GB090-ZZZZ-250-IN-MR-004 - RFQ For Metering Systems Rev.a - 11162012
GB090-ZZZZ-250-IN-MR-004 - RFQ For Metering Systems Rev.a - 11162012
CPF PHASE-II
PHASE PROJECT
Requisition
for
Metering System
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 2 of 12
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 3 of 12
TABLE OF CONTENTS
1 Client ................................................................
................................................................................................
......................................................... 4
2 Project ................................
................................................................................................................................
....................................................... 4
3 Location ................................
................................................................................................................................
.................................................... 4
7 Conflict ................................
................................................................................................................................
..................................................... 5
10 Documents ................................
................................................................................................................................
............................................... 6
12 Attachment ................................
................................................................................................................................
.............................................. 7
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 4 of 12
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 5 of 12
7 Conflict
7.1 If there are any conflicts between this requisition and the documents described
in section 5 and 6, this requisition shall govern. Vendor shall notify to the
purchaser of these discrepancies.
8.2 Issuance of ‘No Deviation’ confirmation by vendor means the quotation complies
with all inquiry documents and specifications.
9 Scope of supply/work
The description, the quantity and the price shall be recommended and submitted
for the following spare parts
- Design - Manufacturing
- Inspection and test - Painting
- Export packing and transportation
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 6 of 12
10 Documents
10.1 The vendor shall submit the documents noted in Appendix A and the list for the
parts that are hazardous to the environment or to personnel. (ex. Asbestos,
Oils, VOCs, materials that reuse/recycling or reclamation is not possible.)
10.4 The vendor shall submit ‘Uncertainty Calculation’, ‘Measurement Manual’ etc.,
for each metering package as required by Iraq Ministry
Ministry of Oil code in the
attached flow diagram Appendix D.
Manufacturer's standard
(The procedure shall be submitted prior to the inspection and test for the purchaser's
approval.)
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 7 of 12
D) Witnessing calibration
alibration of Liquid Ultrasonic Meters, Liquid Turbine Meters, etc.
E) Witnessing
itnessing fitment, assembly, functional check of entire Metering system.
12 Attachment
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 8 of 12
Appendix A: Vendor’s
s Data Requirement Sheet
The Vendor shall submit the following technical documents and drawings in English.
Note :
1. The issue date of documents shall be as follows ;
(1) For Approval/Review : Within 3 weeks after Purchase Order
(2) For Final : Within 3 weeks after approval of "For Approval/Review"
(3) Compiled Final Document : After approval of "For Final"
2. Refer Instruction for Vendor Documentation
3. The equipment of explosion-proof
explosion proof enclosure shall be provided with certificate issued by
appropriate authorities specified on General Notes of Data Sheet.
4. Installation, Operation and Maintenance manuals shall be submitted in 2 original + 10C + 2CD
additionally separate from “FINAL (*)(FOR RECORD)” documents in different binders.
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 9 of 12
□
Note :
1. Inspection and Test as per by ITP
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 10 of 12
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 11 of 12
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.
IRAQ BADRA
CPF PHASE-ll PROJECT
DOC. TITLE REQUISITION FOR METERING SYSTEM PAGE 12 of 12
18 7077T-000-JSD-000-001
001 Process Basis of Design common 04
Job Specification for Flow Metering
19 7077T-000-JSS-1584-001
001 common 02
Station
20 7077T-000-PP-0000-108
108 List of Codes and Standard common 00
This document, including any patented or patentable features, embodies confidential information of Samsung Engineering Co., Ltd. And its
use is conditioned upon the user’s agreement not to reproduce the document in whole or in part. Nor the material described thereon
th nor to
use the document for any purpose other than specifically permitted
permitted in writing by Samsung Engineering Co., Ltd.