IRAQ BADRA

CPF PHASE-II
PHASE PROJECT

Requisition
for
Metering System

A 16-Nov-2012 Forr Approval A.MATILLA K.Y.KIM S.W.KIM K.H.SONG

Written Checked Approved


Rev. Date Status PM
By By BY
DOCUMENT
GB090-ZZZZ
ZZZZ-250-IN-MR-004
NO.
CONTRACT
-
NO.

SECL JOB NO. PG 0085

TOTAL PAGES 12 (Include Cover Sheet)

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 2 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

SUMMARY OF DOCUMENT REVISIONS

Rev. Date Revised Section Revised Revision


vision Description

A 16-Nov-2012 For Approval Issue for Approval

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 3 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

TABLE OF CONTENTS
1 Client ................................................................
................................................................................................
......................................................... 4

2 Project ................................
................................................................................................................................
....................................................... 4

3 Location ................................
................................................................................................................................
.................................................... 4

4 Commodity and Quantity ................................................................................................


...................................................... 4

5 Codes and Standards ................................


................................................................................................
............................................................. 4

6 Document & Specification ................................................................................................


...................................................... 4

7 Conflict ................................
................................................................................................................................
..................................................... 5

8 Deviation from Purchaser’s requirements ................................................................


......................................................... 5

9 Scope of Supply and/or Work ................................................................................................


............................................... 5

10 Documents ................................
................................................................................................................................
............................................... 6

11 Inspection and Test ................................................................................................


................................ ................................................................ 6

12 Attachment ................................
................................................................................................................................
.............................................. 7

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 4 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

CONDITIONS STATED HEREIN AS WELL AS ANY DOCUMENTS ATTACHED TO THIS REQUISITION


TAKE PRECEDENCE OVER ANY CONDITIONS WHICH MAY APPEAR ON SUPPLIER'S
SUPPLIER STANDARD
FORM. ANY VARIATIONS IN SUCH TERMS AND CONDITIONS WILL BE BINDING UPON US ONLY
AFTER OUR AGREEMENT IN WRITING ON SUCH VARIATIONS.

1 Client : GAZPROM NEFT BADRA B.V.

2 Project : Iraq BADRA CPF Phase-II Project

3 Location : Badra Field, IRAQ

4 Commodity and Quantity


Refer to the following and the attached specifications.
specifications

1. Crude Oil Metering System (below listed units only)


Item Commodity Quantity Remarks
U-21701 Oil Quality Measurement Unit 1 set
Meter Prover Unit 1 set

2. Gas Metering System


Item Commodity Quantity Remarks
U-25301 Gas Export Metering Package 1 set
U-25303 A/B Fuel Gas Import Metering Package 2 sets

3. LPG Metering System


Item Commodity Quantity Remarks
U-26301 A/B/C/D LPG Metering Package 4 sets

5 Codes and Standards

The applicable codes and standards are in the attached specification.

6 Documents & Specification

List of documents attached to this requisition (refer to Appendix-E)


Appendix

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 5 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

7 Conflict

7.1 If there are any conflicts between this requisition and the documents described
in section 5 and 6, this requisition shall govern. Vendor shall notify to the
purchaser of these discrepancies.

7.2 All deviations and alternatives from the Purchaser’s specification


specification shall be
submitted by the vendor in the format attached as Appendix--C to this requisition.

8 Deviation from Purchaser’s requirements

8.1 In case there are no deviations, vendor shall mention ‘NO-


‘NO DEVIATION’ on the
format in Appendix--C and submit with the quotation.

8.2 Issuance of ‘No Deviation’ confirmation by vendor means the quotation complies
with all inquiry documents and specifications.

9 Scope of supply/work

9.1 Scope of supply

(1) The vendor’ss scope of supply is in the attached specification

(2) Spare parts

The description, the quantity and the price shall be recommended and submitted
for the following spare parts

- Spare parts for Construction, pre-commissioning


pre commissioning and commissioning
- 3 Years operation & maintenance (Optional)

9.2 Scope of work

- Design - Manufacturing
- Inspection and test - Painting
- Export packing and transportation

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 6 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

10 Documents

10.1 The vendor shall submit the documents noted in Appendix A and the list for the
parts that are hazardous to the environment or to personnel. (ex. Asbestos,
Oils, VOCs, materials that reuse/recycling or reclamation is not possible.)

10.2 All documents shall state the name of Client(end


Client(end user), Job No., Requisition
No., Tag No. and the name of commodity.

10.3 All documents shall be written in English.

10.4 The vendor shall submit ‘Uncertainty Calculation’, ‘Measurement Manual’ etc.,
for each metering package as required by Iraq Ministry
Ministry of Oil code in the
attached flow diagram Appendix D.

11 Inspection and Test

11.1 Inspection and test items

Inspection and test in Appendix B are the minimum requirements.

11.2 Inspection and test procedure

Manufacturer's standard
(The procedure shall be submitted prior to the inspection and test for the purchaser's
approval.)

11.3 Inspection activities

A) Witnessing FAT Procedure for entire Metering System.

B) For Skid & Piping :


1. Review of WPS, PQR & Weld Plan.
2. Review of NDE Procedures.
3. Hydro Test & Leak Test.
4. Visual & Dimensional.

C)) Review of manufacturer’s


manufacturer test certificates, Exd, Zone-2,
2, IIB certificates for
pressure relief
lief valves, actuators, pressure & temperature transmitters, sampling
system, junction boxes, density meters, etc.

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 7 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

D) Witnessing calibration
alibration of Liquid Ultrasonic Meters, Liquid Turbine Meters, etc.

E) Witnessing
itnessing fitment, assembly, functional check of entire Metering system.

12 Attachment

Appendix A endor’s Data Requirement sheet


Vendor

Appendix B Inspection and Test requirements

Appendix C Technical Exceptions / Deviations format

Appendix D MoO Liaison Procedure Flow Diagram

Appendix E Attached Documents & Specification list

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 8 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

Appendix A: Vendor’s
s Data Requirement Sheet

The Vendor shall submit the following technical documents and drawings in English.

(c : Copies, e : Electronic files)


For For
No. Description For Final As Built Remarks
Quotation Approval
2 original +
1 Document (Item) list 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
2 Specification sheet 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
3 Calculation sheet 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
4 MTO 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
Dimensional Outline (including 2 original +
5 5c + 1es 10c + 1e 10c + 1e
weight & maintenance space) 10c+ 4cd
2 original +
6 Fabrication (mounting) detail 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
7 Spare Part List 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
8 Special Tool List 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
9 Wiring and Tubing Diagram 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
10 Catalogue 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
11 Inspection and Test Procedure 5c + 1e 10c + 1e 10c + 1e
10c+ 4cd
2 original +
12 Inspection and Test Report - - 10c + 1e
10c+ 4cd
2 original +
13 Certificate 5c + 1e 10c + 1e 10c + 1e Note 3
10c+ 4cd
Operation / 2 original +
14 - - 10c + 1e
Maintenance Manual 10c+ 4cd
2 original +
15 Compiled Final Document - - 10c + 1e Note 2
10c+ 4cd

Note :
1. The issue date of documents shall be as follows ;
(1) For Approval/Review : Within 3 weeks after Purchase Order
(2) For Final : Within 3 weeks after approval of "For Approval/Review"
(3) Compiled Final Document : After approval of "For Final"
2. Refer Instruction for Vendor Documentation
3. The equipment of explosion-proof
explosion proof enclosure shall be provided with certificate issued by
appropriate authorities specified on General Notes of Data Sheet.
4. Installation, Operation and Maintenance manuals shall be submitted in 2 original + 10C + 2CD
additionally separate from “FINAL (*)(FOR RECORD)” documents in different binders.

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 9 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

Appendix B: Inspection and Test

No. Inspection and Test Quantity Remarks


Visual Inspection
■ Verification of dimensions, 100%
1 specification, accessories, painting, etc


Pressure/leak test
■ Hydrostatic 100%
■ Air tightness 100%
2
□ Nitrogen leak


Performance test
■ Functional Operational
perational Test 100%
■ Seat Leakage 100%
■ Diaphragm Air Leak Test 100%
3 □ E/P Positioner Configuration 100%

Insulation resistance test


□ Insulation resistance
4 □ Dielectric strength -


Others
■ Material Inspection 100%
5
■ Painting Test 100%


Note :
1. Inspection and Test as per by ITP

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 10 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

Appendix C: Technical Exceptions / Deviations

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 11 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

Appendix D: MoO Liaison Procedure Flow Diagram

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 12 of 12

DOC. NO. GB090-ZZZZ-250-IN-MR-004 REV. A

Appendix E: Attached Documents & Specification list

No. Document No. Document Title Metering Rev. No

Iraqi National Code for Measurement st


1 - common 1 Edition
of HC Fluids
Annex 1.1 Attachment 7. Technical
2 Annex 1.1 CRUDE Final
Requirements For Crude Oil Metering
Annex 1.1 Attachment 8. Technical
3 Annex 1.1 GAS Final
Requirements for Gas Metering
Annex 1.1 Attachment 9. Technical
4 Annex 1.1 LPG Final
Requirements for LPG Metering
5 Annex 1.11 Scope of Work – Instrumentation common Final

6 - Piping Material Specification common P

7 - Metering System in Plot Plan common -

8 - U-21701 Crude Oil Metering scope CRUDE -


U-21701 GAD for Meter Proving
9 GB088-2013030029-IN-C01
C01-003 CRUDE A
System
10 GB088-2013030029-IN-D03
D03-001 U-21701 P&ID for Metering System CRUDE B
U-21701 P&ID for Metering Sampling
11 GB088-2013030029-IN-D03
D03-002 CRUDE A
System
U-21701 P&ID for Meter Proving
12 GB088-2013030029-IN-D03
D03-003 CRUDE A
System
U-21701 System Architecture
13 GB088-2013030029-IN-D06
D06-002 CRUDE B
Drawing
U-21701 Sampling System
14 E03-006
GB088-2013030029-IN-E03 CRUDE A
Datasheet
15 GB088-2013030029-IN-E03
E03-007 U-21701 Analyzer Datasheet CRUDE A
U-21701 Densitometer & BS&W
16 GB088-2013030029-IN-E03
E03-008 CRUDE A
Datasheet
17 7077T-000-CN-0006-001
001 Project Design Criteria common 01

18 7077T-000-JSD-000-001
001 Process Basis of Design common 04
Job Specification for Flow Metering
19 7077T-000-JSS-1584-001
001 common 02
Station
20 7077T-000-PP-0000-108
108 List of Codes and Standard common 00

This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.