Professional Documents
Culture Documents
Ayman Moussa EPC Const - Manager Offshore
Ayman Moussa EPC Const - Manager Offshore
Languages:
Issue the lesson learned for the project records along the project life cycle.
Assist C.M& piping lead GS E&C- ERC project -Egypt
English: Fluent 04/017-01/016
Arabic: Native
Direct and lead piping construction activities and completion of project phases,
Projects participated in project milestones, fabrication and erection, work packages preparation,
16” Abha-Jazan refined commissioning activities, resources allocation to ensure meet the cost, schedule,
products P/L,16” &12” HSE, quality, as per contractual obligations and deadlines for the piping scope of
Dahran-Abqaia Gas& Oil vacuum distillation, sulfur recovery, acid gas removal, hydrogen production,
P/L Development. raw& wastewater treatment unit.
18” /12” Yamama new plant
Planned, organized, coordinated, and controlled all contractors/subcontractor’s
Oil&Gas P/L, 30" SASREF
to SIPCHEM S. S line, 18" execution performance and supervised the labors force, System &sub-system
GAS -King Abdulla package in accordance with established policies& procedures requirements to
Economic City P/L. drive for test package completion.
16” Fuel Gas P/L Develop strict control & tracking over costs or management of changes,
Sabic/Methanol& reviewing variances from budgeted expenditure and recommending/initiating
Fabrication of 280000 “CS - action to bring them under control. Discusses and resolves daily site problems
Harad/Saipem development. with site supervisors.
4 Jackets& quarters Monitors construction progress reports & regular meetings to eliminate any
Offshore-Maersk Qatar – conflicted troubles or clashes at site. provides the regular reports accordingly
fabrication& installation.
Interface coordination with Civil, electrical, steel structure, Quality, tanks
36” Offshore Pipelaying -
Qatar Gas II P/L.
installation, and Mechanical disciplines for proper sequence and avoid any
conflict of activities.
2 Jackets fabrication and
installation for Amapetco. Manager-Const. Manager Offshore – Gupco/Amapetco-Egypt 03/012-
07/014
2 Jackets fabrication and
installation for Gupco- Holds complete responsibility to work across phases on offshore platforms.
Saqqara.
Solution oriented with capability to work under pressure to meet contractual
12” offshore pipelaying milestones.
trunk line.
Construction of 2 offshore platforms, drilling 18 wells and pipeline connection
ERC Mega Refinery plant with risers to existing onshore facility.
Project – Mustard – Egypt
New Egyptian Refinery On Shore phase - preparations of Electronic Permit to Work System “Offshore
Plant construction and Manager” to be utilized offshore including creation of Permit to Work procedure.
installation.
Verification and planning of personnel resources and vendors required, in
Revamping/ Rehabilitation cooperation with back office team, organizing and verification of materials with
offshore complex platforms back office team.
BP. Red-Sea.
Supervision and verification from client side of contractor T&I and construction
16” Offshore P/L-18 KM. team.
Boat Landing replacement Supervision of Jackets & Platforms Transport & Installation activities.
&10” Gupco-onshore new
oil U/G- P/L. On Shore phase – Initial requisitions, preparation of various procedures and
necessary checklist for planned operations during construction and
Onshore Qatar-Modification
of Gas Interim Receiving commissioning phase.
Facilities. Dolphin Energy Takeover platform form Shipyard and setting up permit to work system and
Limited Co. Ras Laffan. Emergency organization.
Onshore-Natural Gas
Verification of documentation related to T&I and construction activities offshore,
Liquid-Shutdown-.NGL
Plant- QP-Measied- Qatar. Planning offshore activities and review and site, coordinate with the offshore
barges / vessels and client rep’s, manage Company hired vessel operations and
Onshore-Common Low vessel readiness.
Sulphur Condensate Storage
and Export Facilities. Update looks ahead plan and overall offshore schedule.
Dolphin-Qatar.
Work closely with project teams, engineering, procurement, contracts, and
4- Melamine & Urea fabrication yard
Upgrade Plant- QAFCO. Review the installation procedure and lift plans.
32”,24” &18” Onshore-Qasr Interface with other project’s functions (work packages, Quality, HSE, logistic
Gas Development Project - etc., Interface with Contractor’s operation, reviewing subcontractor technical
Khalda/ Apache, 12” &8” applications responsible of project HSE related and ensure the compliance with
P/L-Merlon &Offshore-
Saqqara 18”-Gupco-BP.
the project regulation.
Onshore-Gas Pre- initiate Company claims and verify with contract teams, SIMOPS management,
Compression Plant -Phase II Project daily meeting attendance and reporting and Process owner for Site
Shell. Egypt. queries, Deviation request and NCR.
Installation of static & Review the overall plan, areas of concerns, prioritizations, risk-mitigating
rotating equipment& actions. control change requests, technical requisitions, Interface with client rep.
modules: Heat Exchanger, in the project for proper performance evaluations, and project execution& hook
Shipping pumps metering, up phase
filtration skids, scrubbers,
air coolers, glycol Define SOW, main objectives, milestones, prioritizations, man-hours duration,
dehydration, API separator resource requirements quality plan, procurement plan, assumptions, resources
(Pig traps) with associated allocations, potential risks, and staffing of the project.
piping.
Oversee implementation of quality and safety standards and procedures are
Gemsa onshore pipeline 20 implemented and followed in accordance with contract requirements and
KM Company guidelines.
Surface piping connections
Managing overall execution& fabrication activities on -day-to-day on/offshore
of two offshore oil wells
SE12 & SE13 of Gemsa operations interface hook up activities, jacket fabrication activities, work /test
offshore platform packages, installation of GRE -deluge system, static and rotating equipment&
punch list/box-up. and ensures the development of plans, procedures, and
Modification (piping effective schedule& cost.
connection for offshore
facilities) of Gemsa offshore Attendance of Shutdown meetings with clients/consultants and keeping them
platform informed of progress reports and aligning to work front and look ahead schedule.
Surface piping connections Manager-Hook Up& Fab.Yard Manager Qatar Engineering& Const. co -Offshore
of new offshore oil well A- 09/07-03/012
11 of Al-Zaafarana offshore
platform Overall supervision development and implement of Yard site fabrication for
jacket (piles, jacket frames,mudmat,caissions,rizers,braces) & planning to execute
Fabrication & installation
new pressure vessel (gas
work, and follows up the activities and the work progress.
floatation unit) for FPSO Al- • Review installation procedure and ensure compliance with the contract
Zaafarana according to documents and Company specifications
ASME VIII div I • Manage and control the Interfaces between operation, contractor and
Steel & piping revamping subcontractor teams to meet the shutdown duration and star up target date.
of FPSO Al-Zaafarana Installation of new accommodation platform of 3500 MT by float-over method
Tanker.
while working in the office, handled detailed engineering, procurement,
fabrication & installation engineering to fabricate offshore installations till final
hand over to client.
Responsible for readiness of all safety equipment’s, inspection, check-
walkthrough and reporting, monitoring of PTW system.
Planning for Lifting plans, coordination and supervision of lifting operations on
platform and between connected units – platform connected with jack-up barge
Ensure that all contractual obligations are satisfied as the company representative,
compliance with relevant legislation, codes of practice, guidelines, industry
standards, company policies and procedures applicable to the area of operation.
Update OIM on frequent intervals on operation and any changes.
Control activities within 500m zone (Supply boat operation, Bunkering, Sub Sea
Survey in 500m zone, Cable pulling operation in 500m zone, Helicopter flights,
and construction works ensures that the Platform is properly and legally manned,
that all statutory surveys and certificates are kept up to date.
Organizing and leading HAZID and RA meetings for jack up barge hook up and
other high risk planned activities during the campaign.
Lead offshore site teams during the work progress, instrumentation, electrical,
mechanical, telecom, scaffolders, rope access and punch team.
Closing punch items and outstanding commissioning dossiers with client.
monitoring the progress by updating Project Plan, daily teleconferences and
DPRs.
Responsible for the safe and efficient operation of the Platform in all aspects of
the Platform's various functions and operations.
Creating and reviewing new emergency and operational procedures to company
Safety Management System.
Lead and guide the marine project team activities for the best performance in
accordance with on/offshore project procedures, regulations standards, and
permit-to-work procedures as applicable, including relevant RLIC procedures.
Ensures Marine Contractor Team construction, fabrication & installation
activities are aligned with scope, schedule, and budget deadlines, within quality
standards and contractual obligations.
Re-organized the resources, scope, and procedures to get better progress and
effective HSE behavior, provides accurate, timely, and routine reports to the Head
Marine on project planning and execution activities
Coordinate between on/offshore fabrication and installation operations included
administration and logistics issues, prepare job cards and hook up reports, resolve
execution and commissioning issues, define the detailed SOW, for offshore
installation, prepare the required resources for offshore (manpower, material,
equipment, maintenance, and repair schedule) as per the contractual obligations
and in line with the schedule/cost plan.
Offshore Senior Field Eng. NPCC-Offshore-Abu Dhabi
06/05-09/07
Supervises the offshore construction of 36” Gas trunk subsea pipe lying with
length 38KM plus integrating and hook up and commissioning of Qatar Gas-
NFB complex. Included planning and coordination of resources.
Demonstrate strong leadership and guidance to ensure the site team is working
effectively to achieve the project objectives within contractual obligations, scope,
schedules, quality& budget encouraging the HSE culture among project
teamwork.
Managing the day-to-day logistic support to the hookup project in an efficient and
cost-effective manner, preparing the progress reports and issue logs relating to the
project as required to senior management.
Ensure that project risk assessments are carried out as necessary and that the
correct mitigation is applied to reduce or eliminate the risk.
Control of resource schedule& budget in accordance with the contract
requirements and monitor the project performance to ensure its timely
completion, performance improvement, and cost control.
Participate in the identification of opportunities for continuous improvement and
sustainability of operations, processes, and practices considering project
standards.
Attendance regular coordination meetings for monitoring of work progress, HSE,
and QC rules implementation.