subsitution
Engineering
Administration ergonomic class training,workplce inspection D 3 D3
PPE
8 Take File from top cabinet
ergonomic: arm pain & back pain C 2 C2 elimination
subsitution
Engineering
Administration ergonomic class training,workplce inspection C 3 C3
PPE
ergonomic: arm pain & back pain D 1 D1 elimination
subsitution
switch on PC and
9 Engineering relocate switch D 3 D3
weghbridge
Administration
PPE
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Lab Asst Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Contact with hot surface Severe burn C 2 C2 elimination
subsitution
Engineering
Administration safe work procedure + workplce inspection
PPE leather glove C 3 C3
Perform chemicals analysis Contact with chemical Splashing to eyes C 2 C2 elimination
for incoming raw crude subsitution using fume hood C 3 C3
palm / kernel oils, in- Engineering
1 process intermediate & chemical hazard handling training + chemical exposure
finished products , storage Administration
surveillance
tanks and shipments / PPE Wearing safety goggle D 3 D3
delivery samples
Fume inhalation poisening, dizzy B 3 B3 elimination
subsitution
Engineering
in-house inspection, 6-monthly LEV inspection, safe work
Administration C 3 C3
instruction
PPE
Falling due to slippery floor Hit floor B 3 B3 elimination
subsitution
Engineering
Administration workplace inspection, housekeeping
PPE PPE C 3 C3
Contact with broken/sharp glass Injured B 3 B3 elimination
subsitution
Perform house-keeping and Engineering
2
glass cleaning
Administration handling training + workplce inspection
PPE PPE (thick correct glove) C 3 C3
chemical spill Injured B 2 B2 elimination
subsitution
Engineering
Administration proper secondary containment, stored in chemical room
PPE D 2 D2
Hazardous fume + small particles/ash Poisening B 3 B3 elimination
subsitution
Engineering using fume hood C 3 C3
chemical exposure surveillance + chemical hazard handling
Administration
training
PPE Wearing safety goggle D 3 D3
Perform waste water
analysis and ensure that Contact with chemical Splashing to eyes D 1 D1 elimination
the control and handling of subsitution
3 the laboratory scheduled Engineering
waste are properly Administration SW handling training yearly + Lab manual
segregated , stored and PPE Wearing safety goggle E 1 E1
labeled
C 2 C2 elimination
subsitution
Exposure to flammable, hazardous chemical,
Severe burn, poisening Engineering ventilation fan installed at storage area + special container
toxic of schedule waste
Administration SW handling training
PPE letex glove, respirator, safety glasses C 3 C3
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Lab Asst Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Falling from height, possible
Falling from tank due slippery A 3 A3 elimination
contact with piping
subsitution
Engineering Proper platform and handrail B 3 B3
Administration SOP (no top tk activity during raining day)+ task training,
Able to take shore tanks PPE sfety glass, safety shoes, visibiity strap, safety helmet C 3 C3
4 samples at factory and tank
farm (when needed) Ergonomic: crouching due to taking sample C 2 C2 elimination
subsitution
Engineering
Schedule time of sampling to decrease frequency of the
Administration D 2 D2
activity
PPE
subsitution
9 Receiving of physical goods Engineering
Administration Ergonomic assessment, safety class, workplace inspection D 3 D3
PPE
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Boilerman Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul Reviewed by: Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Wearing safety goggle + chemical exposure surveillance +
Contact with chemical Splashing to eyes C 2 C2 D 2 D2
chemical hazard handling training
Check water reservoir and
1
boiler chemical sufficient Falling due to insufficient railing Hit the boiler body B 3 B3 PPE + workplace inspection + SOP C 3 C3
Ergonomic: eyes strain, hand, wrist & Ergonomic caunter + ergonomic class training, + workplace
Monitor daily on boiler E 4 E4 E 5 E5
arm pain inspection
3 water quality e.g PH
alkalinity, TDS level Contact with chemical Splash to body B 4 B4 Permit available and in use, PPE, chem handling training C 4 C4
Contact with heat, steam Severe burns A 3 A3 LOTO procedure, PPE, PJHA B 3 B3
Insulation program C 4 C4
Conduct trouble shooting
4 when boiler having Slipping due to oily floor fall on the same level D 3 D3 Housekeeping program, PPE D 4 D4
operational difficulties
Falling due to insufficient railing Hit the boiler body B 2 B2 Primary fall protection provided as per Wilmar intl req C 2 C2
Elevated training, PPE, workplace inspection D 2 D2
Conduct preventive and Contact with heat, steam, dust Severe burns A 2 A2 LOTO procedure, PPE, PJHA B 3 B3
predictive maintenance on
Insulation program C 4 C4
6 boiler and equipment e.g
prepare and clean boiler for oily floor slipping D 4 D4 Housekeeping program, PPE E 4 E4
JKKP inspection
Contact with heat & high pressure air Severe burns on skin B 3 B3 Insulation program C 3 C3
7 Start firing Boiler half face respirator, dust exposure monitoring, housekeeping
Contact with smoke Difficult to breath D 3 D3 E 3 E3
program
11 Regenerate water softener Use proper and complete PPE provided; Utilize knowledge
Contact with chemical splashing to eyes D 3 D3 D 4 D4
from training and taking precautiions
Monitor WWTP auto
program at various stage
12 Getting in contact with electricity while start stop button outside the panel, arc flash testing
e.g polishing, settling, electrocution B 3 B3 C 3 C3
operating the panel conducted, monthly safety class
decanting
Fall into bio tank when perform in-situ
fall from height A 3 A3 primary protection installed C 3 C3
monitoring
Monitor daily on water level
13 Falling due to insufficient railing Hit the boiler body B 2 B2 Primary fall protection provided as per Wilmar intl req C 2 C2
of the WWTP system
Assist on checking the SOP+ safety harness training, daily pre-inspection, PPE C 3 C3
5 cleanliness of dispatch
tanker. Falling from height, hit by
Slipping from the gang way staircase A 3 A3 provide proper handrail and toe guard B 3 B3
tanker body
Load product oil into tanker SOP+ safety harness training, daily pre-inspection, PPE C 3 C3
6 and seal after complete
loading Falling from height, hit by
Slipping from the gang way staircase A 3 A3 provide proper handrail and toe guard B 3 B3
tanker body
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Oilbay Operator Qualitative Risk Assessment Date:
Baseline Assessment 19/9/2018
Drafted by: Khairul Anwar Haron Reviewed by: Heikal ✘ Re-assessment Page:
Load product oil into tanker
6 and seal after complete Working Draft
loading Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
oily floor Fall on the same level C 2 C2 proper oil tray design, spillage plan D 2 D2
Replace bag filter/strainer
7 Contact with hot material: oil Severe burn C 2 C2 leather glove+ safe work procedure+workplace inspection C 3 C3
when needed.
Use of forklift : uneven floor tipping-over C 3 C3 Forklift training, PPE (seat belt), pre-use inspection D 3 D3
Prepare anti oxidant
9 Rotation job (assign 2 people or more to do the job) +
solution upon request Ergonomic: back pain D 1 D1 E 1 E1
ergonomic assessment
Falling from tanker due slippery Falling from height A 3 A3 Proper platform and handrail B 3 B3
10 Perform CPO top sampling pre-use inspection for safety harness, ppe, C 3 C3
LOTO: electrical, steam A 3 A3 LOTO permit + zero energy verification+ permit system, interlock system C 3 C3
3 Operate and conduct CSD for High Pressure Steam Boiler system
Contact with heat severe burn A 3 A3 Insulation program C 3 C3
LOTO: pneumatic, mechanical A 3 A3 LOTO permit + zero energy verification+ permit system, interlock system C 3 C3
Inhale caustic vapor Irritate the lungs C 2 C2 Lung function & fit test annually, half face respirator, SOP D 2 D2
Sharp Edge Skin Cuts C 3 C3 Use PPE and wearing long sleeve jacket,nearmiss program D 3 D3
17 Strainer cleaning -cpo, 635, barometric water
Sharp edge Skin cuts C 3 C3 Use PPE and wearing long sleeve jacket,nearmiss program D 3 D3
Empty out system, depressurize and isolate before replace the bag,proper
18 Replacing bag filter Hot oil - splash Skin burns C 2 C2 C 3 C3
PPE,
Inhale dust /ash from spent clay Irritate the lungs C 2 C2 half face respirator, dust exposure monitoring, housekeeping program D 2 D2
19 Cleaning the chute Use PPE and wearing long sleeve jacket, dust exposure monitoring,
Spent clay contact with skin,eye Irritate skin and eye C 2 C2 C 3 C3
housekeeping program
Inhale dust /ash from spent clay Irritate the lungs C 2 C2 half face respirator, dust exposure monitoring, housekeeping program D 2 D2
21 Cleaning the trailer area
Hit by trailer Fatality/ Severely injured B 3 B3 Ensuring area is barricaded and tyre choked practice during parking C 3 C3
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Fitter Qualitative Risk Assessment Date:
✘ Baseline Assessment 19/9/2018
Drafted by: Khairul Reviewed by: Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Contact with heat, steam, Appropriate PPE required including safety glove, long sleeve jacket,
1 severe burn A 3 A3 B 3 B3
hot oil nearmiss reporting
Insulation program C 3 C3
not connected harness or
Falling from height B 3 B3 Proper platform and handrail to reduce the risk, toe board C 3 C3
angore point weak
Machine guarding-contact
hand crush A 3 A3 All rotating equipment is guarded as per Wilmar intl req B 3 B3
with rotating parts
Ergonomic: eyes strain, Ergonomic caunter + ergonomic class training,+ monthly safety
C 2 C2 D 2 D2
hand, wrist & arm pain inspection
10
11
12
13
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Cleaner Qualitative Risk Assessment Date:
Baseline Assessment
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Cleaner
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
Falling due to slippery fall at same level
Perform office
housekeeping (e.g
1 sweeping, mopping, wipe
the window, meeting room Ergonomic back pain
arrangement etc)
10
11
12
13
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Cleaner
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Canteen Operator Qualitative Risk Assessment Date:
Baseline Assessment 20/8/14
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk Defense Layers ( Control Measures) Final Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk Including the Proposed changes S L
Exposed to heat, boiled water, hot oil Severe burn D 2 D2 elimination
subsitution
Engineering
1 Prepare food and drinks
Administration
PPE
Falling due to slippery fall at same level E 3 E3 elimination
subsitution
Perform housekeeping at
2 Engineering
the end of the day
Administration
PPE
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Canteen Operator Qualitative Risk Assessment Date:
Baseline Assessment 20/8/14
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk Defense Layers ( Control Measures) Final Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk Including the Proposed changes S L
16
Hazard Identification and Task Risk Assessment Sheet SIF Hazard Identification and Task Risk Ass
Plant/department: Canteen Operator
Final Risk
Nr Task Hazardous event Consequences
Risk
Exposed to heat, boiled water, hot oil Severe burn
Perform housekeeping at
2
the end of the day
10
11
12
13
14
15
16
Hazard Identification and Task Risk Assessment Sheet SIF Hazard Identification and Task Risk Ass
Plant/department: Canteen Operator
Final Risk
Nr Task Hazardous event Consequences
Risk
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Canteen Operator
Drafted by: Nurulhaida Luhid Defense Layer (Control Measures) Reliablity Actions to Improve Defense Layer Reliability
Implementation deadline:
Control category Describe Reliability of the Defense Layer (Control Measures) Actions to improve Responsible Implementation
Add a specific date by when the
Nr Task Hazardous event Consequences
A B C D E ABC D E reliability Person proposed changes
deadline are to be
Exposed to heat, boiled water, hot oil Severe burn implemented.
Perform housekeeping at
2
the end of the day
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Canteen Operator
Drafted by: Nurulhaida Luhid Defense Layer (Control Measures) Reliablity Actions to Improve Defense Layer Reliability
Control category Describe Reliability of the Defense Layer (Control Measures) Implementation deadline:
Actions to improve Responsible Implementation
Add a specific date by when the
Nr Task Hazardous event Consequences
A B C D E ABC D E reliability Person proposed changes
deadline are to be
16 implemented.
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Safety Committee Qualitative Risk Assessment Date:
Baseline Assessment 19/6/14
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Exposed to heat, steam, hot oil, Severe burn B 3 B3 elimination Insulation program C 3 C3
subsitution
Engineering
Administration
PPE
Exposed to chemical, dust Difficult to breath B 3 B3 elimination
subsitution
Engineering ventilation fan installed, dust collector monitoring program C 3 C3
Administration
PPE
Conduct monthly safety Falling while climbing /desending Falling from height B 2 B2 elimination
1 inspection and subsitution
housekeeping inspection
Engineering Proper platform and handrail to reduce the risk e.g toe board B 4 B4
Administration
PPE
Falling due to slippery Fall at same level C 2 C2 elimination
subsitution
Engineering
Administration BBS program, departmental housekeeping program
PPE PPE D 2 D2
Tipping-over due to not level floor Fall at same level D 3 D3 elimination
subsitution
Engineering
Administration BBS program, departmental housekeeping program
PPE PPE D 2 D2
9
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Safety Committee Qualitative Risk Assessment Date:
Baseline Assessment 19/6/14
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
9
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Safety Committee
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
Conduct monthly safety Falling while climbing /desending Falling from height
1 inspection and
housekeeping inspection
x
x
Tipping-over due to not level floor Fall at same level
9
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Safety Committee
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
9
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: First Aider Qualitative Risk Assessment Date:
Baseline Assessment
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Exposed to bloodborne pathogen or
Infection B 3 B3 elimination
other potentially infectious material
subsitution
Attend injury employee or Engineering
1
contractor
Administration Hep B vaccination, BBP safety class, first aider training by GH,
PPE PPE (medical glove) C 3 C3
Dizzy fall at same level B 3 B3 elimination
subsitution
Engineering
Medical check-up by OHD + competency training by NIOSH +
Administration C 3 C3
health declaration by individual
PPE
Pre-existing medical
2 lack of oxygen difficult to breath A 3 A3 elimination
condition - unfit
subsitution
wear personal gas detector in the confined space all the times
Engineering B 3 B3
+ exhaust fan installed& run all the time
Permit system + Monthly safety class + Competency training
Administration
by NIOSH
PPE PPE+SCBA C 3 C3
10
11
12
13
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: First Aider Qualitative Risk Assessment Date:
Baseline Assessment
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: First Aider
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
Exposed to bloodborne pathogen or
Infection
other potentially infectious material
x
Dizzy fall at same level x
Pre-existing medical
2 lack of oxygen difficult to breath S
condition - unfit
x
x
10
11
12
13
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: First Aider
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: ERT Qualitative Risk Assessment Date:
Baseline Assessment
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
subsitution
Engineering
monthly inspection for fire ext, safety class on EAP, Training
Administration C 3 C3
by BOMBA, conduct fire drill annually,
PPE
Trap in the smoke Difficult to breath B 3 B3 elimination
subsitution
Involved in fire fighting
Engineering
(identified as under control
1 monthly inspection for fire ext, safety class on EAP,Training
or can be easily brought Administration
under control) by BOMBA, conduct fire drill annually
PPE SCBA C 3 C3
Falling due to smoky area during
evacuate employee and contractor to Fall and step on by others B 3 B3 elimination
assembly point
subsitution
Engineering
conduct fire drill annually, safety class on EAP, Training by
Administration
BOMBA
PPE PPE C 3 C3
Contact with hazardous chemical Chemical burns B 3 B3 elimination
subsitution
Engineering
Administration Designated bundwall,monthly safety training
PPE Spill Kit,PPE C 3 C3
Involved in spill drill (e.g
2 Falling due to slippey area Fall at same level B 3 B3 elimination
oil, chemical)
subsitution
Engineering
Monthly housekeeping inspection, dept program on
Administration
housekeeping
PPE PPE C 3 C3
Dizzy fall at same level B 3 B3 elimination
subsitution
Engineering
Medical check-up by OHD + competency training by NIOSH +
Administration C 3 C3
health declaration by individual
PPE
Pre-existing medical
3 lack of oxygen difficult to breath A 3 A3 elimination
condition - unfit
subsitution
wear personal gas detector in the confined space all the times
Engineering B 3 B3
+ exhaust fan installed & run all the time
Permit system + PPE + SCBA + Monthly safety class +
Administration
Competency training by NIOSH
PPE PPE + SCBA C 3 C3
6
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: ERT Qualitative Risk Assessment Date:
Baseline Assessment
Drafted by: Nurulhaida Luhid ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
6
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: ERT
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
Trap in the fire Body burns x
x
Contact with hazardous chemical Chemical burns
x
Involved in spill drill (e.g
2 Falling due to slippey area Fall at same level
oil, chemical)
x
Dizzy fall at same level
Pre-existing medical
3 lack of oxygen difficult to breath
condition - unfit
6
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: ERT
Defense Layer (Control
Drafted by: Nurulhaida Luhid Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
6
10
11
12
13
14
15
16
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Contractor Qualitative Risk Assessment Date:
Baseline Assessment 22/10/2014
Drafted by: Mohd Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Perform DOE isokinetic test Contact with heat, dust, hazardous Severe burn, dizzy, difficult to
B 3 B3 PPE + contractor safety briefing + PJHA C 3 C3
(boiler chimney, dust chemical fume breath
1
collector at plant and main
silo, fume hood) Crane permit + PPE + contractor safety breifing + PJHA +
BBS implementation + check on wind speed,Ensure
Falling due to strong wind at tank farm Fall from height A 3 A3 supervision and monitoring are in place,Immediately stop the B 4 B4
operation of the AWP equipment
from the platform and remove the operator/occupant(s)
high noise area Hearing impairment B 3 B3 PPE + singage + safety induction + PJHA B 4 B4
Primary fall protection provided,PPE, monthly safety
Protected platform: insufficient railing falling from height A 4 A4 B 4 B4
inspection, elevated risk assessment annually
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Contractor Qualitative Risk Assessment Date:
Baseline Assessment 22/10/2014
Drafted by: Mohd Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
S L Risk Today Situation S L Risk
Elevated permit + PJHA + Proper platform and handrail to
going up and down the scaffolding e.g
falling A 3 A3 reduce the risk + safety class training + contractor safety C 3 C3
paint tank
briefing
Falling due to angore point weak Falling from height A 3 A3 Proper platform and handrail to reduce the risk B 3 B3 x L 1
Assist on checking seals for SOP'+ safety harness training, daily pre-inspection, PPE C 3 C3 x S 3
1
tanker
A 2 A2 provide proper handrail and toe guard C 2 C2 x S 1
Slipping from the gang way staircase Falling from height
SOP+ safety harness training, daily pre-inspection, PPE D 2 D2 x S 3
Rotation job (assign 2 people or more to do the job) + BBS
Ergonomic: back pain D 1 D1
program + ergonomic assessment
E 1 E1 x S 3/3
Receiving product oil from Restricted view Being struck by tanker A 3 A3 Pedestrian walk B 3 B3 x S 1
2 tanker to storage tank (cpp
plant)
Accompanied by Cargill supervisor + PPE + contractor safety
C 3 C3 x S 3/3
briefing + plant traffic safety plan posted at the guard house
Prepare anti oxidant Proper and special practical training & competence person D 3 D3 x S 1/3
7
solution upon request
Ergonomic: back pain C 3 C3 Ergonomic assessment, safety class, monthly safety inspection D 3 D3 x L 3/3
Falling from tank due slippery fall from height A 3 A3 buddies system + no sampling during raining + PPE B 3 B3 x S 3/3
strong wind Falling from tank A 3 A3 proper railing and toeboard around the tank C 3 C3 X S 1
Monitor crude and product
1 tank movement and
buddies system + no dipping job during raining and strong
terminal tank logistics D 3 D3 x S 3
wind (SOP) + wear safety shoe and harness
no safety net at gang-way Falling into the sea A 3 A3 safety net is compulsory B 3 B3 x S 1
Monitor tank shrinkage with Ergonomic: pinch Job rotation and provide platform to give the comfortable
3 C 2 C2 C 3 C3 x L 1
action plan situation during the job
slippery area Fall on the same level B 3 B3 housekeeping program, PPE, BBS program C 3 C3 x S 3/3
6
Perform housekeeping Design proper oil tray & spillage plan D 3 D3 x S 1
program
Ergonomic: back pain C 3 C3 Ergonomic assessment, safety class, monthly safety inspection D 3 D3 x L 3/3
7
Carry out loading plan to no safety net at gang-way Falling into the sea A 3 A3 safety net is compulsory B 3 B3 x S 1
vessels
ppe (lifebouy), SOP, BBS program C 3 C3 x S 3/3
slippery area Fall on the same level B 3 B3 housekeeping program, PPE, BBS program C 3 C3 x S 3/3
LOTO: mechanical, water, oil, steam, LOTO permit + zero energy verification+ permit system,
drowning A 3 A3 C 3 C3
stirrer interlock system
Emptied out vessel and Basic PPE by using safety boots/rubber boots during do the
7 Oil spillage and cause wet floor Falling at same level B 3 B3 C 3 C3
tank (Open drain valve at washing job, housekeeping program, BBS program
bottom vessel) Provide oil container such as pump tray to avoid oil floor and
D 3 D3
line leak
Clean up Machine guarding-contact with rotating
8 hand crush A 3 A3 All rotating equipment is guarded as per Corporate req B 3 B3
pump/machine/equipment parts
for maintenance work
LOTO permit + zero energy verification+ permit system C 3 C3
LOTO: electrical,
9 mechanical, pneumatic Electrical shock Fatality/ Severely injured A 3 A3 LOTO permit + zero energy verification+ permit system B 3 B3
systems
MCC lockout conduct by competent electrician, interlock
C 3 C3
system
Insufficient railings and unprotected Primary fall protection provided,PPE, monthly safety
10 Walking on elevated places fall from high place B 3 B3 C 3 C3
monkey ladders inspection, elevated risk assessment annually
11 Open and close large valve Ergonomic Back pain C 3 C3 Ergonomic assessment, safety class, monthly safety inspection D 3 D3
Inhale caustic vapor Irritate the lungs C 2 C2 Lung function & fit test annually, half face respirator, SOP D 2 D2
irritate and cause severely and Use basic PPE and neoprene glove during cailbration, SOP,
contact with skin, eye B 3 B3 C 3 C3
16 Phos acid dosing calibration burn the skin chem handling training
21 Cleaning the trailer area Ensuring area is barricaded and tyre choked practice during
Hit by trailer Fatality/ Severely injured B 3 B3 C 3 C3
parking
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Fract Operator Qualitative Risk Assessment Date:
Baseline Assessment 19/11/13
Drafted by: Khairul Anwar Haron Reviewed by: Heikal ✘ Re-assessment Page:
Working Draft
Prior Risk Defense Layers (Control Measures) Current Risk
Nr Task Hazardous event Consequences
Severity S L Risk Today Situation S L Risk
A : Catastrophic (SIF- Fatality)
B : Critical (SIF-Life Threatening/Altering)
C : Significant (Reversible-Lost Time) Appropriate PPE required including safety glove, long sleeve
Control steam pressure for plant at Contact with heat D
severe burn
: Marginal (Reversible-Reportable Incident)
A 3 A3
jacket, nearmiss reporting, BBS program
B 3 B3
1
required level E : Negligible(Frist aid)
Insulation program C 3 C3
Falling from CT due to slippery fall from top of CT B 3 B3 platform with handrail C 3 C3
oily floor Fall on the same level C 2 C2 proper oil tray design, spillage plan D 2 D2
Monitor online system for fract Ergonomic: eyes strain, hand, wrist & Ergonomic caunter + ergonomic class training, BBS program
4 C 2 C2 D 2 D2
operation at fract control room arm pain + monthly safety inspection
Falling due to slippery area fall on same level C 2 C2 proper oil tray design, spillage plan D 2 D2
Ergonomic: head, hand, wrist & arm Ergonomic caunter + ergonomic class training, BBS program
C 2 C2 D 2 D2
6 Change filter cloth pain + monthly safety inspection
Permit system + PPE + SCBA + personal gas detector +
Confine space: Lack of oxygen oxygen deficiency A 3 A3 exhaust fan installed + Monthly safety class + Training by C 3 C3
NIOSH + contractor safety briefing
Insulation program C 3 C3
operating and maintenance of rotary Lock Rotary Valve panel for unautorize acess + guarded
new hand crush A 3 A3 B 4 B4
valve rotating equipment
LOTO: electrical, mechanical, LOTO permit + zero energy verification+ permit system,
A 3 A3 C 3 C3
pneumatic, vacuum interlock system
Drafted by: Mathen Ramachandram Reviewed by: Mohd Redzuan Defense Layer (Control Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
x
Perform shutdown works
4 and to work or lead Cutting/welding in tank explosion x
contractors if required
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Fitter
Drafted by: Mathen Ramachandram Reviewed by: Mohd Redzuan Defense Layer (Control Measures) Reliablity
Perform proper equipment Contact with heat, steam, hot oil severe burn x
isolation and lock-out to
5
ensure safety prior to work LOTO: electrical, mechanical,
commencement x x
pneumatic, vacuum
Contact with energy (heat,steam,hot Appropriate PPE required including safety glove, long sleeve
severe burn A 3 A3 B 3 B3
oil) jacket, nearmiss reporting, BBS program
Insulation program C 3 C3
Falling due to angore point weak Falling from height B 3 B3 Proper platform and handrail to reduce the risk, toe board C 3 C3
Use of forklift:falling load due to competent driver + ex forklift training+ daily checklist
load damage C 3 C3 D 3 D3
driving weighted load in high position inspection
Electrical Chain Hoist - towing PPE + housekeeping program + monthly safety inspection
electrocution A 4 A4 B 4 B4
equipment (electrical part)
Attend on-call based on defensive riding, visibility strap, monthly safety class (vehicle
4 Involved in road accident fatality A 4 A4 B 4 B4
schedule and procedure safety)
Insulation program C 3 C3
Conduct CSD testing LOTO: electrical, mechanical, LOTO permit + zero energy verification+ permit system,
8 A 3 A3 C 3 C3
anually for HPSB pneumatic, vacuum interlock system
Working with electric assessment by ext party, arc flash suit, monthly safety
11 Arc flash risk electrocuted A 3 A3 B 3 B3
control panel class,rubber mat,certified person
SIF Hazard Identification and Task Risk Assessment Sheet
Plant/department: Electrician
Defense Layer (Control
Drafted by: Mathen Ramachandram Reviewed by: Mohd Redzuan Measures) Reliablity
Control category
Nr Task Hazardous event Consequences
A B C D E
Contact with energy (heat,steam,hot
severe burn x
oil)
Update MWO system after Ergonomic: eyes strain, hand, wrist &
2 x
work completed arm pain
Control category
Nr Task Hazardous event Consequences
A B C D E
Electrocution x
Develop,implement and maintain an energy isolation Mandatory: LOTO tested before entry
Contact with energy( heat,steam,hot Critical 5 audit
oil)
severe burn C 2 C2 procedure and the relevent permits(loto) for all the relevent C 3 C3 x L 1
energy sources assessment
Perform proper equipment
isolation and lock-out to
6
ensure safety prior to work LOTO:electrical,mechanical,pneumatic,
A 3 A3 LOTO of all equipments B 3 B3 x S 1 Mandatory: LOTO tested before entry
commencement vacuum
Critical 5 audit
assessment
LOTO procedure& verification+Permit applied C 3 C3 x S 2/2
Develop,implement and maintain an energy isolation Mandatory: LOTO tested before entry
Contact with energy
severe burn C 2 C2 procedure and the relevent permits(loto) for all the relevent D 2 D2 x L 1 Critical 5 audit
( heat,steam,hot oil)
energy sources assessment
Mandatory: LOTO tested before entry
LOTO:electrical,mechanical,
A 3 A3 LOTO of all equipments B 3 B3 x S 1 Critical 5 audit
pneumatic,vacuum
assessment
Perform proper equipment wear personal gas meter all the time in confine
isolation and confine space Cutting/welding in tank explosion A 2 A2
space+exhaust fan installed & run all the time
B 3 B3 x S 2
8
to ensure safety prior to
work commencement
Ventilation of confined space prior - and during entry, Gas test Ventilation protocol is available
Confine space:Lack of oxygen oxygen deficiency A 3 A3 of atmosphere prior to entry, use of personal gas testers with B 3 B3 x S 1 Use of gas tester to
alarming during entry confirm atmosphere is safe
Attendant present outside of confined space, CSE
C 3 C3 x S 3/3
permit, Confined space entry training