Ayman Moussa

EPC Construction Manager / Project Engineer -Oil& Gas, On-Offshore-Saudi Arabia

Personal Info. Professional Summary:


 Proactive & highly skilled site Construction Manager of EPC projects with
22+years of construction, installation, hook up /maintenance experience in oil/gas
+966539177393, projects experience in on/offshore projects, Pipelines, fabrication yards, jacket
+966580320382,
+201011009125
fabrication, offshore hook up activities, offshore rehabilitation platforms,
Ayman.Moussa@yahoo.co refinery& Gas plants, commissioning, Tie-Ins, H.D.D, oil processing, Refinery,
m. commissioning /hydro testing &shutdowns projects, in safe environments, within
 D.O.B: 10th Aug.1973 scope, schedule, budget deadlines, quality standards, HSE regulations, risk,
 Have a Saudi transferable potential risk analysis & control.
Iqama.
 Competent in communications, strong relationship and coordination skills with
 Driving license Egypt, Qatar& stakeholders, proven capability leading large scale of workers, building competent
Saudi Arabia teamwork &strong leadership.
 B.SC of Mechanical
Engineering, Helwan University
 Marine fabrication yard experience and Rehabilitation of the old production
1999 platforms, pipelaying and equipment’s installations
 Proficient in pipeline, piping & steel structure construction activities in
Management Skills: green/brown fields, on/offshore, in additional to well-known of fabrication of
vessels, offshore jackets, civil, electrical / instrumentations, shutdowns,
 Strong leadership, adaptable, installation of equipment, vessels, revamping of platforms storage tanks &
Innovative, Service-focused, commissioning &startup.
motivative &creative.
 Focused and diligent with expertise in resource allocation. Strategic Construction
 Decision-making, Thinking
Ahead, conflict &problem-
Manager with demonstrated success assessing project scope and adhering to
solving deadlines. Safety-conscious and detail-oriented.

 Scheduling& budgeting Experience:


deadline obligation
Site Const.Team Leader SICIM Saudi Arabia 09/20-
 Problem-solving, root cause 12/21
analysis, ability to
recommend proper  Daily supervising the overall construction site activities related to coordination,
solutions. planning, scheduling, milestones, prioritizations’ coordination with key
stakeholders and resources optimization of Jazan-Abha refined products pipeline
 Resources coordination & project, control field change proposals, site team &contractors performance
allocations management.
evaluation.
 Strong organizational skills
manage logistics& critical
 Build excellent communications, technical guidance for site staff, build
thinking ahead. relationships with project teams and governmental for proper interface, vendors&
client rep. effective manage time, budget and risk, providence of proper site
 Excellent influencing and progress reports to PM& Aramco PMT.
communication skills oral&
written, proactive goal-  Facilitate time-saving by Coming up with efficient methods and tools ideas that
orientated approach. improved project progress.
 Effective negotiation &  Demonstrate strong leadership and guidance to ensure the site team is working
speaking skills. effectively to achieve the project goals within contractual obligations, work front,
 Vendor and Material guide to encourage the safety culture among project teamwork.
management skills.  Record project progress details, resources allocation, control budget, analyze
 Strategic planning, use performance, generate progress & performance reports, implement preventive &
Project Management tools corrective actions which enhance the performance of the overall project.
such as EVM, KPI.
Const.Manager GAS ARABIAN SERVICES CO. Saudi Arabia
 Logistics management. 01/16-09/20
 Familiarity with Microsoft  Developed and executed pre-construction milestones on project schedule.
Office tools and AutoCAD,
MS Office.  Managed construction schedules to achieve adequate labor coverage for all
projects.
 Analytical skills
 Consulted with clients, consultants, subcontractors, supervisors to define
 Team Building & leadership
skills. objectives and develop scopes.
 Supervise & manage construction progress on day-to-day basis activities of 24-
person team of contractors to promote productivity and efficient use of resources,
maintaining on-time and under-budget project delivery.
Courses
 Supervising the labor force, monitoring subcontractors, checking materials,
 Engineering Syndicate inspecting work, Tie-Ins, work priorities, Corrective actions& change requests
membership: Egyptian and overseeing quality control.
&Saudi Council of
Engineers  Regularly Communicated with vendors, subcontractors, client and site supervisors
to keep project fully operational.
 PMI-PMP Certified.
 Directed day-to-day operational aspects of project and scope and monitored
 PMI-RMP Certified.
progress of construction activities, read plans and blueprints and communicated to
 OSHA-Construction Safety workers.
and health-166995-170
 Ensured projects were completed according to approved time, quality and cost
 ASME B31.1, ASME B estimates.
31.3& ASME B31.
 Held construction progress and regular status meetings with project team.
 Communication skills.
 Kept sites compliant with HSE regulations to prevent unnecessary delays.
 Pipeline’s construction.
 Regulated and managed construction plans, materials, budgeting and staff to
 Pumps Technology/Valve complete project.
selection/Resources
management.  Increased customer satisfaction ratings by resolving all issues professionally.
 Natural Gas Processing,  Scheduled workforce needs with superintendents and allocated company
Pump’s technology. resources to meet project requirements.
 Valve selection  Adherence with S. Aramco HSE regulations and closely monitor with HSE team
&Communication skills. to enhancing HSE performance at site.

Languages:
 Issue the lesson learned for the project records along the project life cycle.
Assist C.M& piping lead GS E&C- ERC project -Egypt
English: Fluent 04/017-01/016
Arabic: Native
 Direct and lead piping construction activities and completion of project phases,
Projects participated in project milestones, fabrication and erection, work packages preparation,
 16” Abha-Jazan refined commissioning activities, resources allocation to ensure meet the cost, schedule,
products P/L,16” &12” HSE, quality, as per contractual obligations and deadlines for the piping scope of
Dahran-Abqaia Gas& Oil vacuum distillation, sulfur recovery, acid gas removal, hydrogen production,
P/L Development. raw& wastewater treatment unit.
 18” /12” Yamama new plant
 Planned, organized, coordinated, and controlled all contractors/subcontractor’s
Oil&Gas P/L, 30" SASREF
to SIPCHEM S. S line, 18" execution performance and supervised the labors force, System &sub-system
GAS -King Abdulla package in accordance with established policies& procedures requirements to
Economic City P/L. drive for test package completion.
 16” Fuel Gas P/L  Develop strict control & tracking over costs or management of changes,
Sabic/Methanol& reviewing variances from budgeted expenditure and recommending/initiating
Fabrication of 280000 “CS - action to bring them under control. Discusses and resolves daily site problems
Harad/Saipem development. with site supervisors.
 4 Jackets& quarters  Monitors construction progress reports & regular meetings to eliminate any
Offshore-Maersk Qatar – conflicted troubles or clashes at site. provides the regular reports accordingly
fabrication& installation.
 Interface coordination with Civil, electrical, steel structure, Quality, tanks
 36” Offshore Pipelaying -
Qatar Gas II P/L.
installation, and Mechanical disciplines for proper sequence and avoid any
conflict of activities.
 2 Jackets fabrication and
installation for Amapetco. Manager-Const. Manager Offshore – Gupco/Amapetco-Egypt 03/012-
07/014
 2 Jackets fabrication and
installation for Gupco-  Holds complete responsibility to work across phases on offshore platforms.
Saqqara.
 Solution oriented with capability to work under pressure to meet contractual
 12” offshore pipelaying milestones.
trunk line.
 Construction of 2 offshore platforms, drilling 18 wells and pipeline connection
 ERC Mega Refinery plant with risers to existing onshore facility.
Project – Mustard – Egypt
New Egyptian Refinery  On Shore phase - preparations of Electronic Permit to Work System “Offshore
Plant construction and Manager” to be utilized offshore including creation of Permit to Work procedure.
installation.
 Verification and planning of personnel resources and vendors required, in
 Revamping/ Rehabilitation cooperation with back office team, organizing and verification of materials with
offshore complex platforms back office team.
BP. Red-Sea.
 Supervision and verification from client side of contractor T&I and construction
 16” Offshore P/L-18 KM. team.
 Boat Landing replacement  Supervision of Jackets & Platforms Transport & Installation activities.
&10” Gupco-onshore new
oil U/G- P/L.  On Shore phase – Initial requisitions, preparation of various procedures and
necessary checklist for planned operations during construction and
 Onshore Qatar-Modification
of Gas Interim Receiving commissioning phase.
Facilities. Dolphin Energy  Takeover platform form Shipyard and setting up permit to work system and
Limited Co. Ras Laffan. Emergency organization.
 Onshore-Natural Gas
 Verification of documentation related to T&I and construction activities offshore,
Liquid-Shutdown-.NGL
Plant- QP-Measied- Qatar. Planning offshore activities and review and site, coordinate with the offshore
barges / vessels and client rep’s, manage Company hired vessel operations and
 Onshore-Common Low vessel readiness.
Sulphur Condensate Storage
and Export Facilities.  Update looks ahead plan and overall offshore schedule.
Dolphin-Qatar.
 Work closely with project teams, engineering, procurement, contracts, and
 4- Melamine & Urea fabrication yard
Upgrade Plant- QAFCO. Review the installation procedure and lift plans.
 32”,24” &18” Onshore-Qasr  Interface with other project’s functions (work packages, Quality, HSE, logistic
Gas Development Project - etc., Interface with Contractor’s operation, reviewing subcontractor technical
Khalda/ Apache, 12” &8” applications responsible of project HSE related and ensure the compliance with
P/L-Merlon &Offshore-
Saqqara 18”-Gupco-BP.
the project regulation.

 Onshore-Gas Pre-  initiate Company claims and verify with contract teams, SIMOPS management,
Compression Plant -Phase II Project daily meeting attendance and reporting and Process owner for Site
Shell. Egypt. queries, Deviation request and NCR.
 Installation of static &  Review the overall plan, areas of concerns, prioritizations, risk-mitigating
rotating equipment& actions. control change requests, technical requisitions, Interface with client rep.
modules: Heat Exchanger, in the project for proper performance evaluations, and project execution& hook
Shipping pumps metering, up phase
filtration skids, scrubbers,
air coolers, glycol  Define SOW, main objectives, milestones, prioritizations, man-hours duration,
dehydration, API separator resource requirements quality plan, procurement plan, assumptions, resources
(Pig traps) with associated allocations, potential risks, and staffing of the project.
piping.
 Oversee implementation of quality and safety standards and procedures are
 Gemsa onshore pipeline 20 implemented and followed in accordance with contract requirements and
KM Company guidelines.
 Surface piping connections
 Managing overall execution& fabrication activities on -day-to-day on/offshore
of two offshore oil wells
SE12 & SE13 of Gemsa operations interface hook up activities, jacket fabrication activities, work /test
offshore platform packages, installation of GRE -deluge system, static and rotating equipment&
punch list/box-up. and ensures the development of plans, procedures, and
 Modification (piping effective schedule& cost.
connection for offshore
facilities) of Gemsa offshore  Attendance of Shutdown meetings with clients/consultants and keeping them
platform informed of progress reports and aligning to work front and look ahead schedule.
 Surface piping connections Manager-Hook Up& Fab.Yard Manager Qatar Engineering& Const. co -Offshore
of new offshore oil well A- 09/07-03/012
11 of Al-Zaafarana offshore
platform  Overall supervision development and implement of Yard site fabrication for
jacket (piles, jacket frames,mudmat,caissions,rizers,braces) & planning to execute
 Fabrication & installation
new pressure vessel (gas
work, and follows up the activities and the work progress.
floatation unit) for FPSO Al- • Review installation procedure and ensure compliance with the contract
Zaafarana according to documents and Company specifications
ASME VIII div I • Manage and control the Interfaces between operation, contractor and
 Steel & piping revamping subcontractor teams to meet the shutdown duration and star up target date.
of FPSO Al-Zaafarana  Installation of new accommodation platform of 3500 MT by float-over method
Tanker.
while working in the office, handled detailed engineering, procurement,
fabrication & installation engineering to fabricate offshore installations till final
hand over to client.
 Responsible for readiness of all safety equipment’s, inspection, check-
walkthrough and reporting, monitoring of PTW system.
 Planning for Lifting plans, coordination and supervision of lifting operations on
platform and between connected units – platform connected with jack-up barge
 Ensure that all contractual obligations are satisfied as the company representative,
compliance with relevant legislation, codes of practice, guidelines, industry
standards, company policies and procedures applicable to the area of operation.
Update OIM on frequent intervals on operation and any changes.
 Control activities within 500m zone (Supply boat operation, Bunkering, Sub Sea
Survey in 500m zone, Cable pulling operation in 500m zone, Helicopter flights,
and construction works ensures that the Platform is properly and legally manned,
that all statutory surveys and certificates are kept up to date.
 Organizing and leading HAZID and RA meetings for jack up barge hook up and
other high risk planned activities during the campaign.
 Lead offshore site teams during the work progress, instrumentation, electrical,
mechanical, telecom, scaffolders, rope access and punch team.
 Closing punch items and outstanding commissioning dossiers with client.
 monitoring the progress by updating Project Plan, daily teleconferences and
DPRs.
 Responsible for the safe and efficient operation of the Platform in all aspects of
the Platform's various functions and operations.
 Creating and reviewing new emergency and operational procedures to company
Safety Management System.
 Lead and guide the marine project team activities for the best performance in
accordance with on/offshore project procedures, regulations standards, and
permit-to-work procedures as applicable, including relevant RLIC procedures.
 Ensures Marine Contractor Team construction, fabrication & installation
activities are aligned with scope, schedule, and budget deadlines, within quality
standards and contractual obligations.
 Re-organized the resources, scope, and procedures to get better progress and
effective HSE behavior, provides accurate, timely, and routine reports to the Head
Marine on project planning and execution activities
 Coordinate between on/offshore fabrication and installation operations included
administration and logistics issues, prepare job cards and hook up reports, resolve
execution and commissioning issues, define the detailed SOW, for offshore
installation, prepare the required resources for offshore (manpower, material,
equipment, maintenance, and repair schedule) as per the contractual obligations
and in line with the schedule/cost plan.
Offshore Senior Field Eng. NPCC-Offshore-Abu Dhabi
06/05-09/07
 Supervises the offshore construction of 36” Gas trunk subsea pipe lying with
length 38KM plus integrating and hook up and commissioning of Qatar Gas-
NFB complex. Included planning and coordination of resources.
 Demonstrate strong leadership and guidance to ensure the site team is working
effectively to achieve the project objectives within contractual obligations, scope,
schedules, quality& budget encouraging the HSE culture among project
teamwork.
 Managing the day-to-day logistic support to the hookup project in an efficient and
cost-effective manner, preparing the progress reports and issue logs relating to the
project as required to senior management.
 Ensure that project risk assessments are carried out as necessary and that the
correct mitigation is applied to reduce or eliminate the risk.
 Control of resource schedule& budget in accordance with the contract
requirements and monitor the project performance to ensure its timely
completion, performance improvement, and cost control.
 Participate in the identification of opportunities for continuous improvement and
sustainability of operations, processes, and practices considering project
standards.
 Attendance regular coordination meetings for monitoring of work progress, HSE,
and QC rules implementation.

Project /piping Eng. Bapetco/Khalda/Gemsa offshore 03/03-


06/05
 Surface piping connections of two offshore oil wells offshore platform
 Modification (piping connection for offshore facilities) of offshore platform
 Surface piping connections of new offshore oil well of Zaafarana offshore
platform
 Fabrication & installation new pressure vessel (gas floatation unit) for FPSO Al-
Zaafarana according to ASME VIII div I
 Steel & piping revamping of FPSO -Zaafarana Tanker
 Modification of water injection piping connections of the high-pressure pump
station
 Surface piping connections of offshore oil well SE11 of Gemsa offshore platform
 Construction of firefighting water storage tank according to API 650
 Modification of the offshore oil manifold & jet pumping package of Gemsa
offshore platform to accommodate the new wells
 Developed and executed pre-construction milestones on project schedule.
 Managed construction schedules to achieve adequate labor coverage for all
projects.
 Prepare Job Cards-Work/Test Packages, System/Subsystem packages, Method of
statements, Task Risk Assessment & Procedures Punch List, reinstatement for
Shutdown time
Project /piping Eng. ABB Petroleum/Khalda/Gemsa 06/099-
03/2003
 In charge for all mechanical construction activities such as piping, pipelines,
activities to extending of 340 Km U/G 18” &24” erection, welding, fabrication,
steel structural erection pipe rack, U/G piping, Test package, punch-list,
Shutdown Preparation for 2 GAS Plants for Tie-in& Hot tapping in addition to
equipment installation(stabilizers, flares, compressors, Dehydration PKG, Air
cooler, Heater, Separator, Slug Catcher, Pig traps, Degassing vessels, Methanol
injection, Mercury removal skid& Metering Skid)
 Ensure all contractual company and local authority requirements for Quality
documents and are developed and approved.
 Coordinate and control/interface with subcontractors’ other disciplines, vendors
on-day-to-day to ensure implementation of the scope of work.
 Attendance regular coordination meeting internally& with senior staff/vendors for
monitoring of work progress., schedule and cost aligning, HSE and Quality ITP
following up.
 Ensure all variations items are documented and acknowledged and confirmed for
the claim in accordance with direction by the construction manager.
 Prepare necessary method statements ensuring execution, quality, and Safety
documents are approved and implemented.
 Daily follow-up and monitoring of HSE regulations implementation, Quality
criteria, SOW, Schedule & budget cost control.