PROYEK UNIVERSITAS MULAWARMAN

MONITORING TIANG PANCANG


GEDUNG FCSIT 1

PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN SISA PANJANG


KODE TOTAL PANJANG
AS / KODE KONFIGURASI BOTTOM MIDDLE DAPAT TIANG TIANG PANCANG
NO. LAYOUT GRUP TIANG PANCANG KETERANGAN
GRID PILE PEMANCANGAN 6 13 6 9 13 DIGUNAKAN PANCANG PER TITIK
PILE
m' btg btg btg btg btg m' m' m' m'
a b c d e f g h i j k l m=(gx6)+(hx13)+ n o=m-n p
(ix6)+(jx9)+(kx13)+l

1 B'/1' PC2 20 Test Pile 1.00 8.00 54.00 1.00 53.00


2 C/4 PC3 29 Test Pile 1.00 6.00 42.00 42.00
3 B/6' PC2 35 Test Pile 1.00 7.00 48.00 0.50 47.50
SUBTOTAL I 3.00 - 21.00 - - - 144.00 1.50 142.50
66 A/5 PC2 1 54.00 1.00 1.00 3.00 58.00 4.00 54.00
67 B/3 PC2 2 54.00 1.00 1.00 3.00 58.00 4.00 54.00
68 B/3 PC2 3 54.00 1.00 1.00 1.00 2.00 54.00 2.00 52.00
69 B/3 PC2 4 54.00 1.00 1.00 1.00 2.00 54.00 1.00 53.00
29 A/3 PC2 5 45.00 1.00 1.00 2.00 45.00 45.00
30 A/3 PC2 6 45.00 1.00 1.00 2.00 45.00 45.00
31 A/4 PC2 7 45.00 1.00 1.00 2.00 45.00 45.00
32 A/4 PC2 8 45.00 1.00 1.00 2.00 45.00 45.00
33 A/5 PC2 9 45.00 1.00 1.00 2.00 45.00 45.00
34 A/5 PC2 10 45.00 1.00 1.00 2.00 45.00 45.00
4 A/6 PC2 11 48.00 1.00 1.00 2.00 48.00 48.00
5 A/6 PC2 12 48.00 1.00 1.00 2.00 48.00 48.00
6 A/6' PC2 13 48.00 1.00 1.00 2.00 48.00 5.00 43.00
7 A/6' PC2 14 48.00 1.00 1.00 2.00 48.00 5.00 43.00
8 A'/5' PC1 15 48.00 1.00 1.00 2.00 48.00 48.00
9 A'/6 PC1 16 48.00 1.00 1.00 2.00 48.00 48.00
10 A"/5' PC1 17 48.00 1.00 1.00 2.00 48.00 48.00
11 A"/6 PC1 18 48.00 1.00 1.00 2.00 48.00 48.00
70 A'/6 PC2 19 54.00 1.00 1.00 3.00 58.00 5.00 53.00
71 A"/5' PC3 21 54.00 1.00 1.00 1.00 2.00 54.00 2.00 52.00
72 A"/6 PC3 22 54.00 1.00 1.00 1.00 2.00 54.00 1.00 53.00
73 B/6 PC3 23 54.00 1.00 1.00 1.00 2.00 54.00 2.00 52.00
35 B/3 PC3 24 45.00 1.00 1.00 2.00 45.00 45.00
36 B/3 PC3 25 45.00 1.00 1.00 2.00 45.00 45.00
37 B/3 PC3 26 45.00 1.00 1.00 2.00 45.00 45.00
38 B/4 PC3 27 45.00 1.00 1.00 2.00 45.00 3.00 42.00
39 B/4 PC3 28 45.00 1.00 1.00 2.00 45.00 45.00
40 B/5 PC3 30 45.00 1.00 1.00 2.00 45.00 45.00
41 B/5 PC3 31 45.00 1.00 1.00 2.00 45.00 1.00 44.00
42 B/5 PC3 32 45.00 1.00 1.00 2.00 45.00 45.00
12 B/6 PC2 33 48.00 1.00 1.00 2.00 48.00 48.00
13 B/6 PC2 34 48.00 1.00 1.00 2.00 48.00 6.00 42.00
14 B/6' PC2 36 48.00 1.00 1.00 2.00 48.00 48.00
74 B/6 PC2 37 54.00 1.00 1.00 3.00 58.00 5.00 53.00
75 B/6 PC2 38 54.00 1.00 1.00 3.00 58.00 6.00 52.00
76 D'/6 PC3 39 54.00 1.00 1.00 2.00 48.00 48.00
77 D"/6 PC3 40 54.00 1.00 1.00 2.00 48.00 0.50 47.50
78 A/3 PC3 41 54.00 1.00 1.00 2.00 48.00 0.50 47.50
43 C/3 PC3 42 45.00 1.00 1.00 2.00 45.00 45.00
44 C/3 PC3 43 45.00 1.00 1.00 2.00 45.00 45.00
45 C/3 PC3 44 45.00 1.00 1.00 2.00 45.00 45.00
46 C/4 PC3 45 45.00 1.00 1.00 2.00 45.00 2.00 43.00
47 C/4 PC3 46 45.00 1.00 1.00 2.00 45.00 45.00
48 C/4 PC3 47 45.00 1.00 1.00 2.00 45.00 45.00
49 C/5 PC3 48 45.00 1.00 2.00 2.00 51.00 51.00
50 C/5 PC3 49 45.00 1.00 2.00 2.00 51.00 2.00 49.00
51 C/5 PC3 50 45.00 1.00 1.00 2.00 45.00 45.00
15 C/6 PC2 51 48.00 1.00 1.00 2.00 48.00 6.00 42.00
16 C/6 PC2 52 48.00 1.00 1.00 2.00 48.00 5.00 43.00
79 A/3 PC2 53 54.00 1.00 1.00 3.00 58.00 4.00 54.00
80 A/4 PC2 54 54.00 1.00 1.00 3.00 58.00 2.00 56.00
PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN SISA PANJANG
KODE TOTAL PANJANG
AS / KODE KONFIGURASI BOTTOM MIDDLE DAPAT TIANG TIANG PANCANG
NO. LAYOUT GRUP TIANG PANCANG KETERANGAN
GRID PILE PEMANCANGAN 6 13 6 9 13 DIGUNAKAN PANCANG PER TITIK
PILE
m' btg btg btg btg btg m' m' m' m'
a b c d e f g h i j k l m=(gx6)+(hx13)+ n o=m-n p
(ix6)+(jx9)+(kx13)+l
81 A/4 PC2 55 54.00 1.00 1.00 1.00 2.00 54.00 54.00
82 A/5 PC2 56 54.00 1.00 1.00 1.00 2.00 54.00 54.00
52 D/3 PC2 57 45.00 1.00 1.00 2.00 45.00 45.00
53 D/3 PC2 58 45.00 1.00 1.00 2.00 45.00 45.00
54 D/4 PC2 59 45.00 1.00 1.00 2.00 45.00 45.00
55 D/4 PC2 60 45.00 1.00 1.00 2.00 45.00 45.00
56 D/5 PC2 61 45.00 1.00 2.00 2.00 51.00 51.00
57 D/5 PC2 62 45.00 1.00 1.00 2.00 45.00 45.00
17 D/6 PC2 63 48.00 1.00 1.00 2.00 48.00 4.00 44.00
18 D/6 PC2 64 48.00 1.00 1.00 2.00 48.00 48.00
19 B/6" PC2 65 48.00 1.00 1.00 2.00 48.00 48.00
20 B/6" PC2 66 48.00 1.00 1.00 2.00 48.00 48.00
21 B/6"' PC2 67 48.00 1.00 1.00 2.00 48.00 48.00
22 B/6"' PC2 68 48.00 1.00 1.00 2.00 48.00 48.00
23 C/6" PC2 69 48.00 1.00 1.00 2.00 48.00 48.00
24 C/6" PC2 70 48.00 1.00 1.00 2.00 48.00 48.00
25 C/6"' PC2 71 48.00 1.00 1.00 2.00 48.00 48.00
26 C/6"' PC2 72 48.00 1.00 1.00 2.00 48.00 48.00
58 D/5 PC1 73 45.00 1.00 1.00 2.00 45.00 45.00
27 D'/6 PC1 74 48.00 1.00 3.00 52.00 6.50 45.50
59 D/5 PC1 75 45.00 1.00 1.00 2.00 45.00 45.00
60 C/3 PC1 76 45.00 1.00 1.00 2.00 45.00 45.00
61 C/3 PC1 77 45.00 1.00 1.00 2.00 45.00 45.00
28 D"/6 PC1 78 48.00 1.00 1.00 2.00 48.00 48.00
62 C/3 PC1 79 45.00 1.00 1.00 2.00 45.00 45.00
63 A/4 PC1 80 45.00 1.00 1.00 2.00 45.00 45.00
64 A/4 PC1 81 45.00 1.00 1.00 2.00 45.00 45.00
65 A/5 PC1 82 45.00 1.00 1.00 2.00 45.00 45.00

SUBTOTAL II - 79.00 54.00 34.00 166.00 - 3,815.00 84.50 3,730.50


TOTAL 3.00 79.00 75.00 34.00 166.00 - 3,959.00 86.00 3,873.00
JUMLAH TITIK TIANG PANCANG 82.00
JUMLAH BOBOKAN TIANG PANCANG 82.00
PROYEK UNIVERSITAS MULAWARMAN
LAS SAMBUNGAN TIANG PANCANG
GEDUNG FCSIT 2

PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN


KODE TOTAL LAS
AS / KODE KONFIGURASI MIDDLE DAPAT SAMBUNGAN
NO. LAYOUT GRUP PEMANCANGAN KETERANGAN
GRID PILE 6 9 13 DIGUNAKAN
PILE
m' btg btg btg m' m'

a b c d e f g h i j k=g+h+i+j l

1 B'/1' PC2 20 Test Pile 8.00 8.00


2 C/4 PC3 29 Test Pile 6.00 6.00
3 B/6' PC2 35 Test Pile 7.00 7.00
SUBTOTAL I 21.00 - - - 21.00
4 A/6 PC2 11 48.00 1.00 2.00 3.00
5 A/6 PC2 12 48.00 1.00 2.00 3.00
6 A/6' PC2 13 48.00 1.00 2.00 3.00
7 A/6' PC2 14 48.00 1.00 2.00 3.00
8 A'/5' PC1 15 48.00 1.00 2.00 3.00
9 A'/6 PC1 16 48.00 1.00 2.00 3.00
10 A"/5' PC1 17 48.00 1.00 2.00 3.00
11 A"/6 PC1 18 48.00 1.00 2.00 3.00
12 B/6 PC2 33 48.00 1.00 2.00 3.00
13 B/6 PC2 34 48.00 1.00 2.00 3.00
14 B/6' PC2 36 48.00 1.00 2.00 3.00
15 C/6 PC2 51 48.00 1.00 2.00 3.00
16 C/6 PC2 52 48.00 1.00 2.00 3.00
17 D/6 PC2 63 48.00 1.00 2.00 3.00
18 D/6 PC2 64 48.00 1.00 2.00 3.00
19 B/6" PC2 65 48.00 1.00 2.00 3.00
20 B/6" PC2 66 48.00 1.00 2.00 3.00
21 B/6"' PC2 67 48.00 1.00 2.00 3.00
22 B/6"' PC2 68 48.00 1.00 2.00 3.00
23 C/6" PC2 69 48.00 1.00 2.00 3.00
24 C/6" PC2 70 48.00 1.00 2.00 3.00
25 C/6"' PC2 71 48.00 1.00 2.00 3.00
26 C/6"' PC2 72 48.00 1.00 2.00 3.00
27 D'/6 PC1 74 48.00 1.00 2.00 3.00
28 D"/6 PC1 78 48.00 1.00 2.00 3.00
29 A/3 PC2 5 45.00 1.00 2.00 3.00
30 A/3 PC2 6 45.00 1.00 2.00 3.00
31 A/4 PC2 7 45.00 1.00 2.00 3.00
32 A/4 PC2 8 45.00 1.00 2.00 3.00
33 A/5 PC2 9 45.00 1.00 2.00 3.00
34 A/5 PC2 10 45.00 1.00 2.00 3.00
35 B/3 PC3 24 45.00 1.00 2.00 3.00
36 B/3 PC3 25 45.00 1.00 2.00 3.00
37 B/3 PC3 26 45.00 1.00 2.00 3.00
38 B/4 PC3 27 45.00 1.00 2.00 3.00
39 B/4 PC3 28 45.00 1.00 2.00 3.00
40 B/5 PC3 30 45.00 1.00 2.00 3.00
41 B/5 PC3 31 45.00 1.00 2.00 3.00
42 B/5 PC3 32 45.00 1.00 2.00 3.00
43 C/3 PC3 42 45.00 1.00 2.00 3.00
PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN
KODE KONFIGURASI TOTAL LAS
AS / KODE MIDDLE DAPAT SAMBUNGAN
NO. LAYOUT GRUP PEMANCANGAN KETERANGAN
GRID PILE 6 9 13 DIGUNAKAN
PILE
m' btg btg btg m' m'

a b c d e f g h i j k=g+h+i+j l

44 C/3 PC3 43 45.00 1.00 2.00 3.00


45 C/3 PC3 44 45.00 1.00 2.00 3.00
46 C/4 PC3 45 45.00 1.00 2.00 3.00
47 C/4 PC3 46 45.00 1.00 2.00 3.00
48 C/4 PC3 47 45.00 1.00 2.00 3.00
49 C/5 PC3 48 45.00 2.00 2.00 4.00
50 C/5 PC3 49 45.00 2.00 2.00 4.00
51 C/5 PC3 50 45.00 1.00 2.00 1.00 4.00 Sisa No. 049
52 D/3 PC2 57 45.00 1.00 2.00 3.00
53 D/3 PC2 58 45.00 1.00 2.00 3.00
54 D/4 PC2 59 45.00 1.00 2.00 3.00
55 D/4 PC2 60 45.00 1.00 2.00 1.00 4.00 Sisa No. 050
56 D/5 PC2 61 45.00 2.00 2.00 4.00
57 D/5 PC2 62 45.00 1.00 2.00 3.00
58 D/5 PC1 73 45.00 1.00 2.00 3.00
59 D/5 PC1 75 45.00 1.00 2.00 3.00
60 C/3 PC1 76 45.00 1.00 2.00 3.00
61 C/3 PC1 77 45.00 1.00 2.00 3.00
62 C/3 PC1 79 45.00 1.00 2.00 3.00
63 A/4 PC1 80 45.00 1.00 2.00 3.00
64 A/4 PC1 81 45.00 1.00 2.00 3.00
65 A/5 PC1 82 45.00 1.00 2.00 3.00
66 A/5 PC2 1 54.00 1.00 1.00 2.00 4.00
67 B/3 PC2 2 54.00 1.00 1.00 2.00 4.00
68 B/3 PC2 3 54.00 1.00 1.00 2.00 4.00
69 B/3 PC2 4 54.00 1.00 1.00 2.00 4.00
70 A'/6 PC2 19 54.00 1.00 3.00 4.00
71 A"/5' PC3 21 54.00 1.00 1.00 2.00 4.00
72 A"/6 PC3 22 54.00 1.00 1.00 2.00 4.00
73 B/6 PC3 23 54.00 1.00 1.00 2.00 4.00
74 B/6 PC2 37 54.00 1.00 3.00 4.00
75 B/6 PC2 38 54.00 1.00 3.00 4.00
76 D'/6 PC3 39 54.00 1.00 2.00 3.00
77 D"/6 PC3 40 54.00 1.00 2.00 3.00
78 A/3 PC3 41 54.00 1.00 2.00 3.00
79 A/3 PC2 53 54.00 1.00 3.00 4.00
80 A/4 PC2 54 54.00 1.00 3.00 4.00
81 A/4 PC2 55 54.00 1.00 1.00 2.00 4.00
82 A/5 PC2 56 54.00 1.00 1.00 2.00 4.00

SUBTOTAL II 256.00
TOTAL 277.00