1. This document provides monitoring data for the construction of foundation piles for Building FCSIT 2 at Mulawarman University.
2. It includes details on the planned and actual lengths of 40 piles, including depths driven at different sections and remaining lengths.
3. The total planned pile length is 2,340 meters while the actual remaining length after construction is 2,206.5 meters.
1. This document provides monitoring data for the construction of foundation piles for Building FCSIT 2 at Mulawarman University.
2. It includes details on the planned and actual lengths of 40 piles, including depths driven at different sections and remaining lengths.
3. The total planned pile length is 2,340 meters while the actual remaining length after construction is 2,206.5 meters.
1. This document provides monitoring data for the construction of foundation piles for Building FCSIT 2 at Mulawarman University.
2. It includes details on the planned and actual lengths of 40 piles, including depths driven at different sections and remaining lengths.
3. The total planned pile length is 2,340 meters while the actual remaining length after construction is 2,206.5 meters.
1. This document provides monitoring data for the construction of foundation piles for Building FCSIT 2 at Mulawarman University.
2. It includes details on the planned and actual lengths of 40 piles, including depths driven at different sections and remaining lengths.
3. The total planned pile length is 2,340 meters while the actual remaining length after construction is 2,206.5 meters.
PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN SISA PANJANG
KODE TOTAL PANJANG AS / KODE KONFIGURASI BOTTOM MIDDLE DAPAT TIANG TIANG PANCANG NO. LAYOUT GRUP TIANG PANCANG KETERANGAN GRID PILE PEMANCANGAN 6 13 6 9 13 DIGUNAKAN PANCANG PER TITIK PILE m' btg btg btg btg btg m' m' m' m' a b c d e f g h i j k l m=(gx6)+(hx13)+ n o=m-n p (ix6)+(jx9)+(kx13)+l
TOTAL 3.00 61.00 22.00 25.00 140.00 4.00 2,992.00 47.00 2,935.50 PROYEK UNIVERSITAS MULAWARMAN LAS SAMBUNGAN TIANG PANCANG GEDUNG FCSIT 2
PANJANG RENCANA REALISASI PEMANCANGAN POTONGAN
KODE TOTAL LAS AS / KODE KONFIGURASI MIDDLE DAPAT SAMBUNGAN NO. LAYOUT GRUP PEMANCANGAN KETERANGAN GRID PILE 6 9 13 DIGUNAKAN PILE m' btg btg btg m' m'