This document contains the results of calculations to determine the vertical pressure change at different sections of a tunnel due to loading from piles. For section A-A, the total pressure change was 10.28 kPa. Section B-B had a total pressure change of 17.15 kPa. Finally, the total pressure change for section C-C was 19.43 kPa. The calculations were performed using pile load and configuration data, as well as the Boussinesq equation, to determine the pressure change at each pile location.
This document contains the results of calculations to determine the vertical pressure change at different sections of a tunnel due to loading from piles. For section A-A, the total pressure change was 10.28 kPa. Section B-B had a total pressure change of 17.15 kPa. Finally, the total pressure change for section C-C was 19.43 kPa. The calculations were performed using pile load and configuration data, as well as the Boussinesq equation, to determine the pressure change at each pile location.
This document contains the results of calculations to determine the vertical pressure change at different sections of a tunnel due to loading from piles. For section A-A, the total pressure change was 10.28 kPa. Section B-B had a total pressure change of 17.15 kPa. Finally, the total pressure change for section C-C was 19.43 kPa. The calculations were performed using pile load and configuration data, as well as the Boussinesq equation, to determine the pressure change at each pile location.