BRIDGES LOT F0 (LOT-2) status 12/12/2021

KM design done
No BRIDGE NAME LOCATION LENGTH (m) Comment
FROM TO works descrition quantity works descrition quantity
piles 64 piles 64
spread foundation non spread foundation
piles cap 6 piles cap 6 piles length (from 15-18m)
abutment 2 abutment 2 beams length - 42m
1 Bridge No 6 Left F0 7+770.620 7+996.740 226.1 highest pier - 20.5m
piers(h=62 m) 4 piers 4 ( for three spans, 24 beams were installed and the remaining are
cross-beam 4 cross-beam 4 only prefabricated)
beams 42m 40 beams 42m 40
deck 5 deck
piles 64 piles 64
spread foundation non spread foundation
piles cap 6 piles cap 6 piles length (from 15-18m)
abutment 2 abutment 2 beams length - 42m
2 Bridge No 6 Right F0 7+770.620 7+996.740 226.1
piers(h=62 m) 4 piers 4 highest pier - 20.5m
cross-beam 4 cross-beam 4 (for all the fifth spans the beams (40 beams) were installed )
beams 42m 40 beams 42m 40
deck 5 deck
piles 100 piles 100
spread foundation non spread foundation
piles cap 9 piles cap 9 piles length (from 14 -24 m)
abutment 2 abutment 1 beams length - 42 m
3 Bridge No 7 Left F0 8+419.839 8+773.319 353.5
piers(h=119.7m) 7 piers 3 highest pier - 27 m
cross-beam 7 cross-beam (beams are prefabricated only and not installed yet)
beams 42m 64 beams 42m 46
deck 8 deck
piles 100 piles 100
spread foundation non spread foundation
piles cap 9 piles cap 9 piles length (from 14 -24 m)
abutment 2 abutment 2 beams length - 42 m
4 Bridge No 7 Right F0 8+419.839 8+773.319 353.5
piers(h=119.7m) 7 piers 5 highest pier - 27 m
cross-beam 7 cross-beam 2 (beams are prefabricated only and not installed yet)
beams 42m 64 beams 42m 48
deck 8 deck
piles 20 piles 20
spread foundation 2 spread foundation
piles cap 2 piles cap 2
abutment 2 abutment piles length (7 & 16 m)
5 Bridge No 8 Left F0 9+418.167 9+552.380 134.2 beams length - 42m
piers(h=22.1m) 2 piers highest pier - 12.8m
cross-beam 2 cross-beam
beams 42m 24 beams 42m
deck 3 deck
piles 20 piles 20
spread foundation 2 spread foundation
piles cap 2 piles cap 2
abutment 2 abutment piles length (7 &12 m)
6 Bridge No 8 Right F0 9+418.167 9+552.380 134.2 beams length - 42m
piers(h=22.1m) 2 piers highest pier - 12.8m
cross-beam 2 cross-beam
beams 42m 24 beams 42m
deck 3 deck
piles 128 piles 40
spread foundation 4 spread foundation
piles cap 10 piles cap
abutment 2 abutment piles length (from 8 -10 m)
7 Bridge No 9 Left F0 9+621.462 10+269.452 648.0 beams length - 42m
piers(h=33.7m) 14 piers highest pier - 33.7 m
cross-beam 14 cross-beam
beams 42m 120 beams 42m
deck 15 deck
piles 128 piles
spread foundation 4 spread foundation
piles cap 10 piles cap
abutment 2 abutment piles length (from 7 -11 m)
8 Bridge No 9 Right F0 9+621.462 10+269.452 648.0 beams length - 42m
piers(h=36.2m) 14 piers highest pier - 36.2m
cross-beam 14 cross-beam
beams 42m 120 beams 42m
deck 15 deck
piles 16 piles
spread foundation 2 spread foundation
piles cap non piles cap
abutment 2 abutment piles length (ongoing design check)
9 Bridge No 10 Left F0 11+992.699 12+133.804 141.1 beams length - 42m
piers(h=35m) 2 piers highest pier - 19.5m
cross-beam 2 cross-beam
beams 42m 24 beams 42m
deck 3 deck
piles 16 piles
spread foundation 2 spread foundation
piles cap non piles cap
abutment 2 abutment piles length (ongoing design check)
10 Bridge No 10 Right F0 11+992.699 12+133.804 141.1 beams length - 42m
piers (h=33.5m) 2 piers highest pier - 19.5m
cross-beam 2 cross-beam
beams 42m 24 beams 42m
deck 3 deck
piles 147 piles
spread foundation non spread foundation
piles cap 11 piles cap
abutment 2 abutment piles length (ongoing design check)
Right BRANCH VIADUCT
11 Bridge No 11 F0 13+319.200 13+744.500 425.3 beams length -
piers 9 piers highest pier - 16.6m
cross-beam 9 cross-beam
beams 110 beams
deck 10 deck

piles 803 piles 408 51%


spread foundation 16 spread foundation 0%
piles cap 61 piles cap 34 56%
abutment 22 abutment 7 32%
TOTAL
piers 67 piers 16 24%
cross-beam 67 cross-beam 10 15%
beams 654 beams 174 27%
deck 78 deck 0%

Note : only total of 64 beams in bridge 6 were installed


Remaining U-beams in bridge 6 and 7 are only prefabricated and not installed yet
Construction of 3 tunnels for F0 section of E60 highway
Weekly report as of 12/12/2021

Underground 12/5/2021 12/12/2021 For the reporting period


Tunnel length, % of
Number Tunnel length
m drilling
m Upper Lower Invert Final Upper Lower Invert Final Upper Lower Invert Final
1 Tunnel 1 RHS 1520 1480 141.1 144.6 3.5 9.77%
2 Tunnel 1 LHS 1520 1480 158.6 3.0 166.0 8.0 7.4 5.0 11.22%
3 Tunnel 2 RHS 395 370 9.6 11.0 1.4 2.97%
4 Tunnel 2 LHS 370 315 4.6 6.0 1.4 1.90%
5 Tunnel 3 RHS 485 445 0.00%

Total 4290.0 4090.0 313.9 3.0 0.0 0.0 327.6 8.0 0.0 0.0 13.7 5.0 0.0 0.0 8.01%

Number of tunnels under construction 2 Daily productivity 1.96 0.71 0 0

Remaining undergroung length 3762.4


Remaining days to work 1920 5.26
The current status of construction of culverts at F0 section of E-60 highway as of 18/02/2022

Culverts Concrete for culvert


length, Rebar and Concreting of
Item culvert Location type Excavation Bedding Inlet/Outlet Finishing M3
m Formwork Culvert
1 1# 8+120 2.0x2.5 40 100% 100% 100% 100% 100% 95%
2 2# 8+995 4.0x2.5 36 100% 100% 100% 100% 100% 95%
3 3# 9+240 2.0x2.5 52 100% 100% 100% 100% 100% 95% Culvert done by Astadi
4 4# 11+890 2.0x1.5 46
5 5# 12+625 2.0x2.5 46
6 Arch Culvert # 6 12+716 170

390 0