ACCIDENT & INCIDENT REPORT


Date of Accident/Incident: 30-August-2021 Time: 7:00 AM

Principal Contractor: GENERAL AGENCIES


AND CONTRACTING
Contract #: PIC R-7505

Location of Accident/Incident: TAMA PS #1 Coordinates: T-10 FLOOD


CHANNEL
HSE Manager: KHIZAR HAYAT Telephone: 0596191043

If this is an accident that required any form of medical treatment, go to Box 1:

If this indecent resulted in no person injured, go straight to Box 2:


Box 1 - Details of injured person N/A NO INJURIES RECORDED

Name: Age: Date of Birth:

Employer: Employed as:

Married / Single:
Nationality:

Injury sustained: Treated in Site First Aid Room or sent to


Hospital:
(and mark on diagram below)
(circle relevant)

Fatality First Aid Hospital Env-Incident


Iqama # Hospital Sent to:

1
Sensitive
HSE-FOR-01-02

Box 2 - Property Damage only

Damage caused by:

Buried Services strike

RTA

Environmental

Theft

Other (give detail) DUMP TRUCK DRIVER CABIN DAMAGE

Box 3 - Equipment Involved

Vehicle Registration #: SUA 3107

Plant Serial #: RSO76WZZ1ED06536

Material Description: HYDRAULIC CYLINDER AND DRIVER CABIN DAMAGED

Box 4 - Other Companies involved & Authorities

Company:

Contact #:

Box 5 - Accident / Incident Description

On the 30th of august at 6:00 AM, workers are preparing for the Pre task Briefing at the job
site prior to start of hauling activities and asphalt works. Usually 5 to 6 dump trucks are
hauling for asphalt and base course activity at site. Mr. Benedicto Agplaza one of the dump
truck drivers arrived at the working site for his first trip. He is working for PIC R 7505
project for 6 months and he is familiar with the site access and egress and working site.
When Mr. Benedicto Agplaza reach the dumping area he immediately unloaded a half load
of the base course material when suddenly the hydraulic cylinder snaps and had a failure
due to the load the dump box tilted to the left side and over turned the dump truck.

The driver and supervisor immediately called safety department and construction
management to report the incident. They claimed that it was due to hydraulic lifting
cylinder failed during unloading of the material. No injuries have been noted to the driver.

HSE-FOR-01-02 2
Sensitive
Box 6 - Immediate Causal Factor (refer to appendix 4)

Not following Procedures

Using incorrect or damaged tools / equipment

Safety Devices / guards not secure or removed, or PPE not used

Inattention, lack of awareness or poor decision / judgement

Horseplay / Violence

Guards or PPE did not work correctly

Defective tools or equipment

Environmental (fire, noise, temperature, chemicals, act of nature)

Workplace environment (electrics, lighting, ventilation, restricted space,


housekeeping)

Other – (give detail)

Box 7 - Contributory Causal Factor (refer to appendix 4)

Physical capability / condition of person

Hazards not identified on risk assessment / method statement

Lack of knowledge / training

Conflicting instructions

Poor supervision / leadership

Poor sub-contractor

Poor engineering design

Poor planning / method statement

Poor materials used

Poor storage of materials / equipment

Poor tools / equipment used

No maintenance / servicing conducted on equipment

Policies & Procedures not enforced

Poor communication / no pre-task briefing

Other – (give detail)

HSE-FOR-01-02 3
Sensitive

Box 8 - Photographs

HSE-FOR-01-02 4
Sensitive

Box 9 - Accident / incident sketch including critical dimensions

Box 10 - Other documentation attached to this report:

HSE-FOR-01-02 5
Sensitive

Witness Statements

Equipment Inspection records

Operator Licences

Risk Assessment

Method Statement

Pre-Task Briefing

Other Training Records

Any other relevant documentation

Box 11 – Actions Taken

Initial (at time of accident):


 Area was isolated with soft barricades
 No injuries were found during evaluation of the driver.
 RCSG has been informed.
 Legal authorities such as insurance and traffic police has been informed as well.
 Lifting plan and recovery plan was prepared and initiated to remove the dump truck at site.
 RA was done for lifting activity.
 Dump truck was removed from the site and sent to workshop.

Remedial (to prevent accident / incident occurring again):

 Refresher training has been conducted for drivers and operators of dump trucks on how to use
daily equipment checklist.
 Equipment checklist must be routinely followed by operators, Equipment checklist was not specific
to the equipment and did not cover visual inspection of the hydraulic ram, Checklists to be
updated to be equipment specific.
 Regular maintenance of all equipment by mechanic & maintenance register maintained.
 Close supervision of supervisor and Driver/operator competency evaluation should be
monitored. (Register of Equipment & Operator to be maintained by company – this should include
MOT/Inspection Records, 3rd parties, Licenses and expiration dates.)
 Disciplinary actions upon noncompliance of daily equipment checklist and poor equipment
maintenance.
 RA and method statement was provided for specific job task. RA to be reviewed and updated to
ensure it covers Equipment maintenance and inspection.
 Equipment inspection record has been updated with workshop and transport department. Should
say ‘Equipment Inspection Record had expired, requires updating with workshop and transport
department.

HSE-FOR-01-02 6
Sensitive
 Transport department has been informed to update all requirements regarding MOT such as
periodical inspection, registration and insurance of vehicle.

Box 12 – Lessons Learned (refer to appendix 4 findings)

The accident happened due to hydraulic jack failure. After further investigation The fitness report of truck
was found expired. The driver have KSA driving license but no third party training for operating dump box
hydraulic cylinder standard operating skills. Poor maintenance of the vehicle.

Box 13 - Details of person filling out this


report
Name: Khizar hayat Contact Phone Number: 0596191043

Position: HSE MANAGER Contractor: GENERAL AGENCIES AND


CONTRACTING
Date: 30/AUGUST/2021 Time: 13:00 PM

HSE-FOR-01-02 7
Sensitive

ATTACHEMENT

SAFETY TRAINING
SAFETY TRAINING FOR DRIVERS & OPERATORS
August 31, 2021

HSE-FOR-01-02 8
Sensitive

LESSON LEARNED
30TH AUGUST 2021

Incident Type: Dump Truck Over Turn

Incident Summary and Discussion of Activities

On August 30, 2021 around 07:05 am, a GAC dump truck turned over on its side while dumping base
course material at Pump Station # 1 access road construction area.

The driver and supervisor reported that hydraulic cylinder jack of dump box was failed during
unloading material.

No injuries has been found.

Immediate and System Causes

• The driver act to dumping material perceived as a low risk activity.


• Fitness certificate for dump truck was expired.
• The dumping area was not well compacted and stable.
The driver have KSA valid driving license but no third party training for operating dumping
operations.

Corrective Actions/Recommendations

GAC immediate safety recommendations and actions taken are as follows:

• Provide spotter and supervisor for close monitoring.


• Conduct Safety Stand down for all drivers & site supervisors.
Equipment certification has been evaluated.

Contact Information
Engr. Khizar Hayat
Safety Manager
+966596191043
k.hayat@gacksa.com

HSE-FOR-01-02 9
Sensitive

DRIVERS LICENSE AND MOT RECORDS

HSE-FOR-01-02 10
Sensitive

HSE-FOR-01-02 11
GENERAL AGENCIES & CONTRACTING (GAC)

Form No. RC/GAC/HSE/RA/003 GRADING, EXCAVATION, BACKFILLING RISK ASSESSMENT PROJECT: - PIC R-7505

Task: Construction of security fence. Update: 5/09/2021.

Assessed by: Mr. Charles Doria Reviewed By: Eng. .Khizar Hayat Approved By: RC

ACTION / GENERAL RISK / INITIAL RISK CONTROL MEASURES TO BE TAKEN RESIDUAL RISK
HAZARD SOURCE POTENTIAL RESPONSIBLE
CONSEQUENCES Likelihood Initial Severit likelihood Residual PERSON
Severity Risk y risk
Factor factor
Site preparation & Poor Housekeeping (Slips and 1. Apply permit to work procedure to
Mobilization. trips) control the risk.
Arrangement of all Improper manual handling 3 4 12 2. Ensure all workers comply with PPE 2 2 4
required tools (Body pain & muscles strain policy.
Equipment and due to improper handling of 3. Install detour as par standard 1m away
safety items at work materials) from excavation edge and provide
site. safety signs.
Barricade the work Workers getting collided 4 4 16 4. Barricade the area of boom truck 3 2 6
site with Concrete hit/Run over by the boom operation and only competent workers
new jersey using truck, other equipment, and be allowed for load lifting operation.
boom truck. by in coming vehicular traffic. Ensure the flagman deployed and the Execution
traffic diverted. Competent operators supervisor,
Loading/offloading, slip and 4 4 16 and certified equipment to be used with 1 2 2 Safety officer
falls, Snapping of load from proper supervision.
the boom truck (Personal 5. Use appropriate type of sling or chain
injury/ fatality due to falling for lifting and discard the same if found
or collision by the load being damaged and unsuitable for use. Out
lifted. 4 4 16 riggers must be stowed in position 2 2 4
6. Thorough supervision and deploy
Physical injury to the worker security guards.
if they trip over equipment. 7. Provide necessary safety signs –Men at
3 3 9 work and lifting progress. 2 2 4

Page 1 of 6
ACTION / GENERAL RISK / INITIAL RISK CONTROL MEASURES TO BE TAKEN RESIDUAL RISK
HAZARD SOURCE POTENTIAL Initial Residual RESPONSIBLE
CONSEQUENCES Likelihood Risk Severity Likelihood risk PERSON
Severity
Factor factor

Movements of Equipment and vehicle 1. Give way to the speeding vehicles on highway
equipment (Boom collision with incoming traffic. before entering.
Truck, Excavator, Equipment overturning or 2. Do not over speed; follow the traffic rules, signs
Dump truck. flipping over and signals displayed.
Personal injury 4 4 16 3. Exercise caution while maneuvering work in
progress area.
4. Install warning signs to alert the traffic about
the work in progress. 3 2 6 Job supervisor,
5. Heavy equipment always to be escorted while Operator,
maneuvering on highway due to its speed driver.
limitations.
6. Avoid sudden and harsh braking.
7. Competent and trained operator to be assigned.
8. Operator and drivers to use roll over protection
system (Seat Belt).
9. Equipment operators wear appropriate PPE.

Equipment break Equipment overturning or 4 4 16 1. Every piece of equipment that has safety 3 2 6
down/failure flipping over critical features must be inspected regularly.
Personal injury The frequency of inspection, the ‘inspection
schedule’, should be based on the risk
assessment for the operation and use of the
equipment.
2. Assessing the hydraulic fluid filtration system.
3. Inspecting the hydraulic cylinder rod-here,
you’ll want to look for any weaknesses, wear,
or stress. This inspection is crucial because a
bent or rough rod may damage the seals or
cause leakages.
4. Inspect the bolts and pins.

Page 2 of 6
1. Apply PTW procedure and make sure utility
Damage underground utilities
Grading clearance
Excavation Collapse of cavity walls 2. Scan the area with utility detecting devices and
Backfilling marked.
Injury to workers-possibly
Compaction. 3. Coordinate with concern authorizes in case of
fatal
utility.
Physical injury to the worker 4. Follow the utility stakeholder instruction to
if they Trip over equipment. deal with utility.
Equipment, material and 5. Pre task briefing should be conducted and
worker falling in excavated explain work method statement and risk Execution team,
area. 4 4 16 assessment. 3 2 6 Safety officer
6. Tool box talk conducted before start of activity
Suffocation and WRULD and discuss hazard related to activity.
7. Where the services is in the vicinity of the
planned excavation, trail holes should be dug
by manually.
8. Mechanical excavators and power tools not
used within 0.5m of the indicated service lines
9. Exposed services protected with suitable
identical.
10. In case of shifting of utility must coordinate
with stakeholder.
11. Clear marked required area and escape from
both sides 1.6m away from excavation edges.
12. Make sure third party approved competent
person of excavation.
13. Make sure sloping as required.
14. If required makes benching as par standard.
15. Ensure the equipment maneuvering and
operating area is barricaded and 1.6m distance
from edges.
16. Certified equipment and competent operator is
assigned.
17. Damping of material 1.6m away from
excavation to avoid falling hazard.
18. Make sure gas test before start of activity.
19. Apply PTWC and control activities by applying
Safe system of work.
20. Provision of banks man.
21. Apply dust control policy as mentioned in
Environmental plan.
22. Isolate workforce activity to plant operation.
23. Takes frequent breaks.
Page 3 of 6
24. Make sure fresh drinking water igloos.
25. Provision of temporary facilities at site.
26. Emergency evacuation plan and emergency
contact number display at site locations.
Adverse Weather Heat stress, cold effects, 1. Provide clean and cold drinking water
conditions fatigue, respiratory illness, eye 2. Rest shelter to rest between rounds of work and
injury. 4 4 16 toilet facilities. Site
Vehicle and equipment 3. First aid Facilities and First aider. 2 2 4 management,
operational hazards 4. Appropriate and suitable PPE. Safety officer
(Collision, overturn etc.). 5. Stop all critical activities including confined
space and excavations. Resume after the
weather condition is conducive to work.

Injury to workers Use of Proper PPE


Spray regularly with water to keep the dust in control
Respiratory disease 3 3 09 2 2 4 Job supervisor,
Dust emission
Damage to equipment due to Safety officer
fine dust
1. Ensure right place for the right thing at
Site cleaning and Poor housekeeping sight at all times. Maintain the site good
grubbing. 4 3 12 clean and tidy. 2 2 4
Slip trip fall 2. Clear all access and aggress, area should Execution
be clean and clear. supervisor,
Manual handling 3. Avoid manual handlings use mechanical
handling devices. If unavailable, follow
safe manual handling procedures.

Page 4 of 6
Workforce gathering Comply with
Coronavirus Congested work area: a.Ministry of health instructions
COVID-19 In case to workers contact b.RC Technical Affair division & COVID-plan
with each other’s they may c.GAC COVID-19 prevention plan.
effected COVID-19. .. Hand sanitizer available
Prtial /complete illness and .. Use face mask
fatality. .. Use disposable drinking cup one time.
.. Wash your hands many time a day.
.. Maintain social distance. All Execution
4 4 16 .. Save others to keep distance. 2 2 4 team operators,
.. Temperature checking area Workforce etc.
 Keep safe distance from moving equipment and
lifting load.
Maintain social distancing.
 Avoid workforce gathering and make sure
proper social distancing.
 Ensure all workers comply with PPE policy
specially face mask + hand gloves.
 Provision of temperature checking devise.

Page 5 of 6
1 2 3 4 5
Severity Matrix
1 1 2 3 4 5
1 - Very unlikely - Could happen but never in this construction field.
2 - Unlikely - Could happen but rarely. 2 2 4 6 8 10
3 - Possible - Could happen at some time.
3 3 6 9 12 15
4 - Likely - Could happen at any time.
5 - Very likely - Could happen frequently. 4 4 8 12 16 20

5 5 10 15 20 25

OCCURANCE PROBABILITY (O)


RISK ASSESSMENT
MATRIX 1 2 3 4 5
VERY
VERY UNLIKELY UNLIKELY POSSIBLE LIKELY
LIKELY
SEVERITY (S)

1 NEGLIGIBLE LOW LOW LOW LOW MEDIUM


1-4 Low Risk

2 MARGINAL LOW LOW MEDIUM MEDIUM MEDIUM


5-9 Median Risk

3 CRITICAL LOW MEDIUM MEDIUM MEDIUM HIGH

10-25 High Risk


4 SEVERE LOW MEDIUM MEDIUM HIGH HIGH

5 CATSTROPHIC MEDIUM MEDIUM HIGH HIGH HIGH